A hotel guest bathroom lives or dies on the washbasin wall. Housekeeping wipes it several times a day, guests lean on it, water runs over it, and the mirror above it has to work in low light at two in the morning. The Santerson Integrated Countertop Vanity answers that pressure by putting basin and counter in one continuous run — no joint line for grout to fail, no lip for water to pool behind. The checklist below is how a procurement team or fit-out contractor should specify it for a hotel room bathroom, a serviced-apartment unit, or a villa guest wing — from the first setting-out drawing to the day the units arrive on site.

1. Confirm the vanity type against the room type

The Santerson vanities collection covers several configurations, and each suits a different bathroom plan. For a standard single-sink guest bathroom, the integrated countertop unit keeps the counter and basin as one piece. Where the plan calls for a wall-hung look with exposed floor beneath, the Santerson Floating Vanity is the closer match, and it makes floor cleaning faster for housekeeping. For twin-basin master suites and accessible rooms where two people use the space at once, specify the Santerson Double Vanity instead, and confirm basin spacing on the drawing before production.

These pages list made-to-measure sizing, material and finish options, and layouts tailored to each project. In practice that means you send the room dimension and the drainage position, and the unit is built around them rather than adjusted on site.

2. Lock down the countertop and basin combination

An integrated countertop vanity can be ordered with different counter materials and basin styles, and the choice changes both the look and the maintenance routine:

  • Integrated Basin — basin formed as part of the counter surface. Fewest seams, easiest wipe-down, and no silicone line to re-do after a year of cleaning.
  • Santerson Undermount Basin — basin fixed below the counter. Water sweeps straight into the bowl, but the cut-out and the countertop material have to be confirmed together.
  • Santerson Vessel Basin (Above Counter) — basin sitting on top of the counter. Strong visual statement for boutique and design-led hotels; check the tap spout height and reach against the basin rim.
  • Santerson Stone & Marble Surfaces — for projects specifying a natural or stone-look counter face across multiple bathrooms.
  • Santerson Double Basin Countertop — where the room is wide enough for two basins and you want one continuous counter run rather than two separate units.

For a high-turnover guest room we usually steer toward an integrated or undermount basin in a solid surface: fewer edges, and housekeeping can clean it with the same routine used on the rest of the counter. Vessel basins photograph well for boutique and design-led properties but need more wiping around the base.

3. Set the storage layout to what guests actually bring

Hotel vanities are not wardrobe cabinets. Guests need a hairdryer, towels within reach, toiletries, and a place for a phone — nothing more. Drawers take that better than doors on hinges, and the Santerson Drawer Units range shows how shallow top drawers and deeper lower drawers divide up the carcass. Where the design wants open display for folded towels or a tray, add niches rather than glass doors: fewer handles to break, nothing to dust.

Mirror storage belongs in the same specification. The Santerson LED Mirror Cabinet keeps glasses and medication out of sight while providing the light source at face level; a Standard Mirror Cabinet does the same job without integrated lighting if the room already has good vanity lighting.

4. Specify the lighting and electrical at the same time as the joinery

The most common site problem is a finished vanity with no power run for the mirror light, or a light fitted after the fact that clashes with the finish. Decide this at drawing stage:

Each of these pages notes that electrical specification and bathroom suitability must be confirmed per project. Electrical ratings and installation requirements are set by the local code at the site, so hand the schedule to the project electrician for sign-off rather than assuming a catalogue figure carries over from another country.

5. Match finishes to the rest of the joinery package

A guest floor usually contains more cabinetry than just the vanity: built-in wardrobes, a minibar or bar unit, and in suites and serviced apartments a kitchenette. Ordering these from one maker keeps veneer tones, edge banding and hardware consistent across the floor, which is where a project starts to look finished rather than assembled.

SANTERSON works as a furniture and building materials supplier covering furniture, interior fixtures and building finishes from factories in China, so the bathroom joinery can be specified alongside the bedroom storage and the public-area fit-out. The Custom Built-in Kitchen Cabinets for Hotel & Apartment Projects line covers kitchenettes and pantries on the same drawing standards, and the Custom & OEM Service page lists bespoke finishes, textures and prototyping when a designer wants a colour that is not in the catalogue.

6. Verify the dimensions before production, not on site

Because these units are made to measure, the tolerance work happens on paper. Before releasing the order, check each of the following against the setting-out drawing:

  • Finished wall-to-wall width, measured off the tiled face — not the structural wall.
  • Waste and supply positions, including how far the vanity carcass clears the trap.
  • Counter depth against the door swing and the shower screen or bath edge.
  • Basin centre line relative to the mirror, so the light does not fall on the basin rim.
  • Drawer clearance in front of the unit when the drawer is fully open.
  • The same checks repeated on a mock-up room before the full floor is released.

A mock-up room is the cheapest insurance in a hotel project. One approved sample bathroom fixes the finish, the drawer layout, the mirror light and the tapware height for every subsequent room.

7. Plan delivery, installation and support as one package

Vanities arrive in a project sequence with tiles, glass, mirrors, tapware and lighting, and the order of arrival decides whether the site runs smoothly. SANTERSON describes turnkey delivery from design consultation and material selection through production, freight and door-to-door delivery, with installation and after-sales support listed as part of the service scope on the services pages. The logistics page covers sea, air and rail freight with customs paperwork and container loading.

Treat those as scope descriptions to be confirmed in your contract, not fixed guarantees. Import terms, duties, transit time, installer availability on site, warranty wording and response times should all be agreed in writing for the specific project and destination, since they vary by country and by order.

A short specification sheet to send with your enquiry

To get a usable quotation quickly, send the following with each room type:

  • Room count per vanity type (single, double, floating, integrated countertop).
  • Setting-out drawing with finished dimensions and drainage positions.
  • Chosen counter material and basin style — integrated, undermount or vessel.
  • Drawer and open-storage layout, plus mirror cabinet type.
  • Lighting schedule with colour temperature and switching arrangement.
  • Hardware and finish references, matched to the joinery package for the rest of the floor.
  • Delivery destination, port or site, and required arrival sequence.

Send that through the contact page and the specification conversation starts from drawings rather than catalogue guesses. SANTERSON has been producing furniture and building materials for villa, hospitality and office projects since 2008, with project work referenced in Australia among other markets.

Dimensions, material selections, electrical ratings and installation requirements for every unit are confirmed per project; the details on each product page describe available configuration options rather than one fixed specification.