A swim spa shell is the easy part to compare. What separates a smooth handover from an expensive site problem is everything wrapped around that shell: how it is finished, what equipment sits inside the cabinet, how power reaches it and who signs off on the configuration before production starts. This article walks through the finish details buyers should confirm for Outdoor Swim Spa WS-115AⅬ-U before an order is placed.

Use the checklist below as a request-for-confirmation list. Every item either appears in the published catalogue entry for this model or sits in the manufacturer’s listed option group, so each point can be answered in writing by the supplier rather than assumed on site.

Start with the catalogue specification, then mark what is missing

Item shown in the catalogueValue listed for WS-115AⅬ-U
Catalog dimensions3880 × 2200 × 1250 mm
Jet total23 pcs
Water pump4 pcs
Filter pump1 pc
Control system1 set
LED lights1 pc
Total power11.85 kW
Swim training systemNot listed for this model
Features shownWater jets, LED lighting, Ozone

Figures above are transcribed from the catalogue entry. Treat them as the starting point for confirmation, not as a purchase specification.

Two things in that table deserve attention before anything else. First, total power is listed at 11.85 kW, which is a substantial electrical load and drives the supply, protection and cable sizing decisions your electrician will need. Second, the swim training system is marked as not listed for this variant. If your project brief assumes lap swimming against a current, that assumption has to be resolved now: either the requirement changes, or another model in the swim spa range is selected instead.

Finish details to lock down with the supplier

1. Shell and interior surface

Confirm the shell material and finish grade in writing, together with the colour or surface option you have specified. Related spa products in the same range are described as acrylic shells with structural reinforcement, but that description belongs to those listings and should not be carried over to this model without confirmation. Ask for the exact surface specification, the edge profile at the waterline, and how the interior is finished around jet fittings, since those are the points where finish quality shows first.

2. Cabinet, cladding and insulation

Insulation appears in the manufacturer’s option list for this range, so its inclusion is a configuration choice rather than a given. Confirm whether the cabinet insulation is included or optional, what material and thickness are used, and how the cladding panels are fixed and accessed. Access matters operationally: pumps, filters and the control system sit inside that cabinet, and a clad enclosure with no service opening creates maintenance problems later.

3. Jet layout and seating positions

The catalogue records 23 jets in total. Ask for a jet map showing position, type and direction relative to the seating and lying positions, plus which jet group is served by which of the four water pumps. A jet count on a spec sheet says very little on its own; the layout determines whether the hydrotherapy zone actually works for the users you are designing for.

4. Water treatment and sanitation

Ozone is shown as a feature of this model, and UV sterilization sits in the option list. Confirm which sanitation package your quotation includes, whether both systems are fitted, and what consumables need replacing on a schedule. Also confirm the filtration route: the catalogue shows one filter pump, and sand filtration is listed as an option for the range, so it needs to be stated explicitly if your project requires it.

5. Lighting and controls

One LED light is listed for this variant. If the design intent calls for lighting on more than one side or a colour-changing scheme, raise that as a change to the standard configuration. For controls, confirm what the single control set comprises, where it is mounted, and whether additional remote or wall-mounted control points are available for your layout.

6. Heating

Heat pumps appear in the listed options for this range rather than as a fixed feature of the catalogue entry. Confirm whether heating is included in your quotation, what capacity is proposed, and how the heating load relates to the 11.85 kW total power figure already recorded. Heating is usually the largest single addition to a swim spa’s running demand, so it should be settled before the electrical design is finalised.

7. Access and safety items

Steps are listed as an option for this range. Confirm whether steps are included, their dimensions and fixing method, and how they align with your deck or paving level. If the spa will sit above ground level, also confirm handrail or grab-handle options and the slip resistance of any surface supplied with the unit.

8. Site preparation and interfaces

The catalogue gives external dimensions of 3880 × 2200 × 1250 mm, which is enough to plan a plinth or recess, but you still need the supplier’s foundation drawing, drainage requirement and clearance dimensions for equipment access. Confirm who supplies the base, who handles drainage connections, and where the isolation point should sit relative to the cabinet.

9. Electrical supply and protection

With 11.85 kW of total power recorded for this configuration, confirm the required supply voltage and phase, circuit rating, protective device type, cable routing and the location of the isolator. The catalogue entry itself instructs buyers to confirm included equipment and electrical requirements for the selected configuration, so treat the electrical schedule as a deliverable from the supplier rather than an on-site decision.

10. Packaging, delivery and handover

Confirm crate dimensions and total weight against your access route and lifting arrangements, plus who unloads on site. At handover, ask for the packing list, the confirmed configuration sheet, wiring diagrams and the operating and maintenance documentation. For villa and hospitality projects where the spa is one line in a wider package, the project services covering logistics and installation support are worth referencing in the same purchase order so responsibilities are not split across separate contracts.

Where finish detail usually goes wrong

Most swim spa disputes do not concern the shell. They concern a model variant being substituted without written agreement, an option such as insulation or steps being quoted but not supplied, an electrical supply prepared for a different load, or a cabinet that cannot be opened without removing cladding. Each of these is prevented by one simple step: getting the confirmed configuration in writing against your order, with the option list marked item by item.

If you are comparing several models in this range, keep the comparison on identical fields — dimensions, jet count and layout, pump count, lighting count, total power, sanitation package and included options. Comparing a model that lists a swim training system against WS-115AⅬ-U, which does not, is where specification errors enter the project.

Documents to request before placing the order

  • Confirmed configuration sheet for WS-115AⅬ-U, with options marked as included or excluded
  • Dimensioned general arrangement drawing with service clearances
  • Jet layout diagram showing position and pump assignment
  • Electrical schedule: supply requirement, circuit rating, protection, isolator location
  • Sanitation package description with consumable replacement intervals
  • Cabinet construction and insulation detail, including access method
  • Foundation and drainage requirement drawing
  • Packing list, crate dimensions and gross weight for delivery planning
  • Operation and maintenance documentation in the language your site team uses

SANTERSON manufactures and supplies outdoor swim spas, furniture and building materials for villa, hospitality and office projects, with custom/OEM service, door-to-door logistics and installation support. Send the model reference WS-115AⅬ-U together with your site conditions and the option list you need quoted, and request the confirmed configuration sheet before production is scheduled.