A U shaped corner wardrobe is one of the most space-efficient ways to fit storage into a bedroom, dressing room or villa suite — and one of the easiest items to damage in transit. Three runs of cabinetry meet at two inside corners, so the shipment includes long side panels, deep return sections, corner bridging units and heavy doors. Because these units are made to measure, there is no spare on the shelf if a panel is crushed: a replacement has to be manufactured again. Before production is released, buyers should agree with the supplier on how the components will be protected, packed and documented. The questions below decide whether the unit arrives ready for installation or arrives as a claim.

1. Confirm how the wardrobe is broken down into modules

Ask for the packing list and the assembly drawing together, not separately. A made-to-measure U layout should be split into factory-finished modules wherever the opening dimensions allow, with only the final corner closure and door alignment done on site. Confirm which sections ship as one box and which ship loose, and check that every panel carries a position mark matching the drawing.

Practical detail to lock down in writing: overall module sizes, the widest and longest single package, the total number of packages, and the weight of the heaviest package — so you can verify that your site access, lift and stairwell can take them.

2. Confirm the panel protection system

Finished wardrobe panels fail in two places: the edges of the carcass boards and the corners of the door fronts. Ask the factory to state what sits between panels, what protects the four corners of each box, and whether the door faces are protected on both sides. For lacquered, acrylic or glass front corner wardrobe doors, the glazing and mirror surfaces need their own interleaving and edge blocks — a shared outer carton is not enough for glass.

  • Dense foam or corrugated board between every finished face, with no board-to-board contact
  • Rigid corner protectors on all eight corners of each package, plus edge protection along long panels
  • Glass and mirrored doors packed upright in their own crated section, never laid flat under carcass parts
  • Hardware, hinges, slides and handles boxed separately and labelled against the module they belong to

3. Confirm carton grade, strapping and palletising

Ask which carton grade is used and whether the boxes are strapped and corner-boarded for export handling. Long side panels should sit on a pallet or skid base so they are not dragged or bent at the ends. If your order travels with other goods, confirm that wardrobe packages will not be loaded underneath loose or heavy items — this is a common cause of crushed returns in mixed project consignments.

4. Confirm the marking and identification scheme

On site, installers work from the box labels. Every package should show the room or unit reference, the module number, the package number in the sequence (for example 3 of 7), and a clear "this face up" and "keep dry" mark. Photographs of the packed modules before loading are worth requesting: they give you a baseline for inspection and settle disputes quickly if damage appears on arrival.

5. Confirm what happens with a multi-room or project order

When several bedrooms, a U shaped walk in wardrobe and other built-in furniture items ship on one consignment, ask that packages are grouped by room rather than by component type. A single bedroom's set arriving together lets the installer finish one room before opening the next, which reduces the chance of panels being misplaced and keeps unfinished rooms weather-tight on site.

6. Confirm the receiving and inspection routine

Agree the inspection steps with the supplier in advance: check the package count against the packing list, photograph any damaged cartons before signing, open the outer packaging of visibly damaged boxes on site, and report within the agreed window with photos and the package label number. Ask the factory how replacement panels are produced and shipped, since a single damaged return section can otherwise hold up the whole installation.

If you order a second unit later — for example matching L shaped corner wardrobes for another room — ask the supplier to keep the same packing standard and labelling format, so your site team handles both deliveries the same way.

Working with a made-to-measure supplier

SANTERSON manufactures corner wardrobes and other built-in furniture to project-specific dimensions, layouts and finishes, and arranges door-to-door delivery for villa, hospitality and residential projects. Send us your room dimensions and finish selection, and we will confirm the module breakdown, packing specification and package list with your order documentation before production begins.