A shelving quotation is rarely one number. It is a stack of small decisions — which wall carries the load, what the shelves are made of, how deep they run, whether they arrive flat-packed or assembled. Read those decisions line by line and you can compare two suppliers honestly instead of guessing which one is cheaper.

As a China furniture manufacturer for global projects, we take corner-shelving enquiries week in and week out, and the enquiries that turn into smooth orders share one trait: their quotation answers the questions below before anyone has to ask them.

Santerson Corner Open Shelving sits in the Open Shelving range and is specified per project: finish, layout and dimensions are set for each space rather than picked from a fixed size list. That flexibility is useful on site, and it is exactly why two quotations for the same corner unit can look nothing alike.

Start with the wall, not the shelf price

Corner open shelving behaves differently from a straight run. One leg usually carries more weight than the other, and the return leg meets an adjacent opening, a vanity or a door swing.

Before you read any price line, confirm that the quotation states which wall each leg fixes to and how the unit is anchored.

  • The substrate behind the fixings — masonry, timber stud, tiled stud wall or plasterboard. Fixing detail changes with it.
  • Finished dimensions at both returns, measured after tiling and waterproofing, not at first fix.
  • Clearance to the door swing, mirror cabinet and any shower screen already on the drawing.
  • Whether the unit is fixed to one wall, two walls, or the floor as well.

If a quotation gives only "1 off corner shelf" with no fixing note, ask for it in writing. That single omission is where variation orders come from.

Match the finish to the room's damp and wear exposure

Bathroom shelving sees steam, splashes, cleaning products and hands grabbing edges all day. The board material and its edge treatment decide how well it survives that.

  • Board core and surface — laminate, lacquer or veneer, and whether the specification names them explicitly.
  • Edge banding on all four edges of every shelf, including hidden faces. Exposed edges are where moisture damage starts.
  • Colour and grain reference — a code or sample number, not a colour name such as "grey oak".
  • Hardware finish — bracket, pin and rail finish matched to the tapware and accessories already specified.

Where the quotation offers a choice of finishes, ask what each one costs rather than accepting a single default. A project can mix finishes across bathrooms once the price difference is visible.

Check dimensions and load against how the shelves will be used

Depth and spacing are easy to overlook in a quotation and obvious the day the fit-out is handed over. A 150 mm deep shelf cannot take folded towels; a 350 mm deep shelf projects into a circulation zone.

  • Clear internal depth at each return, and shelf spacing on the drawing rather than in a general note.
  • Adjustable or fixed shelves. Adjustable shelving forgives late changes to storage mix.
  • Stated load capacity per shelf, with the span it applies to.
  • Whether glass shelves are offered, at what thickness, and with which supports.

For the Santerson Corner Open Shelving item, dimensions and installation requirements are confirmed per project. Treat any capacity figure in a quotation as an engineering statement worth asking about — shelf depth, span between supports and fixing type all change it.

Read what is excluded

The cheapest headline price usually excludes something you will pay for later. Compare exclusions line by line across quotations.

  • Site-measure visit and shop drawings, and how many revision rounds are included.
  • Packaging for long-haul transport, protective crating and palletisation.
  • Freight terms and the point where responsibility passes to the buyer.
  • Installation labour, after-hours access charges and making good around fixings.
  • Replacement parts for hardware and any damaged panel on arrival.

If you are also sourcing floating shelves or other bathroom storage from the same order, ask whether they ship in the same consignment. Split consignments cost more in freight and in site supervision than most buyers expect.

Confirm what happens after the order is placed

A quotation should describe the path from signature to handover, not just the price of the unit.

  • Approval drawings returned before production starts, and who signs them off.
  • What changes are free after approval and what triggers a re-quote.
  • Packing list detail — each unit labelled with its room or wall reference.
  • Inspection at delivery, and the window for reporting transit damage.
  • Who attends site for installation and snagging, and what happens afterwards for spares. Our installation and after-sales support covers on-site fitting, inspection and replacement parts.

Compare two quotations on one sheet

Put two quotations side by side with these rows: wall and fixing method, finished dimensions at both returns, board core and edge treatment, finish reference, shelf depth and spacing, load capacity, packaging and freight terms, installation scope, and the after-sales terms. Two quotes that look different in price often converge once exclusions are added back — and when they do not, the reason is visible.

Send us the drawing and the rooms involved, and we will quote against them: measured dimensions, named finishes, fixing detail and a packing list your site team can work from. Contact SANTERSON to start that specification review.