Natural stone and marble are the hardest line items in a project order to get right across borders. Slabs and cut tops are heavy, brittle, dimension-specific and usually made to measure, so a delivery plan that works for cabinets or lighting will not work here. This guide walks through how we prepare an international project order of Santerson Stone & Marble Surfaces — from the measurement package and fabrication sequence to crating, freight mode, customs paperwork and site readiness.
Why stone surfaces need their own delivery plan
Our Santerson Stone & Marble Surfaces collection sits in the Countertops & Basins range for residential bathroom projects. Each piece is specified to project dimensions, with the material and finish selected per space rather than taken from a fixed catalogue size. That flexibility is exactly what makes the logistics sensitive: every top is cut for one opening, on one vanity carcass, in one room. If a measurement is wrong or a panel arrives chipped, there is no shelf replacement to reach for — the item has to be re-fabricated and re-shipped.
Weight compounds the problem. Stone tops ship at a far higher density per cubic metre than joinery or furniture, so container space fills by weight long before it fills by volume, and every handling step from the factory floor to the bathroom opening carries breakage risk. Planning for that reality — not hoping for the best — is what separates a smooth handover from a claim.
Step 1: Lock the measurement package before production starts
Almost every delivery problem we see on stone orders traces back to the pre-production stage, not the freight stage. Before we cut anything, we want a coordinated set of information from your site team:
- Final vanity and carcass dimensions, including the exact thickness of the supporting frame and any rebate or overhang you expect.
- Sink and basin type — undermount, integrated or vessel — with the cut-out drawing, tapware hole positions and clearance for the mixer body.
- Wall conditions: out-of-plaster lines, tile set-out, skirting returns and whether the top meets a tiled wall, a window reveal or another surface.
- Access route on site — lift dimensions, stair widths, corridor turns and door heights for the largest single piece in the order.
- The room-by-room schedule that ties each top to a named location, so nothing is mixed up at handover.
Where a site is still open, we recommend a second verification after plaster and tile are complete. Tolerance shifts by only a few millimetres once finishes go on, and stone does not forgive that gap the way timber can.
Step 2: Confirm material, finish and edge details on drawings
Photographs are not enough for stone. We issue shop drawings for each top showing plan dimensions, thickness, edge profile, cut-out positions and the selected surface finish, and we ask your design or site lead to sign them back before fabrication. This single step protects both sides: you can see how the piece will sit against your tiles and joinery, and we have a written basis for what we produced.
It is also the right moment to decide seam locations on longer runs, splashback returns, and whether any top should be split into two pieces so it fits the lift or stairwell you told us about. Splitting a heavy top deliberately is far better than trying to manoeuvre one piece that does not turn a corner.
Step 3: Sequence production with the rest of your order
Stone tops usually land at the end of a fit-out, but they must be fabricated early enough to sit in the same shipment as the vanities, basins and taps they pair with. We coordinate the stone line against the other items in your furniture and building materials project procurement order so that wet-area joinery, ceramics and tops arrive together rather than in three separate consignments. Split arrivals mean idle trades, twice the handling on site and more exposure to damage.
If your schedule has an unavoidable split — say the vanities ship first to start installation while the stone follows — we plan it deliberately: which pieces go in which container, what goes into the second shipment, and how the gap is covered on site.
Step 4: Crating and loading for long-haul handling
Stone travels in timber crates built for it, not in cartons. Each top is cushioned and supported on a rigid frame, crated upright or flat according to its size and thickness, marked with its room reference, and packed so the weight sits where the crate can carry it. Inside the container the crates are blocked, braced and lashed against shifting, because the real damage in ocean freight happens during handling at both ends of the voyage, not on open water.
Our furniture logistics and door-to-door delivery service covers this loading work along with freight forwarding by sea, air or rail. For stone we default to sea freight on full container loads, since air freight for dense material is rarely economical; air becomes sensible only for a small replacement piece late in a job.
Step 5: Get the customs and import paperwork right
Documentation errors stall shipments far more often than transport problems do. We prepare the commercial invoice, packing list and certificate of origin for your order, with descriptions and weights that match what is actually crated — critical for stone, where a declared weight that does not match the surveyed weight can hold up clearance.
Before booking the vessel, confirm these points with your side of the transaction rather than assuming them:
- The Incoterm you are buying on, and who is responsible for each leg from our factory door to your site.
- Who acts as importer of record in the destination country, and what duties and taxes apply to stone surfaces and joinery under their tariff classifications.
- Whether any import permit or inspection applies to timber crating and packaging at that port, which is a common source of delay.
- Marine cargo insurance cover for breakage on the stone line specifically — read the terms on damage claims before the container moves.
Transit times and clearance windows vary by port and season, so we treat them as planning ranges to be confirmed per shipment rather than fixed promises, and build float into your programme around the stone delivery in particular.
Step 6: Prepare the site for arrival and installation
A stone delivery succeeds or fails on site conditions. Before the container is booked for final leg, we ask you to confirm that the vanities or supports are installed and level, that wet-area finishes are complete, that the access route is clear, and that someone authorised to receive and inspect the crates will be present at delivery.
Inspect each crate against the packing list on the day it arrives and record any damage with photographs before signing. Our installation and after-sales support covers on-site fitting, inspection and snag resolution; if a piece is damaged in transit, an early written report with photos and the room reference is what allows us to arrange a replacement quickly instead of arguing about cause weeks later.
A pre-shipment checklist for stone orders
| Checkpoint | Confirmed by |
|---|---|
| Site measurements re-verified after plaster and tile | Your site team |
| Shop drawings signed off — size, edge, cut-outs, finish | Design / project lead |
| Room-by-room schedule matched to crate markings | Both sides |
| Stone sequenced with vanities, basins and tapware in one consignment | Our project coordinator |
| Incoterm, importer of record and duties confirmed | Your procurement / broker |
| Marine insurance terms on breakage reviewed | Both sides |
| Site access, supports and receiving contact ready | Your site team |
Working with a single supplier across the whole wet area
Coordinating stone, vanities, ceramics and tapware through one turnkey interior project solution removes most of the handover friction. One party holds the measurement package, one set of shop drawings governs the whole wet area, and one shipment plan covers every item in it — which is why bathroom fit-outs are where careful delivery planning pays back most.
Send us your room schedule, target destination port and programme dates, and we will come back with a fabrication and delivery plan for the stone line in your order, including crating method, recommended freight mode and the paperwork you will need at clearance.
Talk to our project team about your order — SANTERSON, China. Phone / WhatsApp: +86-13928214007 (PHILLIP), email: santerson@qq.com, or use our contact page.