A mood board, a couple of reference photos and the words "feature wall" rarely survive first contact with a quotation. The wall finish that reads beautifully on a design board can turn into a different product, a different fixing detail and a different price once somebody has to manufacture it, ship it and stand it up in an occupied home. If you are writing a design brief for a decorative wall panel for interior home decoration, whether for your own villa or for a client's renovation, the enquiry you send is what decides how close the finished wall comes to the drawing.
Below is the practical sequence we use when a design idea becomes a manufactured panel: what belongs in the brief, which decisions you should make before asking for a price, and what a supplier needs from you so the first quotation is the one you can actually sign off.
Start With the Room, Not the Panel
Panel selection is downstream of room conditions. Two identical feature walls in different rooms can need completely different products, so the brief should describe the space before it describes the look.
- Which wall, and how big. Overall length and height, plus the position of skirting, cornices, switch plates, air grilles, curtains and any built-in furniture that interrupts the run.
- What is behind it. Existing plasterboard, masonry, tile or an old wallpapered surface changes both the fixing method and how much preparatory work your installer does on site.
- How the wall will be used. A hallway or a children's room gets brushed, bumped and cleaned far more than a formal lounge. A wall behind a dining table sees splashes; a bedroom background wall mostly does not.
- How much light falls on it. Strong side light from a window reveals every joint, every shallow dent and every change in grain direction. Deep relief reads well there; a flat panel with a subtle sheen may look flat and patchy.
Rooms that carry moisture need particular attention. Kitchens, bathrooms, laundries and enclosed pool areas are the places where a decorative surface is tested daily by steam and splashes rather than by decoration alone. Our wall panels are described as moisture resistant and suitable for humid indoor environments, but you should still tell us which room the panel is going into, so that the specification, the edge details and the cleaning routine match what the room will actually do to it.
Write the Brief So a Manufacturer Can Price It
A usable brief answers six questions. Once they are answered, an experienced supplier can quote without three rounds of email.
| Question in the brief | What to write down |
|---|---|
| Where is it going? | Room name, wall dimensions, exposure to light, moisture and contact; whether the property is a private home, an apartment or a hospitality space. |
| What look are you after? | The effect rather than a brand name: timber grain, stone veining, fabric-like texture, ribbed or fluted relief, moulded classical panelling, or a three-dimensional sculptural surface. |
| How much wall? | Total square metres, the number of separate walls, and whether off-cuts may be used in concealed areas such as behind wardrobes or doors. |
| What has to be resolved at the edges? | Inside and outside corners, junctions with ceiling and floor, transitions into paint or glass, and any reveal for concealed lighting. |
| Who installs it? | Your own builder or fitter, or a team supplied with the panels. This changes what you receive and what you need on site. |
| When do you need it? | The date the wall must be finished, then work backwards to allow for sample approval, production and delivery. |
Match The Panel Type To The Job
The same design intent can usually be met by more than one panel family. Being explicit about which family you are asking about keeps the quotation comparable across options, instead of receiving three prices for three different products.
Flat and textured panels for a calm background
Where the goal is a quiet, durable surface (a headboard wall, a media wall, a corridor, a dining backdrop), the range sold as modern decorative wall panel for interior decoration covers surfaces that imitate stone, timber and fabric effects. These panels are lightweight, stable and cut on site, which matters when a run has to be trimmed around architraves and services. Because they do not need a complicated construction process, most builders can fix them without specialist tooling.
Moulded and paneled surfaces for classical schemes
Hammer-panel, arched and moulded designs behave like joinery rather than like sheet material. They suit period homes and formal rooms where the wall is meant to read as built-in cabinetry. Specify the profile depth and whether the panel will be painted on site or supplied finished, because that single decision changes both cost and programme.
Three-dimensional panels when the wall is the feature
If the wall itself is the decoration, a luxury decorative 3D wall panel gives depth that lighting can pick up across the room. These are used on TV background walls, hotel lobby feature walls and restaurant surfaces, and they are customised in size, colour and pattern. Two practical notes before you commit: relief collects dust along its ledges, so ask how the surface is meant to be cleaned; and a three-dimensional field always needs a decided termination at the perimeter, otherwise the edge will be resolved on site by whoever arrives with a saw.
Panelling systems that carry other elements
Some walls are not decoration alone. Where the panel line has to absorb doors, storage, niches or an integrated media unit, treat it as a built system rather than a surface finish. Our wall panel systems are made to measure with material and layout options chosen per project, which is the route to take when the wall must do more than look good.
Decide Customisation Before You Ask For A Price
Custom size, colour and surface pattern are part of how these panels are supplied, but custom work has to be specified while it is still cheap to change. Under our custom and OEM service, bespoke finishes, textures and dimensions are produced from a confirmed specification, so the approved sample, not the email chain, should be the point at which you commit.
- Order physical samples of the two or three finalists, and look at them in the actual room at both day and night. A surface that looks warm under a shop light can read grey once it is fixed beside your flooring.
- Check the sample against the floor, the joinery and the window frame you cannot change, rather than against another sample.
- Confirm the sheet or module size before the layout drawing is finalised. Panel widths drive joint positions, and joints are what make a feature wall look designed rather than accidental.
- Ask for a setting-out drawing showing every joint, corner and cut edge, reviewed against your sketch.
- Agree the finish in writing: supplied pre-finished, or finished on site after fixing.
What A Complete Enquiry Looks Like
Before you send the enquiry, check that these items are attached. This is the list that lets a manufacturer answer with a real quotation instead of more questions.
- Wall dimensions and quantity in square metres, per wall
- Photographs of each wall plus a dimensioned sketch
- Room type and the conditions the surface will face: moisture, contact, cleaning and sunlight
- Preferred panel family and, if known, the reference number or product page
- Colour, texture and size requirements, including whether custom dimensions are needed
- Edge, corner and lighting-reveal details, or a note asking for our recommendation
- Who is installing, and the delivery address with access notes for the panels
- Required on-site completion date
For whole-home work, wall finishes rarely sit alone. Panel lines meet flooring, doors, wardrobes and kitchen cabinetry, and those junctions are where projects lose money through variations. Coordinating them with the rest of the fit-out is the subject of our one-stop solution service, which runs from design consultation and material selection through production, project management and handover.
Common Reasons A Wall Panel Enquiry Stalls
Most delays are not commercial; they are caused by missing information. The recurring ones:
- A reference image with no dimensions. The supplier can identify a look but cannot price a wall that has never been measured.
- Quantities quoted per sheet instead of per wall. Off-cuts, wastage and pattern matching are decided by the layout, not by the total area.
- Colour named from a screen. Monitor colours vary; sample approval protects both sides.
- No fixing detail agreed. Substrate, adhesive or batten method, and who prepares the wall, all belong in the order.
- Edge conditions left open. Corners and perimeter trims are the most commonly forgotten line on a wall panel order.
How The Brief Turns Into A Production Order
Once the enquiry is answered and the specification is agreed, the sequence that follows is the one we run on villa and hospitality projects: sample approval, then confirmed drawings and quantities, then production with in-process checks, then packing and delivery to the site address you nominated. Our logistics and door-to-door delivery service covers freight arrangements and the paperwork that goes with them, so the panels arrive where your fitter can actually receive them. Where the wall needs to be installed as part of a larger fit-out, our team provides on-site guidance and handover inspection; confirm the scope for your address before ordering.
Send Us The Brief
SANTERSON is a China-based furniture and building materials manufacturer supplying custom interior products for villa, hotel and office projects worldwide. Send your wall dimensions, photographs and design intent, and we will come back with a panel specification, a setting-out proposal and a quotation you can compare line by line. Talk to PHILLIP on WhatsApp +86-13928214007, email santerson@qq.com, or use the contact page.