A pocket door saves the swing radius a hinged door wastes, which is exactly why specifiers choose it for ensuites, pantries, powder rooms and study nooks. It is also the door detail most likely to come back wrong on site, because the opening, the wall build-up and the leaf all have to agree before the framing closes. If you are buying from a factory rather than picking up a stocked leaf at a local yard, that agreement has to happen on paper, in the quotation stage. This guide walks through what to send when you request a custom quote for classic pocket doors, and what a serious manufacturer will ask you in return.

SANTERSON's Classic Pocket Doors are made-to-measure: sizing, material, finish and layout are specified per project. The product page states this plainly and ends with an instruction to confirm dimensions and selected specifications for each project. Treat the quotation as that confirmation step, not as a price check.

What "Classic" Means In This Collection

The word classic refers to the door face, not to the sliding hardware. Classic pocket doors sit in the same Pocket Doors collection as glass pocket doors and wood veneer pocket doors, and they share the same made-to-measure basis. What differs is the panel design and finish, which is where a traditional paneled look can be matched to hinged doors, skirting and joinery elsewhere in the same building.

That shared basis matters when you are furnishing a whole villa or apartment block. Doors, wardrobes, cabinetry and wall panelling can be specified against one set of drawings and produced under one purchase order, instead of being stitched together from several suppliers whose tolerances never quite line up.

Before You Write: Three Decisions To Lock Down

Send an enquiry that already answers these, and the quotation comes back with fewer questions attached.

  • Single or double. A single pocket door slides into one cavity; a bi-parting pair splits in the middle and needs roughly twice the pocket depth. Double doors suit wide openings between a living room and a study, or a main bedroom into an ensuite dressing area.
  • New build or retrofit. In new work the cavity frame is set before the wall is closed, so you control the stud line. In a retrofit the existing wall dictates what is possible, and you may be trading leaf width against structural work. Say which one it is in your first message.
  • Wall finish and thickness. Plasterboard, brick, tile or stone cladding all change the finished face level, and the frame has to be set out to that finished level rather than to the bare structure. Give the wall build-up, not just a rough opening.

The Information To Put In Your Enquiry

A quote request for made-to-measure doors is really a set of instructions to your supplier. The more of the following you include, the closer the first number will be to the final one.

ItemWhy the factory needs it
Opening width and finished floor-to-ceiling height, in millimetresSizing is made to measure, so rough feet-and-inches estimates force a round trip before anyone can price the job.
Wall thickness and the finish on both facesDetermines frame depth and how much of the jamb reveals itself after the lining goes in.
Leaf layout per opening: single, double or bi-partingChanges pocket length, track loading and the number of leaves to produce.
Panel design and finish referenceClassic doors are specified by panel style and finish; a sample code, photograph or existing joinery reference keeps colour and grain consistent across the project.
Hardware preference: track, hangers, stop, floor guideGlass leaves and heavy paneled leaves load a track differently; state the leaf material so hardware is matched to weight.
Quantity per opening type, plus a door schedule if you have oneRepeating one opening across six rooms is priced very differently from six unique openings.
Delivery address and destination portFreight mode and packaging are quoted against the actual destination, and doors are long, flat and easily damaged in transit.
Project type and programme dateA villa retrofit and a hotel fit-out have different phasing, and production is scheduled around when the site needs the doors on the floor.

If you are working from drawings, send them. A marked-up plan with each opening labelled is worth more than a paragraph of description, and it becomes part of the record both sides work to.

How The Quotation Comes Back From A One-Stop Supplier

SANTERSON describes its cooperation steps as project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. In practice that means your door enquiry does not sit alone in a queue; it can be handled inside the same workflow as the joinery, wardrobes and panelling around it.

Expect the returned quotation to specify the leaf construction, the selected finish, the frame and pocket arrangement, and the hardware set — with the dimensions written out rather than implied. Read those dimensions back against your own schedule before you approve production. Once the cavity framing is closed on site, correcting a leaf that is 40 mm too narrow is a demolition job, not a simple adjustment.

Where the doors are part of a wider package, the same coordination covers material selection and product specification, manufacturing and quality control, then site coordination and handover. For an overseas buyer this is where a single supplier earns its keep: one set of shipping documents, one loading plan, one point of contact for the snag list.

Freight, Packaging And What To Check On Arrival

SANTERSON states global freight forwarding by sea, air and rail, with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Ask for the packing list in advance so you know how many crates to expect and what each contains, and check the following the day the doors land:

  • Leaf count against the schedule, opening by opening, before anything is unloaded to a storage area.
  • Finish condition on the visible face of each leaf; paneled and veneered faces show transit damage at the edges first.
  • Hardware sets matched to their labelled openings rather than thrown into one loose box.
  • Frame lengths against the wall build-up you supplied, so nothing is cut on site without a decision recorded.

Store leaves flat and dry, off the ground, until the walls are painted and the floor finish is down. Installing early is how a quoted door becomes a damaged one.

Common Reasons A Pocket Door Quote Has To Be Redone

  • Opening measured to the structural frame instead of the finished face. Plasterboard, tile and cladding all take up depth; measure to what the room will look like when it is finished.
  • Cavity too shallow for the chosen layout. A double leaf needs a longer pocket than the wall usually allows, and discovering that after framing means rebuilding.
  • Hardware specified without the leaf weight. Track and hangers are matched to load; quote the leaf construction and finish together with the ironmongery.
  • Closet depth fighting the door run. Wardrobe carcasses, niches and panelling return from the same drawings — wall panel systems in particular change the finished wall line the pocket has to clear. Coordinate them in one enquiry.
  • No door schedule on a multi-unit project. Repeating openings must be numbered consistently, or crates arrive at the wrong floors.

A Short Checklist To Paste Into Your Enquiry

  • Project location, project type (villa, apartment, hotel), and required site date
  • Door schedule: opening number, clear opening width, height, wall thickness, single or double
  • Panel style and finish reference for each opening type
  • Hardware preference, or a note asking the factory to match hardware to the specified leaf
  • Delivery address and preferred freight mode
  • Drawings or photographs of the openings, marked up with dimensions in millimetres

Send that, and you are asking for a quotation the factory can price without guessing.

Start your enquiry. Send your door schedule, opening dimensions in millimetres and finish references to SANTERSON, and confirm every dimension and specification before production begins. Contact details are on the contact page.