A quotation for Santerson Flush Hinged Doors usually arrives as a PDF, a table of sizes and a unit rate. Most buyers read the price line and move on. That is the mistake that costs money later, because a flush hinged door is not a catalogue item you can swap out: the leaf, the frame, the wall build-up and the opening detail have to agree with each other before production starts. This guide walks through what a serious proposal should contain for this type of door, and what to question when it does not.
1. Check that the opening schedule matches how you measured
Flush hinged doors sit level with the finished wall surface, so the tolerance you are working to is far tighter than for a standard hung door. The proposal should show a separate line for every opening, not one averaged size across a floor. For each opening it needs three things: the structural opening, the required frame size and the finished floor level at that doorway.
Ask two questions before you approve anything. First, who measured, and was the measurement taken after the wall lining and floor finishes were set? Second, are the heights quoted as frame dimensions or as leaf dimensions? If a schedule only gives a nominal width and height with no reference to the wall build-up, treat it as an assumption rather than a confirmed size. Santerson’s door pages state that finish, layout and dimensions are specified per project and that dimensions should be confirmed for each order — so a proposal that skips that confirmation step is incomplete, regardless of how attractive the rate looks.
2. Read the specification, not just the product name
The same door can be described as flush, concealed, wall-aligned or invisible depending on who wrote the document. In the SANTERSON range these are genuinely different details: Santerson Flush Interior Doors is a separate collection from Santerson Handleless Concealed Doors, and each has its own frame, ironmongery allowance and finish options.
A usable proposal names the collection, states the core and substrate, states the surface finish, and says plainly what is included and what is not. Where the site documentation does not fix a material or a thickness for a given model, ask for it in writing for your order instead of accepting the model name as a specification. Vague wording such as “standard panel door” on a flush detail is where variation orders begin.
3. Verify what is priced in: leaf, frame, ironmongery, finishes
Break the unit rate into parts and check each one is present:
- the door leaf, with its edge treatment and any pre-machining for locks and hinges;
- the concealed frame and architrave solution, including how the reveal is closed at skirting and cornice;
- hinges, lock body, strike plate and handle or recessed pull — and whether the load rating of the hinges matches the leaf size quoted;
- site-applied finishes: primer, lacquer, veneer or laminate, plus who applies them;
- thresholds, seals and any acoustic or privacy requirement if the door serves a bathroom, bedroom or office.
If ironmongery is excluded, say so in your own cost plan and check compatibility early. A large flush leaf on lightly rated hinges sags, and the first symptom appears after handover, when adjusting the frame is expensive.
4. Test the maker’s coordination capability
Flush doors fail on site mostly because of poor coordination, not poor timber. The proposal should therefore show how the manufacturer hands information to your builder: setting-out drawings for the frame, a fixing detail against your wall type, and a clear point at which you must freeze the sizes. Santerson describes a workflow that runs from design consultation and space planning through material selection, production coordination, logistics and installation support — details are on the interior design services and project services pages. What matters is not that these stages exist but that your proposal references them: drawings issued for approval, a sign-off date, and an installation sequence.
A practical test: send the maker one awkward opening — a door beside a curved or paneled wall, or an opening with limited head height — and see whether they respond with a detail drawing or only a price. The quality of that reply tells you more than any brochure.
5. Scrutinise packaging, freight and delivery sequence
Doors are damaged in transit more often than in use. Ask how leaves and frames are packed, whether edges are protected, and how each unit is labelled against your opening schedule. For overseas supply, the proposal should state the Incoterms being quoted, what documentation is included for customs clearance, and which delivery point the price covers. Freight quoted to port is not the same as delivery to site, and re-ordering a single door after a shortage is far slower than getting the quantity right at the start.
Also check the delivery sequence against your programme. Frames for wet areas usually need to go in before wall linings close up; leaves can arrive later. A supplier who will stage shipments by zone saves your trades several return visits.
6. Confirm after-sales terms in writing
Ask what happens if a leaf arrives damaged, an opening is out of square on site, or a finish does not match the approved sample. The answer should cover who pays for replacement, how quickly a replacement can be produced, and whether adjustment or replacement guidance is provided remotely. Keep this in the contract rather than in email correspondence.
7. Compare proposals on a like-for-like basis
Put two or three offers side by side using the same columns: confirmed dimensions per opening, included components, finish responsibility, drawing stage, packing method, freight terms and after-sales commitments. Price differences usually collapse once you equalise these; where a rate stays much lower than the rest, find out which item has been left out.
For whole-project work it is also worth asking whether the doors can be specified together with related joinery and wall finishes from one supplier. Where cabinetry, paneling and windows and doors come from the same production line, matching veneers and profiles become a single approval instead of three.
Before you sign
A proposal for flush hinged doors is ready to accept when it lists every opening with confirmed dimensions, names the collection and finish precisely, itemises leaf, frame and ironmongery, includes an approval drawing stage, states packing and freight terms, and sets out after-sales responsibilities. Anything missing should be closed in writing before production begins — that single step protects both your budget and the finished line of the wall.
To have a door schedule reviewed against these points, send your opening list to SANTERSON through the contact page; sizes, finish options and what is included in the quotation can then be confirmed before production starts.