A swim spa sits between two purchase categories that behave very differently: a factory-built shell you drop onto a prepared base, and a permanent pool you build on site. The Outdoor Swim Spa WS-115EⅢ-U belongs to the first group, which is exactly why it rewards a careful reading of the specification sheet before you enquire. This guide walks through what the catalogue actually states for this model, where the numbers need confirming with the supplier, and which questions separate a well-matched installation from an expensive compromise.

Start With the Footprint, Not the Finish

The published shell size for this model is 5280 × 2200 × 1250 mm. Treat those figures as the starting point of a site conversation rather than the end of one. A swim spa needs working clearance around it for the cabinet, access panels and the filter pump, plus a level structural base that carries the shell when it is full of water. Decking, retaining edges, steps and any cover storage all sit outside the quoted shell dimensions.

Width is the dimension people misjudge most often. At 2200 mm internal width you are looking at a hydrotherapy and short-lap space, not a swimming lane for a competitive stroke. If your brief calls for long, uninterrupted laps, the range includes longer formats — an extended outdoor swim spa pairs a longer swimming channel with a separate relaxation area, which is a different proposition from a compact all-in-one unit.

What the Specification Sheet States

The catalogue record for this model lists the following. Read it as an equipment inventory you can quote back to a supplier line by line:

  • Model: WS-115EⅢ-U
  • Catalogue dimensions: 5280 × 2200 × 1250 mm
  • Control system: 1 set
  • Water pump: 3 pcs
  • Filter pump: 1 pc
  • Jet total: 24 pcs
  • LED lights: 2 pcs
  • Total power: 9.65 kW
  • Features shown: water jets, LED lighting, ozone

Two details in that list deserve more attention than they usually get. The first is the total power figure of 9.65 kW. That number sets the electrical supply you need to arrange locally — circuit sizing, protection device and where the connection point sits relative to the cabinet. It is a specification to hand to your electrician, not something to assume after delivery.

The second is what does not appear against this model in the catalogue: a swim training system is not listed for WS-115EⅢ-U. Other models in the same range do carry one. If your plan depends on swimming against a current, that gap matters more than cabinet colour or lighting count, and it is the single clearest reason to compare this model against its siblings instead of buying the first page you find.

Configuration Is Where the Real Price Lives

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each of those changes both the purchase price and the running profile. A heat pump and insulation package is what lets the shell hold temperature overnight in a cool season; without it you are paying to heat water that loses it. Sand filtration and UV sit on the maintenance side of the ledger — they reduce how often you handle chemicals and clean cartridges.

Because availability and compatibility vary by model, ask for a written configuration list with quantities for your specific unit rather than accepting a brochure page. The comparison is straightforward: same jet count, same shell, different options fitted. If two quotations differ sharply in price, the option list almost always explains why.

Six Questions Worth Asking Before You Order

  • Which items are included in the quoted price, and which are options? Get it as a list with quantities.
  • What electrical supply does the confirmed configuration require, and who is responsible for the connection on site?
  • What base preparation is specified — load, level tolerance, drainage around the cabinet?
  • How is the unit delivered and set into position, and what access does your site allow?
  • Which parts are consumables, and can they be sourced after the warranty period ends?
  • What inspection happens before shipment, and what documentation arrives with the crate?

These questions do the work that a specification sheet cannot. They put responsibility for base preparation, electrical connection and delivery access onto the table while there is still time to change the plan.

Buying It as Part of a Larger Project

For a villa or resort development, a swim spa rarely arrives alone. The outdoor deck usually needs loungers, shade structures and a hardstanding that matches the paving specification, while the interior fit-out runs on its own schedule. Coordinating those items with one supplier reduces the number of handover points where responsibility gets blurred — which is where most project disputes over outdoor water features actually start.

SANTERSON works as a one-stop furniture and building materials supplier, covering design consultation, production, door-to-door logistics and installation support across villa, hospitality and office projects. The Swimming Pools and Swim Spas category sits alongside the outdoor furniture, cladding, flooring and lighting lines, so a pool deck can be specified as one package rather than assembled from separate vendors. Where a project needs something the standard catalogue does not offer, a customizable shape outdoor spa covers square, round, oval and curved shells for terraces and gardens that do not suit a rectangular unit.

Since 2008 the company has manufactured furniture and building materials in China for project customers worldwide, with offices in China, Vietnam, Singapore and South Africa supporting enquiries. Project references on the site include villa work in Sydney, Melbourne, Perth and North Turramurra in Australia.

Figures quoted above are transcribed from the catalogue entry for this model. Included equipment, electrical requirements and option compatibility should be confirmed against your chosen configuration before ordering.

To check current availability, request the full option list for WS-115EⅢ-U, or discuss a swim spa as part of an outdoor project package, contact SANTERSON and send your site dimensions and target configuration.