A tall dining cabinet looks simple on a drawing: a floor-to-ceiling box beside the dining table, some doors, some shelves. In production it is one of the least forgiving items in a fit-out. It is made to measure, it often carries glass or heavy solid fronts, and once the panels leave the factory the openings in the room are already fixed. The difference between a smooth job and an expensive rework is almost always the quality of the brief that went into it.

This guide sets out what to send SANTERSON when you want a custom Santerson Tall Dining Cabinet, in the order our workshop needs it. Send this material and the quotation comes back with fewer questions; leave pieces out and each round of clarification adds days.

What Is Configurable On This Piece

The tall dining cabinet sits in our Dining Cabinets & Sideboards collection and is built for residential living projects. Three things are specified per project rather than chosen from a fixed list:

  • Made-to-measure sizing — the unit is cut to your opening, not scaled down from a standard module.
  • Material and finish options — board substrate, surface material and colour are selected per project.
  • Layout tailored to the project — internal divisions, door type and open or closed storage follow how the room is used.

Two practical points before you write anything down. First, no fixed dimensions are published for this item: every figure in your brief must come from your own site survey, and the final dimensioned drawing is confirmed with you before cutting. Second, the collection covers several related formats — decorative dining cabinets, glass-front dining cabinets, wall-mounted sideboards and buffet cabinets. If you only need waist-high storage, say so; a full-height unit costs more to make and to ship than the brief requires.

The Six Blocks Of Information To Send

1. Room, use and quantity

Start with one line: apartment or villa, how many units, and what the cabinet has to hold — glassware, dry store, small appliances, linen or display pieces. Storage intent drives internal layout far more than appearance does, and it decides whether you need deep shelves, drawer banks or a tall larder bay.

2. Survey dimensions with the awkward parts marked

Send width, height and depth for each opening, plus skirting, architrave, floor finish build-up, and any out-of-plumb wall or beam that reduces clear space. Note the ceiling height at the front and the back of the unit if the room is not level — a tall cabinet that does not sit plumb shows every error along its vertical edge.

3. Door, glass and hardware decisions

State the door type (hinged, sliding, or handled versus handleless push fronts), whether any front is glass, and if so which glass. Glass-front units need extra confirmation on glazing type, panel size and load, because the frame and hinges are sized around that weight. If you have hardware you want us to work with — a specific hinge reference or an integrated handle profile — send it.

4. Finish system, not just a colour name

"Matte grey" is not a specification. Say what the surface is: laminate, lacquer, veneer or another board finish, and whether it must match an existing kitchen run or wall panel. Where matching matters, send the make and model of the reference material or a physical sample. Colour matched from a phone photograph is one of the most common causes of a rejected batch.

5. Electrical and built-in appliances

If the unit carries internal lighting, an appliance, or a socket behind the back panel, send positions, ratings and who is supplying what. Back panels are cut in the factory, so an electrical point that changes after production starts means either a field modification or a replacement panel.

6. Delivery terms and site conditions

Give the delivery address, floor level, lift or stair dimensions, and whether the site is occupied. Tall panels need turning space in a corridor and a route that fits their length. State your Incoterms preference and target on-site date; our logistics and door-to-door delivery service covers freight by sea, air and rail plus the customs paperwork, and the routing is chosen around your date rather than ours.

A Copy-Paste Brief Template

Project: name, city, apartment or villa, occupancy status

Item: Santerson Tall Dining Cabinet — quantity ____ units

Opening size: W ____ × H ____ × D ____ mm (site survey, date ____), floor finish ____ mm

Constraints: skirting / beam / unlevel wall / corridor and lift limits

Storage intent: glassware, dry store, appliances, display, other ____

Doors: hinged / sliding / handleless — quantity and hinge reference

Glass: none / type ____ — maximum panel size ____

Finish system: surface material + reference code or sample; match required Y/N

Electrical: internal lighting Y/N, appliance model, socket positions and ratings

Delivery: address, Incoterms, on-site date, receiver

Attachments: marked-up plan, elevation, finish samples by post

How The Order Moves From Brief To Site

The workflow follows the steps set out on our service pages: a project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. For a made-to-measure cabinet the second step is the one to slow down on — you review the dimensioned drawing, the finish reference and the internal layout, and only then does cutting start.

If your drawings are not yet resolved, our interior design services cover space planning, furniture layouts and 3D renderings, so the cabinet can be fixed against the room before it becomes a production order. For bespoke material, texture or branding requirements, the custom and OEM service covers custom design and prototyping alongside OEM manufacturing; confirm current minimum order quantities and available finishes for your project at quotation stage.

On arrival, installation and after-sales support covers on-site fitting plus inspection and snag lists. Ask us to confirm the installation arrangement, warranty terms and spare-parts scope for your address in writing before production begins — these are project-specific and vary by location.

Five Questions That Reveal A Thin Brief

  • Are the dimensions from a survey of the actual opening, or taken off an architectural drawing that ignores floor and wall finishes?
  • Is the finish defined by a material reference we can source, or only by a colour word?
  • Does this cabinet need to match something already installed on site?
  • Has the electrical design been frozen, including points behind the back panel?
  • Do the delivery route and the internal stair or lift actually accept a full-height panel?

If you can answer those five, your brief is workable. Send it with drawings through the contact page and we will return a quotation and a dimensioned drawing for confirmation.

Final dimensions, board materials, glass type, load ratings and finish systems are confirmed on the approved drawing for each project. The blank fields above are placeholders in your brief template, not catalogue values.