A high gloss black wardrobe door looks simple on a rendering. It is the least forgiving item in a bedroom fit-out to buy from drawings, because every millimetre of wall, floor and ceiling deviation shows up in the gap line, and every undocumented finish decision turns into a variation order on site. If your procurement team is specifying black acrylic wardrobes for a villa or apartment package, the paperwork you collect before the order is placed matters more than the finish sample itself.

The notes below are the record set we ask buyers to build. They come from the manufacturer's side of the table — someone has to produce and deliver against these documents — so where a number or a specification is missing, assume production will come back to you for it.

Start with the room, not the product page

Wardrobe specifications fail at the boundary conditions. Before comparing finishes, capture the shell: finished floor level, and whether the screed or topping is still to be poured; ceiling height measured at both ends of the run and at the middle, not one spot; the position of skirting, architraves, light switches, air-conditioning grilles, curtain boxes and door openings relative to the wardrobe line. A made-to-measure carcass can absorb a wall that is slightly out of plumb when that deviation was recorded in advance. It cannot absorb a deviation nobody measured.

For each room, record the run length from finished face to finished face, the available depth at the shallowest point — walk-in robes are frequently deeper above a beam than below it — and the clear swing or slide envelope the doors need. Black surfaces make shadow gaps obvious, so also note whether the intent is a flush reveal, a scribed filler, or a face-set installation. That single decision changes both the survey tolerance and the price.

Specify finish, sheen and panel direction in writing

"Black" is not a specification. On one project you may be quoting a mirror-depth gloss, a satin surface, or a soft-touch matte; these read differently under the same lighting design and show handling marks at different rates. Our matte acrylic wardrobes and white acrylic wardrobes are produced on the same made-to-measure basis, with finish, layout and dimensions specified per project — which means the finish family is a decision you make, not a catalogue constraint. That flexibility only works if the decision is documented before production starts.

For coloured or patterned panels, record the panel orientation as well as the colour reference. Panels cut from different batches, or rotated relative to one another, can read as two different blacks on a single elevation. Where a run turns a corner or wraps an L-shape, note which way each face is oriented and confirm that orientation on the shop drawing.

Lock the interior layout against how the space will be used

The exterior is what gets signed off; the interior is what the client lives with. Document hanging zones by garment type — short hang, long hang, and whether double rails are wanted — drawer counts and depths, shelf spans, and dedicated items: suitcases, ironing boards, vacuum cleaners, safes, or a built-in hamper. Note the rail heights you intend, because a tall wall does not automatically make a top shelf reachable.

Where doors and drawers meet, record clearance for handles or a handleless profile, and confirm drawer fronts will not foul an adjacent return. If integrated lighting is wanted, fix the driver location and cable route now; retrofitting a transformer behind a sealed black panel belongs on nobody's handover punch list.

Record substrate, hardware and edge treatment

The surface layer is only part of what you are buying. Specify the carcass and door substrate, the edge banding or edge treatment method, hinge and slide brand and model, drawer load ratings, and whether soft-close applies to every opening element. Quotations that look identical often differ here, so ask for these items listed line by line and compare like with like across suppliers.

For wall-mounted or suspended systems, the fixing method into the actual wall construction needs to be stated and accepted by the site team. Plasterboard, brick, block and lightweight partition each need different anchors and different preparatory work. This is a shared responsibility between supplier and contractor, and it belongs in the record with both parties named.

Keep sample, drawing and sign-off on one version trail

Every project should hold one controlled set: a signed finish sample with its batch or code reference, dimensioned shop drawings for each room, a written interior layout, and dated approval of both. When something changes — a rail moved, a drawer deleted, a reveal detail altered — it goes into a revision with a date and an author attached. Version drift is the most common reason a wardrobe arrives correct against one drawing and wrong against the wall it has to fit.

Confirm dimensions and selected specifications for each project before release to production, and keep that confirmation in the same folder as the purchase order. If your supplier also handles design coordination, state clearly which party takes final site verification measurements, and put it in the scope of work.

Plan packaging, delivery and hand-over

Gloss panels are damaged in transit and on site more often than matte ones. Document the packaging standard — edge protection, panel separation, corner guards — and a packing list per room that matches the shop drawing numbers. Record who receives the goods, what inspection happens at delivery, and what happens if a panel arrives chipped: replacement lead time, who carries the cost of a second shipment, and whether a repair kit ships with the consignment.

For projects overseas from the factory, agree delivery terms and the receiving party in writing. Our service scope covers freight forwarding, export paperwork and door-to-door delivery within the turnkey project services, while Incoterms, import duties and site access are settled project by project rather than assumed.

The document checklist to carry into the next wardrobe order

  • Measured survey: run length, height at three points, depth at the shallowest point, floor level, skirting and services positions — dated, with the surveyor named.
  • Elevation drawings showing reveal detail, door type, and the orientation of every panel face.
  • Finish schedule: colour or code reference, sheen level, substrate, edge treatment, batch reference, and a signed physical sample.
  • Interior layout: hanging heights, drawer counts and depths, shelf spans, dedicated storage items, lighting points and driver location.
  • Hardware schedule: hinges, slides, load ratings, soft-close scope, handle or handleless profile.
  • Fixing method against each wall construction, with site responsibility named.
  • Packaging standard and packing list per room, keyed to drawing numbers.
  • Change log with dates, plus one dated production-release confirmation.

None of this is paperwork for its own sake. Each line removes one argument on site, and together they are what let a made-to-measure black wardrobe be judged on the finished installation rather than on the excuses around it. Where the package also covers built-in furniture for bedrooms, kitchens and bathrooms, send us the survey drawings and finish schedule and we will return dimensioned shop drawings for your sign-off before anything enters production.