A recessed panel wardrobe is specified, not ordered off a shelf. The panel profile that gives this Classic Paneled style its shadow-line detail can be reproduced faithfully only when the buyer supplies accurate dimensions and clear project inputs. For villa renovations, apartment fit-outs and hotel bedroom packages, the quality of that information decides whether production starts on schedule or stalls in an approval loop.

The list below follows the order we normally work through on residential wardrobe projects. It is a practical checklist for architects, contractors, interior designers and procurement teams who need built-in furniture drawings to come back production-ready.

1. Room dimensions taken the way the joinery will be built

Send the length, height and depth of the wall run, measured at several points rather than one. Older villas and renovated apartments rarely have square walls or a level floor, and a single measurement hides that. Note out-of-plumb and out-of-level readings where you find them, plus the position of skirting boards, architraves, cornices, power points, switches, light fittings, air-conditioning grilles and door openings that will meet the carcass.

Tell us how far the wardrobe should return into the room, whether it runs to the ceiling or stops below a cornice, and whether the surrounding floor finish is already laid or still to come. That last point changes the base detail and the finished floor level we design to.

2. Door type and the clearance it needs

The door choice drives both the carcass depth and the front elevation. A hinged wardrobe needs swing clearance in front of it; a sliding option such as our matte sliding door wardrobes trades that swing space for track depth. Send the clear distance between the opening face and the opposite wall or furniture, and confirm whether an adjacent bed, nightstand or bathroom door will obstruct a leaf.

For recessed panel fronts specifically, note the number of doors you expect on the run and where you want the vertical joints to fall. Panel proportions look correct when they relate to door width and overall height, so we need those numbers before proposing a profile.

3. Internal layout based on what is actually stored

Count hanging items by type: long garments, shirts and jackets, folded shelves, drawers, suitcases, and anything that needs a full-height or low rail. Tell us whether the wardrobe serves one person or two, since that decides how many hanging zones to split the run into. Drawers, pull-out trays, shelving above the doors, an ironing or hamper bay and integrated lighting all belong in this conversation before drawings are issued, not after.

Where a bedroom needs storage beyond hanging space, we can mix closed carcasses with open display niches in the same run. A walk-in layout adds island or bench planning, which requires its own floor area allowance.

4. Material, finish and panel detail references

State the board material and surface you want, the colour or grain reference, and the sheen. A recessed route in a door can be shallow and crisp for a contemporary interior or deeper and softer for a classic one, so send a reference image or a sample number rather than an adjective. Where the project already has custom furniture elsewhere — vanities, kitchen cabinetry, media walls — tell us which finishes must match, and we align the wardrobe fronts to those references.

Handle or handleless is a decision worth making early: it affects edge detail, door overlap and hardware. Send the ironmongery brand and model if the project has specified one.

5. Site conditions that affect delivery and installation

Include access details for the site: lift dimensions, stair widths, corridor turns, gate heights and the distance from the kerb to the room. A single-piece panel may be manufacturable but impossible to carry in. Also state whether on-site installation is included in your scope or handled by your own trades, and who supplies services connections for any internal lighting.

For multi-unit projects, list the unit types and quantities so identical layouts can be repeated across rooms instead of re-drawn each time.

6. Programme and approval route

Give us the required site delivery date, the date your drawings must be approved internally, and who signs them off. Our cooperation steps run from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up, so a realistic approval date in the middle of that sequence keeps the whole programme honest.

Where wardrobes are one line item in a wider fit-out, sending the full package together lets us coordinate finishes across categories. That is how our turnkey villa furnishing work is organised — joinery, furniture and building materials specified against the same drawings.

What you receive back

With these inputs we return production drawings showing elevations, panel profiles, internal zoning, door build-up and material callouts for your confirmation. Dimensions and selected specifications are confirmed for each project before manufacture begins, which is what makes made-to-measure sizing reliable on site.

Send your dimensions and layout notes to our team, and we will come back with a specification you can approve.