A model name on a purchase order is not a specification. For an outdoor swim spa that will sit on a villa terrace or a resort deck for years, the paperwork decides whether the delivered unit matches the design intent. The Outdoor Swim Spa WS-130BⅢ sits in our Swimming Pools and Swim Spas range, where units are configurable rather than fixed, and it is a good example of the records procurement teams should build up before an order is placed.

Start with the catalogue sheet, then date it

The published product page lists a shell of 9950 × 3000 × 1430 mm, one control system, one swim training system, one water pump, one filter pump, twenty jets, seven LED lights and a total power figure of 10.85 kW. Those numbers are the starting point of a procurement file, not the end of it.

Two practical habits matter more than the figures themselves. First, keep a dated copy of the specification you were quoted, because catalogues are revised and a later sheet may show different equipment counts for the same model code. Second, record which version applies to your order, so a comparison between quotation and delivery can be made line by line rather than from memory.

Where a catalogue figure and a drawing or data sheet disagree, do not average them. Log both, flag the difference in writing, and ask the supplier to confirm which one governs the unit being produced.

Document the configuration, not just the model code

The 130 family is sold in more than one build. The catalogue entry for WS-130BⅢ shows a swim training system and one water pump; the closely related WS-130BⅢ-U entry lists four water pumps, twenty-three jets and five LED lights, with no swim training system recorded for that variant. Total power is also listed differently between the two. A buyer who writes only "WS-130B" on a requisition leaves the decisive differences open.

For each unit in a project, record:

  • the exact model code as it appears on the product page, including any suffix such as -U;
  • which features are included in that build — water jets, LED lighting, ozone and swim training are shown separately for these models;
  • the counts of pumps, jets and lights you expect to receive, taken from the confirmed sheet;
  • optional items requested on top of the base build. Catalogue-listed options across this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps, and availability varies by model.

Electrical and siting data belong in the same file

A swim spa is a piece of plant, not just a shell. The power figure on a catalogue page tells you the scale of the load, but the site decision needs more: supply voltage and phase, circuit protection, dedicated earthing, the routing of power and control cabling, and who — supplier or local contractor — is responsible for each part. Product pages for this range carry a standing instruction to confirm included equipment and electrical requirements for the selected configuration, so treat that confirmation as a deliverable in your document set.

On the siting side, capture the dimensions of the prepared base or deck, drainage arrangements, access routes for delivery and lifting, and any structural sign-off your project requires. A unit of 9950 mm length arrives on a truck; the path from truck to terrace is a procurement question, not a surprise for the installation crew.

Record what was confirmed by whom, and when

Project disputes are usually resolved by email chains that somebody kept. Build the habit deliberately: keep written confirmations of the configuration, the options included in price, the scope of delivery and the scope of installation support, each with a date and a named contact. Our own project workflow runs through consultation, design and planning, production, logistics, installation and after-sales, and each handover point is a natural place to attach one more document to the file rather than rely on a phone call.

For spare parts and later maintenance, the same file pays for itself again. Jet types, pump models, control system references and lighting fittings are all things a facilities team will ask for two or three years after handover.

Compare variants on documented differences

When several units are specified across a villa or resort portfolio, put the variants side by side using the same fields. A short comparison table drawn from catalogue entries is often enough to settle a design review:

FieldWS-130BⅢ (catalogue)WS-130BⅢ-U (catalogue)
Shell size9950 × 3000 × 1430 mm9950 × 3000 × 1430 mm
Water pump1 pc4 pcs
Jet total20 pcs23 pcs
LED lights75
Swim training system1 setNot listed for this variant
Total power10.85 kW11.85 kW

Values above are transcribed from the catalogue entries for each model at the time of writing. Confirm current figures and included equipment for your configuration before ordering.

Coordinate the swim spa with the rest of the outdoor package

Swim spas rarely stand alone. Poolside loungers, shaded pergolas and dining sets are usually specified in the same phase, and one supplier handling the whole outdoor furniture scope simplifies container planning, delivery windows and snag lists. Where a project also needs a bespoke footprint, our range includes configurable outdoor spas built to square, round, oval or curved shapes, which is an option worth raising at concept stage rather than after the deck has been built.

If your portfolio spans more than one property, keep model codes, option lists and documentation habits consistent across sites — consistency is what makes a second or third installation cheaper to manage than the first.

Before issuing a purchase order for a WS-130BⅢ or another configuration, send us your layout, the equipment list you are working from and your site's electrical details. We will confirm the build, the options available for that model and the delivery scope for your location. Contact PHILLIP on +86-13928214007 or email santerson@qq.com.