Pocket doors look simple on a drawing: a leaf that disappears into a wall. In practice they are one of the interior elements most likely to generate site queries, because the frame, the wall build-up and the door leaf all have to agree before anything is manufactured. If your project is specifying Santerson Glass Pocket Doors, the documentation you collect during the enquiry and approval stage decides whether installation runs smoothly or turns into a variation order. Below is the record we suggest your procurement team keeps, package by package.

1. Room-by-room schedule, not one blanket line item

Start with a schedule that lists every opening separately. A single line reading "glass pocket doors, guest wing" is not enough to price or produce. For each opening record the room, the door tag used on the drawings, the quantity of leaves, and whether the leaf is single or double. Note which side the leaf travels to and where it pockets, because that determines the wall build-up and what else can be routed inside that cavity.

SANTERSON's pocket door pages describe made-to-measure sizing with material and finish options, so dimensions belong in your schedule as project-specific numbers taken from site or from coordinated drawings. Record the structural opening width and height, the finished floor level, and the clear opening you expect once the frame and track are installed. Where a threshold, skirting return or floor transition is involved, state it explicitly rather than leaving it to be resolved on site.

2. Glass type, glazing layout and visible hardware

For a glass pocket door the visual specification carries as much weight as the size. Document the glazing choice for each opening — clear, frosted or smoked — together with any divided-light or full-height layout, frame colour and finish, and the handle, pull or recessed finger pull you expect to see. If the design intent is a light-filled partition between a study and a living area, say so; if privacy matters, note it, because that changes both glazing and the expectation around sound.

Keep this description aligned with how the item is named in your bill of quantities and on the drawings. When the specification sheet, the schedule and the drawing call the same door three different things, queries are inevitable during production coordination.

3. Wall build-up and interface details

A pocket door only works if the pocket is built correctly. Your file should show what the pocket wall is made of, how it is braced, where noggins or blocking are required for fixings, and how services such as electrical conduits, switches and pipework are kept clear of the cavity. Record who builds that wall — your builder, joiner or the door supplier's team — and when it must be ready relative to the door delivery.

Also record the finishes that meet the frame: plasterboard edge, tile set-out, skirting, architrave or a flush detail with no architrave. These interface notes are short, but they are exactly what gets argued about on site if they stay undocumented.

4. Related door types in the same package

Projects rarely order pocket doors alone. If your package also includes Santerson Wood Veneer Pocket Doors for bedrooms or bathrooms, keep their schedule rows separate from the glass items so that finish, glazing and hardware notes do not cross over. The same applies to Santerson Flush Sliding Doors, which travel on a face-fixed track instead of disappearing into a cavity — a different wall interface, a different set of site prerequisites, and often a different lead time. Documenting the door type per opening, rather than assuming one detail works everywhere, keeps the whole joinery package coherent.

5. Samples, approvals and sign-off dates

Record what was approved and by whom: the glazing sample reference, the frame finish sample, the hardware sample, and the date each was signed off. Note who has authority to approve, and whether approval covers appearance only or also dimensions. For a villa or hospitality fit-out where several consultants review the same element, a short approval log prevents a decision made in one meeting from being reopened in the next.

6. Packaging, delivery sequence and site storage

Glass leaves and pocket frames are fragile and bulky, so delivery planning belongs in the procurement file. Document the delivery address, the receiving hours, whether the site can take a container or needs smaller transfers, and how the doors will be stored — upright, dry, and away from trades that could damage them. Note which openings are needed first, so the earliest phases arrive first instead of everything landing at once.

SANTERSON describes door-to-door delivery with freight forwarding by sea, air or rail plus customs paperwork such as commercial invoices, packing lists and certificates of origin. Ask for the packing list per opening tag, and match it against your schedule when the crates arrive; discrepancies found at delivery are cheaper to resolve than those discovered at installation.

7. Installation sequence and handover

Finally, write down the installation sequence: which trades must finish before the leaves and tracks go in, who installs the hardware, and when adjustment and snagging occur. Record the inspection items — smooth travel, correct alignment with the wall face, seals and stops working, glass free of damage — and the date the client or consultant inspects. Keep contact details for the person handling after-sales so that any adjustment request has somewhere to go.

None of this paperwork is difficult. What matters is that it exists before production starts, in one place, with the same door names used on the drawings. Teams that document Santerson Glass Pocket Doors room by room — dimensions, glazing and finish, pocket wall build-up, approvals, delivery sequence and installation order — consistently have fewer site problems than teams that treat a pocket door as a standard item.

If you are coordinating doors alongside other joinery, wall panelling, cabinetry or flooring for the same project, SANTERSON works as a single supplier across furniture and building materials, with custom and OEM service and project coordination from design through production to delivery. Send us your door schedule and drawings, and we will confirm the configuration options, dimensions and finishes for each opening before anything enters production.