An above-counter vessel basin looks simple on a drawing: one bowl, one countertop, one tap hole. On a real project it travels across an ocean, sits in a container for weeks, and then has to line up with stone that somebody else fabricated. That is where bathroom orders go wrong. Below is how we prepare a project order of Santerson Vessel Basin (Above Counter) for international delivery, stage by stage, so the basins arrive ready to install rather than as a box of claims.
Start with the specification, not the quantity
This basin is configurable: finish, layout and dimensions are set per project, so the order sheet needs to say what each bathroom actually requires before anything is produced. For every room type on the schedule, confirm:
- The bowl size and shape against the countertop drawing, including how far the basin overhangs the counter edge.
- Tap-hole position and the tapware you intend to pair with it, so the deck is drilled for the right set.
- The waste and trap arrangement already in the substrate, and whether the basin's outlet suits it.
- Finish samples approved in writing, since a glaze or surface that reads well on a screen can look different under site lighting.
Getting these four items settled at quotation stage is cheaper than resolving them after the container has been loaded. Where a project mixes basin types, we spec them together — an undermount basin in the main bathrooms and a vessel basin on display counters — so heights, wastes and finishes stay consistent across the job.
Group the bathroom package into one shipment
Vessel basins rarely travel alone. A guest bathroom order usually pulls in toilets, a shower set, a mirror light and sometimes cabinetry from the same fit-out. Ordering these as one turnkey package rather than as separate purchases means one production window, one packing list, one container and one set of documents — and it lets us pack the ceramics around each other instead of shipping air.
If your project is still assembling its specification, our custom and OEM service covers bespoke finishes, dimensions and branding, with flexible minimum order quantities for mixed room types.
Pack ceramics for the route they will actually take
Ceramics fail in transit for two reasons: point impact and long vibration. Our packing is built around both. Each basin sits in a moulded inner cushion, inside a rigid carton, inside a crate that can be fork-lifted without the weight landing on the bowl. Crates are stacked so no carton carries another crate's corner, and fragile items are loaded against the bulkhead rather than against door hardware.
- Mark each crate with the room or bathroom number from your schedule, so crews unpack into the right rooms instead of opening everything in a corridor.
- Photograph the loaded crates and the packing layers before sealing, so any later damage claim has a baseline.
- Pack spare basins for the rooms most exposed during construction — builder traffic damages more basins than shipping does.
Choose the freight mode against your site programme
Sea freight carries volume at the lowest cost and is the usual choice for a full bathroom package. Air suits small top-up orders — the last few basins for rooms that changed late — and rail sits between the two on some corridors. Through our logistics and door-to-door delivery service, we arrange forwarding by sea, air and rail, plus the paperwork that goes with it: commercial invoices, packing lists, certificates of origin and the import documentation your customs broker will ask for.
Two practical points on Incoterms. If you buy FOB, your side appoints the carrier and controls the sailing, which suits buyers with their own freight contracts. If you buy door-to-door, we hold the booking and the delivery appointment, which usually means fewer handover gaps for a site team that is not used to clearing imports. Whichever you choose, ask us to phase deliveries by room block: basins needed in month nine should not arrive in month three and spend six months on a dusty floor.
Insist on the same measurements at both ends
The single most common installation problem with vessel basins is a mismatch between the countertop cut-out and the bowl, because the stone was templated before the basin specification was frozen. Two habits prevent it:
- Issue the basin dimension sheet to the stone fabricator before templating, not after, and record the approved version number.
- Have one named person on site sign off delivered crates against the packing list within a few days of arrival, while damage is still claimable.
Our installation and after-sales support covers site inspection, snag lists, spare parts and replacement for the order we supplied. Warranty terms and response times vary by project and region, so we confirm them in writing for your specific scope rather than quoting a general promise.
A pre-delivery checklist you can hand to your site team
- Approved finish sample on file, referenced by project number.
- Basin dimension sheet issued to the countertop fabricator and signed off.
- Tapware and waste confirmed compatible with each bowl.
- Crate labels matched to room numbers on the bathroom schedule.
- Delivery split by room block, timed against the site programme.
- Documents ready for clearance: invoice, packing list, certificate of origin.
- Named site contact for receiving inspection and damage reporting.
As a China-based manufacturer of furniture and building materials, SANTERSON supplies bathroom ceramics alongside the rest of the fit-out, which is why we plan the delivery as part of the project rather than as a separate transaction. Tell us where the site is and when the bathrooms are needed, and we will work backwards from that date.