A set of smoked glass aluminum cabinets rarely travels alone. It arrives as part of a kitchen fit-out: carcasses, doors with tinted glass infill, internal fittings, and often matching tall units and pantry runs. That is why the delivery plan matters as much as the specification. Frames can be bent, glass can be chipped in transit, and a missing hinge set on site stops installation for days. The steps below follow how we handle made-to-measure cabinetry orders from the drawing stage to handover.
1. Lock the drawings before production starts
Smoked glass aluminum cabinets are built to project dimensions, so the first delivery decision is a measurement decision. Send us the finished-floor levels, wall positions, and the location of services — water, waste, power points, and rangehood ducting — before we cut anything. For apartment and villa kitchens we mark each run on the elevations with a unit code, and every panel, door and glass pane carries that same code on its label.
At this stage confirm three things that later cause the most rework:
- Glass choice for each door — tinted smoked glass, or a smoked glass panel inside an aluminum frame — plus handle style and opening direction.
- Appliance models and their cut-out dimensions, so tall housings and oven niches are made once, not twice.
- Site access: lift size, stair width, turning radius and parking for the delivery vehicle.
2. Decide the shipping terms and the receiving party
Cabinetry normally moves by sea freight in a shared or full container, and our logistics and door-to-door delivery service covers sea, air and rail forwarding together with the paperwork side: commercial invoice, packing list, certificate of origin and the import documents your broker asks for. Before we book the vessel, agree with us on who clears customs and who carries the goods from the port to the apartment block or villa site.
Two practical points that buyers often leave too late:
- Name a single receiving contact on site with a phone number that works locally. Cartons labelled for kitchen A get rejected when nobody on site can confirm which run they belong to.
- Set the delivery window against the trades, not against the ship. Tiling, electrical first fix and benchtop templating should be finished before frames arrive, otherwise the cabinets sit in a corridor and pick up damage.
3. Pack frames and glass so they survive the transfer
Aluminum-framed doors with smoked glass are packed as separated elements wherever the design allows: frame, glass panel and hardware in their own protective layers, then consolidated by unit code. Edges get corner protection, glass is interleaved and cushioned, and heavy base units sit low in the crate. The packing list groups cartons by room and run, so the site team can unpack one zone at a time instead of opening everything.
If your project also needs other joinery from the same range — for example aluminum frame with solid panel doors for the pantry and laundry — consolidate them in the same container. One shipment, one clearance, one receiving day, and matching finishes from a single production run.
4. Order the small parts early, not last
Hinges, runners, handles, glass clips, adjustable feet and spare trims are light, easy to lose, and expensive to send on their own halfway across the world. We list them against each unit code on the packing list and pack a spare allowance with the main shipment. Tell us your site address for any later replacement parts as well, so nothing has to be re-made because a bracket went into a skip.
5. Inspect on arrival, then install zone by zone
When the container is delivered, check the crates before the carrier leaves: count them against the packing list, and photograph any crushed or punctured carton with the label visible. Open the damaged cartons on site, note the unit codes, and send us the photos the same day — a chipped glass panel is far easier to re-make and re-ship while other work is still in progress.
Our installation and after-sales support covers site guidance, inspection of the fitted work, snag lists and replacement parts. For a kitchen, install in this order: base carcasses and levelling, wall units, tall housings, then doors with smoked glass panels last so they are not knocked during the rest of the work.
A short checklist before you place the order
- Signed elevations with unit codes, finished floor levels and appliance models.
- Agreed shipping terms, customs broker and final delivery address.
- Site access confirmed: lift, stairs, corridor widths, unloading area.
- Hardware and spares packed with the main shipment.
- Receiving contact named, inspection day booked, trades sequenced.
Send us your kitchen drawings and site photos, and we will return a quotation with unit-by-unit dimensions, glass and finish schedule, packing plan and freight options for your address. Contact SANTERSON to start the drawings review.