A mirrored hinged wardrobe looks simple on a drawing: two or three doors on hinges, a mirror on the outside, carcass inside the wall cavity. On site it is one of the few built-in items where a single millimetre of error shows up twice — once in the door gap and once in the reflection. If you are specifying these for a villa bedroom, a guest suite or an apartment fit-out, the questions below are the ones worth settling before production starts, not after.
1. The opening: which dimensions actually control the doors
Send finished dimensions, not structural ones. A wardrobe alcove measured off a blockwork wall changes once plasterboard, screed, skirting or a floor finish goes in, and hinged doors are unforgiving about that change. What we need from your side is the width, height and depth at three points across the opening — top, middle, bottom — plus the finished floor level and finished ceiling or soffit level, with the wall build-up noted if it is still open.
Depth needs a separate decision. Carcass depth plus door thickness plus handle projection equals the clearance you actually have in front of the wardrobe. Hinged doors swing out, so the bed, the doorway arc and any bedside unit all have to be checked against that swing before the layout is locked. Our Mirrored Hinged Wardrobes are made to measure, so the carcass follows the confirmed opening — but the swing clearance is a room-planning decision that has to come from your layout drawings.
2. Mirror on the door face: glass type, safety backing and size
Confirm which faces carry mirror and which carry the panel finish. A full-height mirror panel reads as one sheet in a bedroom; two doors with mirrored inserts read very differently, and the joint between them falls exactly where a person stands. Tell us whether you want the mirror applied over a solid panel or as part of the door build-up, and which edge treatment you expect — polished, bevelled or framed by the panel edge.
Also settle what sits behind the mirror. Door-mounted glass gets flexed every time someone pulls a door hard; the mounting method and backing have to suit that movement. We will confirm the specification for the exact configuration you select rather than assume it, and we would rather you ask us for it in writing at quotation stage.
3. Hinges: opening angle, projection and hardware schedule
Hinges are where a wardrobe specification usually goes thin. Specify the hinge type, the number per door based on door height and weight, whether soft close is required, and the opening angle — a standard 90° hinge needs wall clearance beside it, while a reduced-angle hinge suits a wardrobe sitting close to a perpendicular wall. A mirrored door is heavier than a plain panel door of the same size, so the hardware schedule should be set for the finished door weight, not the bare panel.
Send us your handle and pull preference at the same time. On a mirrored face, a knob or handle needs to sit on solid material, not on the mirror itself.
4. Interior layout: what the client will actually store
The interior is where the wardrobe earns its keep in a bedroom project. Long hang for dresses and coats, double hang for shirts and folded stacks, drawers below knee height, shelves above the eye line, and a shallow tray section for accessories. A guest-room set is not organised like an owner's suite, so if you are furnishing a villa or apartment with mixed unit types, specify the interiors by room type rather than ordering one layout across the whole project.
Where a run needs a corner, an end return, or a mirror that must not face the bed directly because of client preference, flag it on the drawing. Our Flat Panel Hinged Wardrobes and Paneled Hinged Wardrobes in the same hinged-door family are often used for the secondary bedrooms so the finishes stay consistent while the mirror is kept to the master suite.
5. Finish matching with the rest of the joinery
A wardrobe door rarely stands alone. It sits beside doors, skirting, vanity units and kitchen cabinetry in the same timber tone or lacquer colour. Send the finish reference — sample code, physical sample, or a photograph is not enough for a lacquer match — and tell us which items in the project should be batched together so they are produced from one material run. Veneer and wood-tone finishes vary between batches, and matching across separate production runs is where colour complaints start.
6. Site conditions: levels, moisture and what must be complete before delivery
Built-in wardrobes go in after wet trades, flooring and painting are finished, and after the room's services are fixed in position. Confirm the wall is plumb and the floor level within your tolerance, that any recessed lighting or power to the interior has been routed and tested, and that the room is enclosed and dry before the carcasses arrive. If a mirror panel has to pass through a corridor, stairwell or doorway on its way to the room, tell us the clear opening sizes early — a full-height mirrored door may need to be split, and that decision changes the elevation.
7. Packaging, transit and the inspection you should do at handover
Mirrored doors travel badly if they are packed like plain panels. We pack mirrored elements glazed-side-in with edge protection and corner guards, on their own edge-rated cartons rather than mixed in with loose furniture, and we photograph the packed cartons before loading so both sides have a record. For international shipments this matters more than it does locally.
On handover, check the items that are cheap to fix before the client moves in: door alignment and even gaps across the run, hinge operation on every door with no rub, mirror free of chips and edge defects, no haze or trapped marks behind the glass, drawer runners smooth, and all protective film removed. Record any snags against the room number so they can be closed out quickly.
What to send us before we start production
| Item to confirm | Why it matters before production |
|---|---|
| Finished opening dimensions, three points | Carcass is built to the confirmed opening; late changes mean remade doors |
| Room layout with door swing clearance | Hinged doors need clear swing space; sliding doors are a different specification |
| Mirror position, size and edge treatment per elevation | Fixes the joint line and how the reflection reads in the room |
| Hinge type, count, opening angle, soft close | Set for finished door weight including mirror |
| Interior layout by room type | Owner suites and guest rooms store differently |
| Finish reference and batching with other joinery | Veneer and lacquer match across the project, not per item |
| Access route for full-height mirrored doors | Determines whether an elevation must be split |
| Site completion status before delivery | Built-ins are installed after wet trades, flooring and services |
If you want these items handled as one package rather than as separate trades, our Custom & OEM Service covers bespoke wardrobe manufacturing to your drawings, and our Logistics & Door-to-Door Delivery service handles freight, export paperwork and delivery to site for villa, hotel and apartment projects.
Send the room drawings, the confirmed opening dimensions and your finish references, and we will come back with a wardrobe specification you can check item by item — elevations, hardware schedule, interior layout and packing plan — before anything goes into production.