A U-shaped walk-in wardrobe is one of the most unforgiving items in a villa or apartment fit-out. Three runs of cabinetry meet at two corners, the client walks inside the space, and every dimension is visible from the entrance. Once the panels are cut, changes are expensive. The checklist below covers what we ask buyers, designers and contractors to sign off before production starts on U Shaped Walk in Wardrobes.

1. The measured drawing, not the architectural plan

Architectural floor plans show nominal wall lines. They do not show plaster build-up, skirting that will be kept, door reveals, or the actual out-of-plumb condition of an existing room. Before we quote a U-shaped layout we need a site-measured drawing: each of the three runs measured at the top, middle and bottom of the wall, floor level checked across the whole footprint, and the ceiling height recorded at both ends.

Please confirm which party takes these measurements. On new builds we work from the contractor's as-built dimensions after wet trades are finished. On renovations we ask for a survey of the completed room, because a 10 mm variance across a long run changes every shelf spacing downstream.

2. Clear walkway and door swing

A U-shaped plan uses three walls, so the walkway is the first thing people notice when they step in. Confirm the clear distance between opposing runs after the carcass depth and any hanging rail projection are added — not just the depth quoted for the cabinet. Then confirm the entry door: hinged doors need clearance to open without hitting the opposite-side rail; sliding or pocket doors change what can be placed on the wall behind them.

If the room is tight, tell us early. We will rework the layout as an L Shaped Walk in Wardrobe or move deep storage to one side and keep shallow hanging on the return, rather than force three full-depth runs into a space that cannot take them.

3. Interior zoning against an actual clothing list

Shelf spacing should come from what will be stored, not from a standard template. Before production we ask for a simple list: long garments, shirts and jackets, folded items, bags, shoes, suitcases, ironing or laundry items, and anything that needs a drawer rather than an open shelf. That list drives hanging heights, drawer stacks, shoe-bay depth and whether the corner returns are better used as open cubbies.

Lighting belongs in this decision too. Confirm whether LED strips sit inside hanging bays, above shelves or along the toe kick, and where the switch or sensor will be reached from. Wiring has to be chased into the wall before the panels arrive, so the lighting layout is fixed at drawing stage.

4. Materials, finish and edge treatment

Our walk-in wardrobes are made to measure with material and finish options chosen per project. For each run, confirm the substrate, the surface finish, the edge banding or lipping colour, and the visible hardware — handles, pulls, hinges, soft-close fittings and any interior accessories. Ask for the sample pack before you approve a finish: a matte lacquer, a veneer and a textured laminate can look identical on screen and behave very differently under warm downlight.

Also confirm how finishes are matched across the rest of the build. Where wardrobes sit alongside custom kitchen cabinets, doors or wall panelling in the same tone, we produce them from one approved finish reference so the tones do not drift between trades.

5. Interfaces with walls, ceiling and floor

Confirm the finish build-up at each interface before production: whether a scribe or filler panel is allowed on the ceiling line, whether the skirting is removed or the carcass is cut around it, and how the unit meets tiled floors, cornices and adjacent joinery. These details decide whether the installation closes neatly on site.

Confirm wall construction as well. Solid masonry, timber stud and steel-frame partitions take different fixings, and heavy upper runs need a substrate that can carry them. If the design includes glass-fronted sections or an aluminium-framed element, we need to know the supporting structure at the same stage.

6. Production documents and approval

Cutting only starts after a set of production drawings comes back for signature: elevations of all three runs with finished dimensions, interior elevation showing every shelf and rail height, plan view with the walkway clear, hardware schedule, finish schedule, and a section through each corner junction. We ask the client or the consultant to sign that package, because it is the only document that ties price, dimensions and finishes together.

If your programme includes a 3D rendering for client presentation, request it during design development rather than after the drawings are issued — changes are cheap at concept stage and costly once panels are nested for cutting.

7. Packaging, delivery sequence and site readiness

Wardrobe components arrive as panelised packs, numbered to run and elevation. Confirm the delivery address, access route, lift or stair dimensions, and whether goods go to a port, a warehouse or directly to the property. For projects abroad we arrange freight by sea, air or rail with customs paperwork and door-to-door delivery, so the receiving side needs a named person and a dry, secure storage area ready before the container lands.

Confirm site readiness too: painting and flooring complete, electrical first fix done, lighting positions energised, and the room lockable. Fitting into a room that is still wet or shared with other trades is the most common cause of damage claims on built-in furniture.

8. Installation scope and handover

State clearly in the order who installs. We provide installation and after-sales support as part of project delivery, including inspection and snagging; some buyers prefer their local contractor to fit from our drawings. Either way, agree the tolerance allowance at the wall and ceiling lines, who makes good any packing gaps, and what is inspected at handover.

Finally confirm the warranty terms and spare-part arrangement in writing for the specified fittings — hinges and runners are the items most likely to need replacement years later, and matching a discontinued hardware item takes time.

Before you place the order

Send us three walls of measured dimensions, your clothing list, the finish reference, the interface details, and the delivery address. From there we return a layout proposal, production drawings and a quotation for the exact specification — no assumed standard size, no generic interior template.

SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, and our built-in furniture range covers wardrobes, cabinetry and joinery coordinated with the flooring, wall panels, ceiling and lighting in the same project. If you are sourcing for a villa or apartment fit-out, send the drawings to us through the contact page and we will quote against your specification.