A single Outdoor Swim Spa WS-PC07A is a 7-metre shell with pumps, jets, controls and lighting inside it. Once the order is signed, everything that follows — container type, port route, crane booking, electrical connection, site preparation — has to be planned before production starts, not after the unit leaves the factory floor. For project buyers ordering one or two units for a villa, resort or wellness facility, this article walks through the delivery sequence we work to, and the decisions you need to lock in at each stage.
What "project order" means for a swim spa
Unlike furniture, a swim spa arrives as one rigid, water-tight vessel. It cannot be broken down into flat packs, and it cannot be re-welded on site if the shell is cracked in transit. That single fact drives almost every planning decision below: how it is packed, which port it enters, how it is lifted off the truck, and where your electrician and concreter need to be standing when it lands.
A typical project order for this model covers the spa shell itself, the pre-installed control system, water pumps, filter pump, jet set, LED lighting and ozone system. Optional items from our catalogue — UV sterilisation, additional water pumps, heat pump, sand filtration, insulation and steps — are usually fitted before crating, because retrofitting them after delivery means draining the unit and opening access panels again.
Step 1: Confirm the specification in writing before production
The catalogue specification for WS-PC07A is the starting point, not the final word. Confirm each line against your order sheet:
| Item | Catalogue value |
|---|---|
| Model | WS-PC07A |
| Catalog dimensions | 7000 × 3000 × 1470 mm |
| Control system | 1 set |
| Water pump | 4 pcs |
| Filter pump | 1 pc |
| Jet total | 62 pcs |
| LED lights | 1 |
| Total power | 9.55 kW |
| Features shown | Water jets, LED lighting, Ozone |
Two points matter for logistics. First, the total connected load — 9.55 kW in the catalogue entry above — decides what your local electrician has to supply, and that varies by configuration. If you add a heat pump, the load changes and so does the circuit. Second, the "-T" variant is a different machine: Outdoor Swim Spa WS-PC07A-T carries a swim training system and a different pump and jet arrangement. Confirm which of the two your project actually needs before the order sheet is frozen, because the electrical provision and the plant-room layout differ.
Step 2: Choose the freight mode against the site, not the calendar
We arrange forwarding by sea, air and rail under our logistics and door-to-door delivery service. For a 7000 × 3000 × 1470 mm shell, the practical choice is almost always sea freight, because the unit's height and width make it awkward in air cargo and costly to fly. Rail works for inland destinations where the final leg has road access that can take an oversize load.
- Port of entry. Pick a port your forwarder can clear with an out-of-gauge or high-cube consignment, and confirm the inland distance from that port to site. A shorter truck leg usually means fewer lifts and less risk to the shell.
- Final road access. Ask your site contact for a photo of the entry, gate width, overhead wires and turning radius. A 7-metre load with a crane escort cannot always reach a residential street.
- Cargo insurance. Cover the shell against transit damage and declare the value at shipment. Insurance is arranged case by case; state your requirement in the order so it appears on the paperwork rather than being added later.
Step 3: Get the paperwork right before the container moves
Customs delays cost more than freight. Our team prepares commercial invoices, packing lists and certificates of origin; you confirm import requirements for your country, including any permits your authority requires for electrical goods. Match these details to the machine being shipped:
- Model name and serial/identification on the crate must match the invoice exactly.
- Declared dimensions and gross weight must match the packing list, so the crane and truck booked at destination are sized correctly.
- Incoterms and who pays duty, port charges and inland haulage should be settled in writing before production, not when the vessel arrives.
If your project is buying the spa alongside other fit-out items — outdoor furniture, bathroom ceramics, wall panels — consolidating them into one shipment reduces handling. Our turnkey project solutions cover combined supply of furniture and building materials for villa and hospitality sites, so a single coordination thread handles the whole consignment.
Step 4: Prepare the site while the unit is at sea
The most common cause of a delivered spa sitting on a lawn for weeks is that the base was never finished. Before arrival, your side should have completed:
- Foundation. A level, load-bearing slab or pedestal support sized for the filled weight of the unit, not just its dry weight. Confirm the bearing requirement with your structural engineer.
- Power. A dedicated circuit run to the spa location by a licensed electrician, with the isolation and protection they specify for a wet environment.
- Drainage and access. Space for the filter pump and control system to be reached for servicing, plus a route for overflow or drainage water.
- Lifting plan. Crane or forklift booking, plus protection for paving, fences and garden surfaces along the path from truck to final position.
Step 5: Unloading, positioning and commissioning
Lift from the designated lifting points, keep the shell level, and never drag it across the base. Position it once — repositioning a filled unit is not practical. After placement, connect power through the electrician's circuit, fill, and run the pumps, jets, lighting and ozone system through a full cycle while the installer and your representative are both present.
Record any damage or missing items on the delivery note at that moment, with photographs. Our installation and after-sales support covers inspection, snag lists, spare parts and replacement; a dated photo record is what makes those claims straightforward.
A practical timeline to work backwards from
Rather than quoting transit days that depend on your port and season, plan in reverse from your handover date:
- Handover minus 1–2 weeks: site foundation, electrical circuit and crane booking complete; spa filled and tested.
- Handover minus transit period: unit must be loaded and sailing. Ask your forwarder for the current schedule for your lane rather than assuming a fixed number.
- Before production starts: specification frozen, options confirmed, Incoterms agreed, insurance declared, paperwork templates reviewed by your customs broker.
What to send us with your enquiry
The faster route to an accurate delivery plan is a short brief containing: the model and variant (WS-PC07A or WS-PC07A-T), the option list, the delivery address with site access notes, the port you normally clear through, and your target installation window. With those five items we can quote production, packing, freight mode and cost on one sheet instead of three rounds of email.
Questions about a specific project — quantity, options, or whether the spa should ship with other fit-out goods from our range — go through our contact page, and we will confirm the configuration and delivery scope for that order.