A metallic high gloss cabinet enquiry looks simple on screen: a photo, a colour name, a room size. In practice, the quotation you get back depends far more on what you hand over than on what the finish is called. Two identical kitchens can produce very different prices once substrate, panel construction, hardware and delivery terms enter the picture.

The checklist below is what we ask project owners, builders and designers to have ready before we quote metallic high gloss cabinets — the same information that keeps a made-to-measure run of cabinetry from stalling halfway through production.

1. Drawings, not just photographs

High gloss fronts are manufactured to size, so the drawing is the order. Before contacting a supplier, gather:

  • Cabinet elevations with overall widths and heights for every run, including the tall units and any appliance housing;
  • Room dimensions taken at three points along each wall — floor levels and wall straightness are rarely uniform on site;
  • The positions of sockets, switches, windows, radiators, downpipes and any services that will cut into a carcass;
  • Ceiling height and the type of ceiling, because a full-height gloss front behaves differently under a suspended ceiling than under a flat plaster one.

If you only have a floor plan, send it anyway. A supplier working from a plan can still produce an indicative layout and tell you precisely which measurements are missing, rather than guessing at them later.

2. The finish name is not the specification

"Metallic high gloss" covers several different constructions, and they do not look identical once light hits them at an angle. Be ready to say which of these you actually want:

What you specifyWhy the supplier needs it
SubstrateDetermines edge stability, fixing method and how the front behaves near ovens and hobs.
Surface layer and edge treatmentGloss wraps or caps the edges differently depending on construction; this is where colour match between doors and drawer fronts is won or lost.
Panel thicknessAffects hinge choice, concealed handle profiles and whether an integrated handle route is even possible.
Colour referenceA RAL code, a brand colour name or a physical sample removes the largest single source of dispute at handover.
Sheen expectationSay whether you want a mirror-like reflection or a softer metallic depth; photographs of other rooms are useful here.

Where the exact finish matters, ask for a sample panel before confirming production. A small swatch reveals how a metallic gloss reads under your own lighting — something no catalogue image can settle.

3. Decide the handle question early

Gloss fronts show fingerprints and hand marks far more readily than a matte surface, which is why handle choice is a functional decision, not only an aesthetic one. Tell the supplier whether you want:

  • A handleless front with a recessed or integrated profile — cleaner visually, but it changes the minimum gap between fronts and the door swing;
  • Surface-mounted handles, which sit proud of the gloss and must be coordinated across doors, drawers and tall units;
  • A mixed approach, for example handleless at eye level and profiles in the drawer bank.

This choice affects panel thickness, corner clearances and the internal fit-out, so settling it before quotation avoids a second round of drawings.

4. Specify what is inside the cabinets

The visible gloss is only half the order. Internal decisions change the price and the production lead time, so have them settled or at least shortlisted:

  • Carcass colour and material — whether it matches the fronts or contrasts with them;
  • Drawer boxes, soft-close runners, tall-unit pull-outs, corner carousels and pantry racking;
  • Appliance schedule: oven, hob, extractor, dishwasher, fridge and microwave dimensions, plus whether any are integrated behind gloss panels;
  • Worktop material and thickness, and how the worktop meets the gloss front at the splashback;
  • Integrated lighting inside wall units and glass-front display sections.

Appliance dimensions in particular need to be confirmed rather than assumed. A single changed oven model can force a revised tall unit, and that revision costs time once cutting has started.

5. Be clear about scope and coordination

Cabinetry rarely sits alone on a project. If your kitchen also needs wardrobes, media units, doors or other built-in joinery in the same finish, say so at the start — ordering the gloss fronts together keeps colour and batch consistent across rooms. Our kitchen cabinets range covers matching finishes across several product families, which is one reason villa and hospitality projects group them in a single package.

Also state who is responsible for what: site measurement, on-site fitting, plumbing and electrical connection, and the sequence of work. A supplier quoting cabinetry alone will price cabinetry alone; coordination with your builder or fitter needs to be named in the enquiry.

6. Delivery terms decide more than freight

For an overseas-sourced run of cabinetry, the commercial terms belong in the first message, not the last one:

  • Destination address, port or site, and whether delivery is kerbside or to a specific floor;
  • Preferred Incoterms and who handles customs clearance and import duty locally;
  • Whether the order ships in one consignment or in stages, and where it can be stored on arrival;
  • Access constraints at the site — lift size, stair width, gate height, parking for a delivery vehicle;
  • Your required on-site date, working backwards from the trades that follow cabinetry installation.

These details determine packing method and container loading, and they are far cheaper to resolve in the enquiry than after the goods have been crated.

7. What a complete first enquiry looks like

A useful way to check your readiness is to compare it with the table below. Anything in the right-hand column will come back as a question, and each round of questions adds days to the schedule.

Have readyComes back as a question
Elevations with dimensions at three points per wallRough sketches without heights or ceiling levels
Named finish, colour reference and sample expectationA photograph of someone else's kitchen
Handle decision and panel thickness"Whatever is standard"
Appliance schedule with model dimensionsAppliances to be chosen later
Internal fit-out listInteriors left to the supplier's default
Delivery address, Incoterms and on-site date"Ship to Australia" with no further detail

8. Where custom manufacturing changes the conversation

Made-to-measure production means the specification is not limited to a catalogue list. Layouts can be adjusted to an awkward wall, a non-standard ceiling height or an appliance that no standard carcass accommodates. If your project needs that — including bespoke finishes and branding on packaging for a development programme — OEM furniture manufacturing is arranged during the design stage, before drawings are released to the factory.

For a whole-house or multi-unit job, coordinating cabinetry with the other fit-out elements in one package also reduces the number of separate deliveries and handovers. That is the practical reason we handle turnkey interior project solutions rather than quoting each product line on its own.

Before you send the enquiry: elevations and spot measurements, a named finish with a colour reference, the handle decision, the appliance schedule, the internal fit-out list, and delivery terms with your required on-site date. With those six items in one message, a metallic high gloss quotation can be assessed against comparable quotes rather than being impossible to compare.

Send what you already have and let the supplier tell you what is missing — that is usually faster than trying to complete everything first, and it puts the measurement gaps on the table while there is still time to resolve them.