A wardrobe that mixes lacquered panels with glass fronts looks simple on a drawing and behaves very differently on site: two materials, two fixing details, two sets of tolerances. Before we cut any panel for a Glass & Lacquer Combination Wardrobe, we want a written installation plan that settles the room, the order of works and the handover checks. Here is what that plan should contain.

1. A measured drawing, not a catalogue size

Our made-to-measure wardrobes are dimensioned from the finished room, so the plan starts with a site survey taken after the final floor and wall finishes are in place. Record the out-of-square of walls, the position of skirtings and architraves, ceiling level variation, and the depth actually available once doors and handles swing. Note every obstruction: switches, sockets, radiators, downlights, air-conditioning diffusers, curtain boxes and pendants that will sit in front of a glass panel.

In an existing property, take levels at several points along the run. A wardrobe line spanning an uneven floor needs a scribe or packing detail decided on paper, not improvised with shims on the day.

2. Layout and internal zoning agreed before production

The plan shows hanging rail heights, shelf spans, drawer banks, tray and shoe positions, and any lighting provision, matched to how the space will be used. A bedroom shared by two people needs separate short-hang zones; a dressing room may need open display niches behind glass. We agree this zoning with the client or designer at quotation stage, because moving a shelf standard after the carcass is drilled leaves visible marks in a lacquered interior.

Confirm the door type at the same time. Hinged doors need clearance to open fully; sliding doors need track depth and a level running surface; a glass front changes the weight carried on the hanging side.

3. Finish schedule for both materials

A combination wardrobe carries at least two finish decisions, and the plan names each one: the lacquer tone and sheen for solid panels and frames, and the glass type for display areas — clear, bronze, smoked, frosted or ribbed. Sheen is where projects go wrong most often. A high-gloss door beside a matte carcass reads as a mistake even when both are correct to sample.

Record the direction of any grain or texture, the edge treatment on visible ends, and which face of the glass is finished. Ask for a physical sample board for both materials rather than accepting a screen image, and keep that board for comparison at handover.

4. Site conditions and moisture

Lacquer panels and glass are finished goods; they should not arrive into a wet trade. The plan states which trades must be complete before delivery: plastering, painting, floor laying, tiling, and any screed or render that needs drying time. Where the wardrobe sits against an external wall or shares a wall with a bathroom, note the wall condition and the ventilation available in the room.

State storage arrangements as well. Panels stay flat, dry and wrapped until they are lifted into position; glass fronts are kept upright and protected on site.

5. Sequence, access and protection

Built-in joinery is bulky. The plan maps the route from the delivery point to the room: stair widths, lift dimensions, corridor turns, door openings, and whether panels can be carried vertically. It then sets the order of work — carcass assembled and levelled first, doors hung and adjusted second, glass fronts and handles last — so a knocked panel is not the final item installed.

Include protection for the finished room: floor coverings, wall guards on the access route, and a clean, dust-free room for the glazing step.

6. Fixing method and interface details

Write down how the units connect to the structure and to each other, what packing is used at an uneven wall, how the top is closed to a ceiling that moves, and how skirtings are scribed or cut. For glass panels, specify the fitting type, whether the panel is drilled or supplied with pre-fitted hardware, and the clearance needed for handles.

Where the wardrobe meets other joinery from the same package — built-in furniture such as vanities, tall cabinets or media walls — the plan shows the interface line and which trade closes the gap.

7. Inspection and handover checklist

The plan ends by defining what "finished" means: doors aligned and closing without rubbing, drawers running freely under load, shelves level, glass clean and free of edge chips, protective film removed, and the finish checked against the approved sample. Snags are written down with an owner and a date, not left verbal.

Add care notes for both materials — what to wipe lacquer with, what to avoid on glass fronts, and when fittings should be re-checked after the building has settled.

8. Responsibilities, programme and contacts

Name the people who sign off the survey, release production, receive the delivery and carry out the installation. Our project work runs from design through interior design services, production, logistics and on-site support, so the plan shows which stage each signature belongs to and what happens if a site dimension changes after release.

Add dates other trades can rely on: survey date, drawing approval, production release, expected arrival, installation window. A built-in wardrobe holds up no one only when the surrounding trades know those dates in advance.

Settle the plan before the order

Where a project sources wardrobes together with custom and OEM furniture manufacturing, cabinetry, doors and interior finishes from one supplier, the installation plan is the document that keeps the package coordinated. Send us the room drawings and finish preferences and we will return a made-to-measure proposal for the wardrobe line, with fixing details and a handover checklist set out for your site.