An outdoor swim spa is not a product you can order from a photo. The model code tells you the shell size, but it does not tell you how the unit will be powered, insulated, delivered and commissioned on your site. Before you place an order for Outdoor Swim Spa WS-PC06ST-L, here are the questions worth putting to your supplier — and what a correct answer should cover.
1. Does the footprint work on my site?
The catalogue lists this model at 6390 × 2400 × 1470 mm. Treat those numbers as the starting point for a site check, not the whole answer. Ask your supplier for the assembled dimensions including steps and any cover mechanism, then walk the route from the delivery vehicle to the final position: gate width, turning radius, overhead branches or power lines, and the clearance you want to leave for servicing the equipment compartment. A unit that fits the terrace but cannot reach it is the most common avoidable problem.
2. What exactly is included in this configuration?
The specifications shown for WS-PC06ST-L list one control system, one swim training system, one filter pump, six jets and four LED lights, with water jets, LED lighting, ozone and a swim training system named as the features of this configuration. Ask for that same list written out against your order, item by item, and ask what is not in it. The catalogue also shows options such as water pumps, heat pumps, UV sterilisation, sand filtration, insulation and steps — availability and compatibility vary by model, so confirm each option for the configuration you are buying rather than assuming it carries over from another model.
3. What power and electrical work does my site need?
Total power is shown as 6.55 kW for this model. That figure drives the electrical decision: supply capacity, circuit size, protection device and where the isolator sits. Send your supplier the local supply details — voltage, phase, available breaker rating — and ask them to confirm what the installed configuration will actually draw once a heat pump or extra pump option is added. Ask who supplies the cable run from the house to the spa pad and who signs off the connection locally. That boundary should be agreed in writing before production starts.
4. How is the shell heated and insulated for my climate?
Insulation and heat pump are listed as options, which means running cost depends on what you specify, not on the model name alone. Ask how the shell and base are insulated, what the heat pump capacity is for your ambient temperatures, and whether the insulation package changes the external dimensions or the equipment layout. If the spa will sit outdoors through a cold season, ask how the system protects itself at low temperatures and what the winter routine looks like.
5. How is water treated, and what does upkeep involve?
Ozone is shown as a feature of this model, with UV sterilisation and sand filtration available as options. Ask how the ozone system is dosed and serviced, how often the filter media is replaced, and which parts are consumables versus warranty items. A supplier who can name the service intervals and spare-part codes is a supplier who has shipped these units before.
6. How does it arrive, and who handles the import?
SANTERSON describes door-to-door delivery with freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, and shipment tracking — see Logistics & Door-to-Door Delivery. Ask which Incoterm applies to your order, who prepares the commercial invoice and packing list, what the delivery address covers (kerbside or pad-side), and whether cargo insurance is included or optional. Get the packing dimensions as well as the product dimensions, because they determine the container type and the crane or forklift you need on arrival.
7. Who installs and commissions it?
The company's service pages list on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance — see Installation & After-sales Support. For a swim spa, ask specifically who does the base preparation, who connects water and power, who commissions the swim training system and jets, and what handover documentation you receive. Confirm which tasks your local trades are responsible for before the unit ships, so nothing sits in storage waiting for a contractor.
8. What does the warranty actually cover?
Ask for the warranty terms in writing and read them against your intended use: shell, jets, pumps, control system, LED fittings and ozone generator each age differently. Ask what voids coverage — water chemistry, run-dry operation, unauthorised electrical work — and how a claim is raised and parts shipped to your country.
9. Can the unit be customised for my project?
Swim spas are increasingly specified as part of a wider package. If you are furnishing a villa or resort at the same time, ask whether the spa can be coordinated with other products in the swimming pool range, and with the surrounding outdoor furniture, paving and lighting. SANTERSON's custom and OEM service covers bespoke finishes and configurations across its furniture and building-material lines, so a single supplier can align the spa surround with the rest of the project instead of leaving you to match three different vendors.
10. What should be in the written quotation?
Before you sign, the quotation should state the model and configuration line by line, the shell and assembled dimensions, the electrical specification, the option list with what is fitted and what is supplied loose, the packing list, the delivery terms and address, the installation scope, and the warranty document. If any of those are missing, the order is not ready — a swim spa ordered on an incomplete quotation is an expensive revision.
If you want the full configuration sheet, packing dimensions and electrical requirements for WS-PC06ST-L before you commit, send SANTERSON your site details and they will confirm what is included in the specification you are buying.