A colour sample looks perfect on the showroom board. Then the wardrobe arrives, and the panel next to it reads a different shade under the bedroom lighting. Nothing is "wrong" — the checklist simply never asked who confirms the finish, against what reference, and when. That is the difference between a wardrobe purchase and a solid color melamine wardrobes specification that survives production.
Melamine is unforgiving in a useful way. The surface is what you ordered, so every decision has to be written down before the panels are cut. Below is the checklist we work through on our own residential wardrobe projects — the same sequence our team follows when a buyer sends drawings for built-in furniture.
1. Room and access conditions, before any design work
Start with the room, not the wardrobe. Record finished floor-to-ceiling height at several points, because slab and screed levels vary across a single wall. Note skirting, cornice, architraves, light switches, power points, air-conditioning returns and downlights, and measure door and lift openings on site — plus the stairwell or service lift if the apartment has one. A full-height panel that clears the bedroom doorway is useless if it cannot reach the floor.
Write down what sits behind the wall too: pipes, structural columns and insulation affect how deep a carcass can be recessed and where fixings are allowed. Buyers rarely see this detail, but it decides whether the unit reads as built in or sits proud of the wall with a visible shadow gap.
2. Layout driven by how you actually store things
Draw the interior around daily habits rather than symmetry. Long hanging for coats and dresses, double hanging for shirts and short garments, drawers below knee height because that is where hands go naturally, shelves above eye level for seasonal items, and an open section near the door for the outfit you are wearing this week.
Then commit the layout to a drawing with every dimension: shelf depths, hanging rail heights, drawer counts and internal widths. A layout agreed verbally is not a layout. If the plan changes after cutting starts, the rework lands on your order.
3. Door system, chosen from circulation — not taste
Sliding doors need clear floor space in front of them and a headroom allowance for the track; hinged doors need a swing arc that does not fight the bed or the ensuite entry. In narrow walk-in robes, an open or glass-front configuration often reads lighter than a full solid run, and mirror fronts recover space visually. All of these are configurations we build to order, so pick the system the room allows first and let the finish follow.
4. The finish specification — where solid color goes wrong
For a flat colour, "grey" is not a specification. Ask for three things in writing:
- the exact board and surface reference the factory will produce with, including the supplier's own code
- the sheen level — matte, satin or glossy — because two panels in the same colour at different sheens do not match once lit
- edge banding matched to the door face, with the thickness stated, so the joint line does not catch the light
Our Melamine Wardrobes range is specified this way: Matte Finish Melamine Wardrobes for low-glare bedrooms, Glossy Finish Melamine Wardrobes where light needs to be returned into a small room, and Two Tone Melamine Wardrobes when the run has to tie into an existing joinery colour. If you are matching something already in the house, send a physical sample or a photograph taken in daylight next to a known reference — and accept that the factory will still ask you to sign off a panel.
That sign-off matters more than any other step. Approve a full-size door sample, viewed in the actual room at both day and night, before mass production is released. It is the cheapest quality control in the whole process.
5. Hardware schedule with names, not descriptions
List hinges, slides, handles or profile pulls, soft-close specification, and any internal fittings by brand and model where possible. Handleless runs need a stated profile type and a matching filler detail at the ceiling and floor. State load expectations for drawers holding heavy items, and confirm who supplies specialty items such as trouser slides, valet rods or integrated lighting.
6. Tolerances, scribes and site fit
Ask explicitly how out-of-plumb walls are handled: a scribe strip, an adjustable filler, or packing behind the carcass. Ask how the unit meets the ceiling where levels drift, and whether the skirting is cut away or the wardrobe sits in front of it. These details belong on the drawing before production; if nobody decided them, the installer will improvise on the day.
7. Packing, access and installation sequence
Confirm panel sizes against the access route you measured in step 1, and ask how panels are packed and labelled so the on-site team can follow the drawing. Fix the installation window relative to painting, flooring and handover — a wardrobe installed before final painting usually needs touch-up, and one installed after the carpet is laid may not sit correctly.
8. The commercial terms that prevent disputes
A quotation should itemise what is included: boards and finish reference, hardware schedule, delivery to the unit or site, installation labour, and what the buyer is responsible for on site. Ask what happens if site dimensions differ from the drawings supplied — this is where most variation costs appear. Payment milestones tied to drawing approval, sample approval and dispatch protect both sides.
9. After-sales scope in writing
Ask what happens if a panel is damaged on site, how spare parts such as slides and handles are supplied later, and who attends for adjustment after the unit has settled. Our installation and after-sales support covers on-site fitting, inspection and snagging, with spare parts and replacement handled through the same project contact — but confirm the exact scope for your project before order, since it depends on site conditions.
How a supplier handles the whole list at once
The reason buyers hand this checklist to a manufacturer rather than working through it with three separate trades is coordination. As a one-stop furniture and building materials supplier, we take the same wardrobe from drawings through production, packing, freight and installation, which means the person who specified the edge banding is the person who packs the panel. For villa and apartment projects where wardrobes, vanities, doors, flooring and lighting all need to match one palette, turnkey interior project solutions keep those finishes on a single specification sheet instead of nine separate purchase orders.
Before you send an enquiry
Have the room drawings with dimensions, a photograph of the wall in daylight and at night, your chosen colour reference or code, and the door system you want. With those four items, a manufacturer can price accurately instead of guessing — and you get a quotation you can compare line by line against another.
Send us your drawings and finish reference, and we will return a specification sheet for your wardrobe run — board and surface code, sheen level, edge banding, hardware schedule, scribe detail and packing plan — so every item on the checklist is answered before production starts.