A glass modular wardrobe is one of the easier fit-out items to specify on paper and one of the harder ones to get wrong on site. Toughened glass panels, aluminium frames, sliding tracks and made-to-measure carcasses all have to meet up with a finished floor and a true wall at the right moment in the programme. Before you place an order, the questions worth asking are not about whether after-sales support exists — every supplier says it does — but about what that support actually covers, who performs it, and what happens six months after handover when a door will not slide cleanly any more.

1. What exactly is covered by warranty, and for how long

Warranty wording on built-in joinery is usually split by component, and the split matters far more than the headline number. Ask for the coverage period separately for:

  • the carcass and shelving — board-based bodies are affected differently by humidity and load than the doors on them;
  • glass panels and their tempering, edgework and any tint or surface coating;
  • aluminium frames, finishes and anodised or powder-coated surfaces;
  • moving hardware — sliding tracks, rollers, hinges, soft-close dampers and drawer runners, which normally carry the shortest period and are the parts most likely to need attention.

Then ask what voids coverage. Glass replacement is often excluded where breakage is attributed to impact or to an out-of-tolerance opening; hardware failure is often excluded where the fitting was installed by someone other than the supplier's own team. Get those exclusions in writing next to your purchase order, not only in a brochure.

2. Who does the installation, and who answers for it

With a glass modular wardrobe, most site problems trace back to the installation stage rather than to the product: an unlevel floor that stops a sliding door tracking straight, a wall that is out of plumb so the frame shows a visible gap, or a ceiling height that varies along the run and forces a scribe on one bay but not the next.

Ask directly whether installation is carried out by the manufacturer's own crew, a local contractor they appoint, or your builder working from the supplier's drawings. Each arrangement changes who you chase when something goes wrong, and it also changes what "after-sales" means later. If a third party fits the unit, confirm in writing that the warranty survives that arrangement — this is the single most common point on which buyers assume wrongly.

3. How replacement parts are supplied and how long they take to arrive

Rollers, track sections, handles, frame trim and internal fittings are the parts that fail first, and a wardrobe with one broken roller is unusable furniture until it is fixed. Ask:

  • whether hardware is a standard, catalogue item or proprietary to the manufacturer — proprietary parts are cheaper to make but harder to source years later;
  • how long spare parts remain available after a project completes;
  • how replacement glass is handled: who takes the new measurements, who tempers and finishes the panel, and how it is packed for transport;
  • how spares are shipped to your site, and what packaging protects glass panels on a long journey.

For projects ordered from overseas manufacturers, this question is worth more than the warranty period itself. A ten-year warranty is of little comfort if a replacement panel takes two months to make and ship. Ask for realistic lead times by part category and keep them with your order documents.

4. What happens in the snagging window after handover

Ask how defects are recorded and closed out. A reasonable arrangement has an inspection at completion, a written snag list, and a defined second visit to clear it — including adjustment of doors and drawers that bind after the building has moved or settled. Confirm who raises the list, who signs it off, and whether rectification is on site or by replacement part.

Also ask how quickly a reported defect is acknowledged and attended, and through which channel: one named coordinator for the whole project, or a general inbox. A single contact who already holds your drawings and specification is worth considerably more than a shorter promised response time with nobody in particular to call.

5. What documentation you should hold before signing off

DocumentWhy it matters later
Approved shop drawings with dimensions and clearancesEstablishes what was actually ordered, so a replacement panel or an adjustment is measured against an agreed record.
Signed specification of finishes and glass typeTint, thickness, surface treatment and frame colour all have to match if one panel is replaced years later.
Hardware schedule with part referencesLets you order rollers or dampers by reference instead of photographing the wardrobe and hoping.
Care and cleaning guidance for glass and framesThe wrong cleaner on a coated frame or a tinted panel is a frequent cause of avoidable, non-warrantable damage.
Warranty terms with exclusions stated by componentRemoves the argument at the moment you need it.

Ask for these as part of handover, not as a favour afterwards. A supplier who has an after-sales process will already have them prepared.

6. How after-sales fits with the rest of the fit-out

Wardrobes rarely sit alone in a project. If your joinery, flooring and other built-in items come from several suppliers, you end up arbitrating between them whenever a defect sits at an interface — where the wardrobe frame meets the floor, for instance, or where a glass sliding door wardrobe abuts a skirting line. Coordinating one supplier across several trades means one party owns those interfaces, and it is why buyers of whole-apartment and villa fit-outs increasingly ask for the joinery package to be handled alongside the rest of the interior scope. A combination modular wardrobe that runs through a hallway and into a bedroom, for example, touches flooring, wall finishes and lighting, and each of those junctions needs one name against it.

SANTERSON's stated service scope covers design and specification support, custom and OEM manufacturing, logistics with door-to-door delivery, then installation and after-sales support — on-site fitting, inspection and snagging, warranty coverage, spare parts and replacement, and ongoing maintenance. Treat those as commitments to be pinned down project by project: ask which of them apply to your site, who performs them locally, and what the written terms say.

A practical test before ordering: send the supplier your floor plan section and ask them to list, in writing, every site condition they need confirmed before manufacture — floor level tolerance, wall plumb, ceiling height variation, finished floor build-up, and where responsibility for each of those sits. A supplier who answers that question carefully is showing you what their after-sales process looks like.

The buyers who have the fewest problems with glass modular wardrobes are not the ones who found the cheapest unit; they are the ones who settled responsibility, parts availability and snagging before production started. Ask those questions early, keep the answers with your purchase order, and the after-sales conversation stays short.