A design brief for a wall system usually arrives as a mood board, a floor plan and one sentence: “we want the wall to change when we need it to.” That is where enquiries for Santerson Acoustic Sliding Panels most often stall — not on style, but on missing information. The panels in our Sliding Panel Systems collection are made to measure, with finish, layout and dimensions specified per space, so a quotation is only as good as the brief behind it.
The steps below are how we turn that kind of brief into a priced, buildable proposal. They work whether you are furnishing a single villa room or coordinating wall systems across several apartments, and they follow the same sequence our team uses on villa and hotel fit-out projects.
Start with the job the wall has to do
Before any measurement, write down what the opening must achieve day to day. Sliding panels are usually specified for one of three reasons, and each one changes the hardware conversation later.
- Reconfiguring a room. A study that becomes a guest room, a lounge that closes off at night. Here the question is how often the panels move and who moves them.
- Separating sound and sight lines. Media walls, home offices, open-plan living. This is where acoustic sliding panels are specified rather than a plain partition.
- Hiding built-in functions. A TV, pantry, wardrobe or laundry that stays out of view when not in use — the same logic behind our sliding storage panels and sliding panel TV systems.
A single line such as “close off the media wall twice a week, keep it quiet enough for television at normal volume” tells us more than a page of adjectives. If you are still deciding between an acoustic and a decorative finish, say so in the brief; we will treat it as an open question rather than an assumption.
What we need from your drawings
You do not need finished shop drawings to get a first quotation. What we need is enough geometry to know what can travel, and where it can travel to.
| Item | Why it matters | Acceptable at enquiry stage |
|---|---|---|
| Opening width and height | Sets panel count, single or stacked tracks, and whether panels can stack to one side or must bypass | Scaled plan elevation with overall dimensions |
| Floor, ceiling and adjacent wall finishes | Determines fixing detail, track support and reveal sizes | Finish schedule or a note such as “plasterboard ceiling, timber floor” |
| Clear stack zone | How much wall the panels occupy when open | A dimension, or a marked “no obstruction” zone on the drawing |
| Room use and traffic | Informs hardware grade and panel size | Plain description of the room and how often it is used |
| Existing openings, skirting, services | Avoids clashes discovered on site | Marked-up photos with a tape measure in frame |
If your project has several walls to treat, send them as one set. Panels ordered together are produced together, and matching finishes across rooms is far easier to control when the schedule is reviewed once instead of room by room.
Choose the finish family before you choose a colour
Within the Sliding Panel Systems collection, the same made-to-measure logic applies across several panel types. Naming the family in your enquiry narrows the specification quickly:
- Santerson Acoustic Sliding Panels — for openings where separating sound is the priority.
- Santerson Glass Sliding Panels — where light and sight lines need to stay open between spaces.
- Santerson Textured Sliding Panels and Wooden Sliding Panels — when the closed wall should read as joinery rather than as a door.
- Santerson Closet Sliding Panels and Partition Sliding Systems — for storage fronts and room dividers.
If the panels must match other joinery in the project — kitchen fronts, wardrobe doors, wall panelling — include those finishes in the same enquiry. As a custom furniture and interior products manufacturer, we produce these elements in one run so veneers, lacquers and hardware are drawn from the same batch of decisions instead of being reconciled on site.
Be explicit about what is still open
Configurable wall systems carry real technical variables, and guessing them wastes a quotation round. In the enquiry, list the items you have not settled yet, for example:
- ☐ The acoustic performance required for the selected configuration — we confirm this against your use case rather than assuming a rating.
- ☐ Track, hardware and opening dimensions, including whether the track is recessed or surface-mounted.
- ☐ Glass type and any safety requirement for glazed panels in the relevant location.
- ☐ Whether integrated lighting or a media recess passes through the moving panels.
Naming the open points is not a weakness in the brief — it is what lets us price the known scope and quote the rest as clearly defined options.
How the enquiry moves into production
Once the geometry and finish family are fixed, an enquiry follows the same route as any of our made-to-measure items:
- Consultation and space planning. We review your drawings, confirm dimensions and flag clashes with skirting, ceilings or services. Our interior design services cover layout planning, furniture layouts and 3D renderings when the scheme is not yet fixed.
- Specification and quotation. Panel sizes, material and finish selections, track and hardware detail, and a breakdown of options so you can compare cost against scope.
- Production and quality control. Panels are made to the approved schedule, together with any matching joinery on the same project.
- Logistics. Freight by sea, air or rail with the shipping paperwork handled on our side, delivered to site — see logistics and door-to-door delivery.
- Installation and handover. On-site installation support, inspection of the snags list and spare parts for later maintenance — see installation and after-sales support.
Questions buyers ask us most often
Can I enquire without final dimensions?
Yes. Send a scaled plan or elevation with overall widths and heights, and we will return an indicative range plus the exact fields needed for a firm price. Final made-to-measure dimensions are confirmed before production starts.
Can sliding panels match my existing cabinetry?
Usually, provided you send the finish reference — veneer species, lacquer or laminate code, or a sample. Where no reference exists, we propose finishes from our own schedule and confirm them against a sample before production.
Do you supply panels only, or the whole wall?
Both. Some clients order the panel fronts and tracks alone; others take the full wall build, including framing, storage behind the panels and matching panelling from our wall panels and wall cladding range.
What if the site dimensions differ from the drawings?
Tell us before production. Made-to-measure sizing is confirmed against site-verified openings, so a revised dimension at enquiry or approval stage is a normal part of the process; a revised dimension after production has started is a change order.