Interior doors are one of the last line items on a project schedule and one of the first things every occupant touches. A standard interior hinged door looks simple — a leaf, a frame, hardware — yet a single mismatched dimension or an unspecified finish can stall handover across a whole floor. If you are specifying doors for villas, apartments or hospitality rooms, this checklist walks through everything worth confirming before you place the order.

1. Openings, Sizes and Tolerances

Doors for renovation and fit-out projects are rarely built to one nominal size. Existing openings vary by a few millimetres from room to room, and new partitions shift during construction. Before requesting a quotation, take a door schedule that records, for each opening: clear width and height of the finished opening, wall build-up thickness (the frame has to match the completed wall, not the bare stud), floor finish levels, and which hand the door swings.

  • A room-by-room door schedule with an ID number for every opening — never order from an average size.
  • Made-to-measure sizing confirmed against site dimensions after the wall and floor finishes are complete.
  • Frame depth stated to match the finished wall thickness, including plasterboard, render or cladding build-up.
  • Clearance gaps noted for floor coverings, especially carpet or threshold strips at door bottoms.

2. Door Type and How It Opens

Hinged doors suit most residential and hotel room applications because they seal well, are easy to maintain and come in the widest range of finishes. When comparing them with space-saving alternatives on tight plans, check whether the design calls for a sliding or pocket arrangement instead — flush interior doors and sliding options sit in the same collection and can be coordinated with hinged leaves so the whole floor reads consistently.

  • Single or double leaf, and whether pairs are needed at wider openings such as living-room entries.
  • Swing direction and latch hand marked on the drawing for every opening.

3. Core, Materials and Finish

Ask what is inside the leaf as well as what is on it. Veneered leaves give a timber appearance with better dimensional stability than solid timber in air-conditioned interiors; painted and lacquered leaves suit modern schemes; glass-inset leaves bring light into internal corridors. Our standard interior hinged doors are part of the Interior Doors collection and are offered with made-to-measure sizing plus material and finish options, so each opening can be specified to the room rather than forced into a catalogue size.

  • Leaf construction and core type confirmed in writing for each door type on the schedule.
  • Finish name and sample reference recorded — veneer species, paint colour code or lacquer sheen.
  • Matching architraves, skirting and frames ordered from the same batch and finish.
  • Edge treatment and whether pre-hung sets (leaf pre-mounted in frame with hinges) are supplied.

4. Hardware and Ironmongery

Hardware is where specifications go wrong most often, because locks, hinges and handles are usually bought separately from the door. Confirm what the supplier includes and what the site contractor provides.

  • Hinge grade and quantity per leaf, plus whether hinge mortices are pre-cut at the factory.
  • Lock case format (mortice or tubular), keying strategy for hotel rooms, and privacy sets for bathrooms.
  • Handle style, backset and rose type matched to the leaf thickness.
  • Door closers, door stops, thresholds and intumescent strips — if any are required by the design, they must be listed on the schedule rather than assumed.

5. Performance and Room Requirements

Different rooms ask different things of the same door line. Bathrooms need finishes that tolerate humidity and frequent cleaning; bedrooms and hotel rooms benefit from leaves that seat tightly with seals and drop-down seals to limit sound transfer; corridors in multi-unit buildings may require fire-rated assemblies. Do not assume one construction covers all of these.

  • Acoustic expectations noted per room type, with seals and thresholds specified accordingly.
  • Any rated or special-performance doors identified separately on the schedule, with their hardware sets.
  • Wet-area rooms flagged so finish and edge sealing are chosen for the environment.

6. Packaging, Delivery and Site Handling

Doors are damaged more in transit and on site than in production. A buying checklist should cover how they arrive and where they wait.

  • Packaging method for each container load and protection of finished faces and edges.
  • Delivery address, unloading arrangements and lift access at the project.
  • Storage plan on site: doors stored flat and dry, out of traffic routes, installed after wet trades finish.

7. Ordering Sequence and After-Sales

The commercial details matter as much as the technical ones. Confirm measurement responsibility (does the supplier survey, or does the site provide dimensions), what happens if an opening changes after production starts, how snags are handled at handover, and which parts — hinges, locks, replacement leaves — remain available later.

When doors are ordered together with cabinetry, wall panelling and joinery from one manufacturer, finishes match more reliably, one shipment covers several trades, and a single coordination contact follows the order through production and delivery. That is how our decorative interior doors are supplied on villa and apartment fit-outs — matched to the same veneers, paints and hardware as the built-in furniture around them.

Door Specification Sheet: What to Record for Every Opening

ItemWhat to confirm
Opening IDRoom and door number from the door schedule
Finished opening sizeWidth × height, measured after wall and floor finishes
Wall build-upTotal finished thickness for frame depth
Leaf constructionCore type, leaf thickness, single or double leaf
FinishVeneer species, colour code or lacquer sheen, with sample reference
Swing and handOpening direction, latch side
Hardware setHinges, lock format, handles, closers, seals
Special requirementsAcoustic, rated or wet-area specification
DeliveryPackaging, address, unloading, storage plan
After-salesSnag process, spare parts and replacement availability
Practical tip: send your door schedule to the manufacturer before you lock in a price. Made-to-measure doors are economical when dimensions are settled; they become change orders when openings move mid-production.

Frequently Asked Questions

Can all interior hinged doors be ordered in custom sizes?

For project work, yes — our Interior Doors collection is supplied with made-to-measure sizing, so each opening on the schedule is produced to site dimensions rather than a standard stock size. Confirm final dimensions after wall and floor finishes are complete.

Should doors be ordered before or after the wet trades finish?

Order early enough for production lead time, but measure after plastering, flooring and threshold levels are set. The safest sequence is: partitions built, finishes complete, final survey taken, then doors manufactured and installed last before handover.

Do I have to source hardware from the door supplier?

No, but it simplifies coordination. When hinges, locks and handles are confirmed with the door order, factory-cut hinge positions and pre-hung sets reduce work on site and avoid mismatched backsets and leaf thicknesses.

Is one door construction suitable for the whole building?

Rarely. Bedrooms, bathrooms, offices and hotel rooms have different acoustic, moisture and security demands. Group openings by requirement on the schedule and specify a construction and hardware set for each group.

Ordering Doors as Part of a Complete Fit-Out

Doors rarely stand alone on a project bill of quantities. They sit beside wardrobes, vanities, kitchen cabinetry, wall panelling and flooring, and every one of those items has to match in finish and level. Working with a one-stop furniture and building materials supplier means the door schedule is coordinated with the joinery package, samples come from the same production batches, and logistics — sea or air freight, customs paperwork, door-to-door delivery — are arranged once for the whole order rather than shipment by shipment.

Before you send an enquiry, have your door schedule, finish references and programme dates ready. That single document is the difference between a quotation you can compare and a price you will re-negotiate after production starts.