A quote for Two Tone Veneer Cabinets is not a single number you can read off a catalogue. The cabinets are made to measure, so the price follows the room: wall lengths and heights, the run of tall units, the appliance schedule, the veneer species and how the two tones are split across tall and wall units. Send an incomplete enquiry and you will get an estimate that has to be re-priced after the drawings arrive. Send the information below and the quotation you receive can actually be compared with the ones from your other suppliers.
At SANTERSON we build these cabinets as part of the Wood Veneer Kitchen Cabinets collection, for residential kitchens where the wood tone carries the design and a lighter second tone keeps the room from feeling heavy. The same two-tone logic also appears in our Two Tone Veneer Wardrobes, so villa owners often specify both from one production run.
What drives the price of two-tone veneer cabinetry
Three things move the number more than anything else, and all three are decided before a single panel is cut:
- The linear run and the vertical work. Base units and wall units are measured in metres of run; tall cabinets, pantries and integrated appliance housings are counted as individual items because each one needs its own carcass, ventilation and fixing detail.
- The veneer and the finish. Veneer species, grain direction, book-matching and whether the surface is matte or glossy all change material cost and hand-finishing time. Two tones mean two finishing sequences on site, not one.
- Interior fittings and interfaces. Drawer boxes, pull-out corner systems, integrated lighting, worktop thickness and the appliances you intend to build in are quoted as options. Decide them at enquiry stage or they become variations later.
The five documents that let us quote properly
You do not need finished design drawings to start. This is what we ask for, and roughly how long each item takes you:
| A room sketch or existing layout with overall lengths and heights | Ten minutes on paper is enough for a first estimate |
| Window, door, ceiling and floor levels, plus the position of services | Copied from your architect's plans if they exist |
| Appliance list with model numbers or at least dimensions | Oven, hob, extractor, dishwasher, fridge, wine cooler |
| Reference images for the two tones you want | Screenshots from our product pages work well |
| Delivery address and how far the units must travel | Ground floor or upper level, lift or stairs, site access |
If you already have a design from another supplier, send it. We can price against someone else's drawings, and we will flag where a detail is likely to cause trouble on site — a tall unit boxed into a corner, a run that does not clear an opening door, an appliance recess without ventilation.
How the enquiry moves through our team
Our cooperation steps are the same for a single kitchen as for a villa with six bathrooms: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. In practice that means:
- Enquiry review. We read the layout and come back with the questions that block an accurate price — usually missing levels or an undecided appliance.
- Proposal and quotation. You receive a specification sheet listing every unit, its dimensions, the selected veneer and finish, and the interior fittings included. Anything we could not confirm is written as an assumption rather than buried in the total.
- Detail confirmation. Before production starts, the drawings are signed off with you or your designer. This is the point at which changes are cheap; after it, they are variations.
Because the sizing, finish and layout are all specified per project, there is no standard price list for this collection. That is the reason we ask for the drawings first rather than quoting a metre rate in an email.
Specify the rest of the fit-out while you are at it
A kitchen is rarely the only thing on a purchase order. As a China-based manufacturer and one-stop supplier of furniture and building materials, we produce the finishes that sit around the cabinetry — built-in furniture, wall panelling and doors in matching veneer, engineered oak flooring, lighting, bathroom ceramics and vanities. Ordering a villa's joinery together means one grain-matching reference, one production schedule and one container plan instead of five suppliers arguing about who is responsible for the reveal between the cabinet and the wall panel.
Freight, installation and what to check on arrival
We arrange sea, air or rail freight with the customs paperwork, packaging and container loading, and deliver door to door. Import duty, local Incoterms and the final metre of delivery are confirmed per project rather than assumed, so tell us the delivery city in the first email.
On site, check three things before the fitters open the cartons: that the carcass heights match the signed drawings, that the two tones are labelled by run rather than mixed, and that veneer panels arrived face-to-face with edge protection. Report anything damaged on the day it lands — replacement panels are made to the same specification, and a delay discovered after installation costs far more than one found at unloading.
Questions buyers ask before requesting a quote
Can you match a veneer sample I already have?
Send the physical sample to our Foshan office. Grain species and finish tone are judged on the real thing, not a photograph, since camera white balance shifts veneer colour badly.
Do you supply only complete kitchens?
No. Tall units, pantry walls, laundry cabinetry and matching wardrobes are quoted on their own, and loose furniture from our Furniture Series can be added later without reopening the joinery order.
What if my drawings change after production starts?
Tell us immediately. Units already cut are re-worked or remade and quoted as a variation; units still in the queue are amended at no extra cost. Late changes are manageable when they reach us before cutting.
Ready for a number? Send your layout, appliance list and delivery city through our contact page, and we will return a specification-based quotation for your two-tone veneer kitchen.