A swim spa on a hotel or resort site is not a single line item you can drop into an FF&E schedule and forget about. It arrives as a package of structure, water treatment, electrical load, insulation, delivery access and commissioning, and every one of those elements needs a decision before the purchase order is raised. The Outdoor Swim Spa WS-PC07ST sits in our configurable outdoor swim and hydrotherapy range, and this guide walks procurement teams through the specification checks, site conditions and coordination steps that decide whether the installation runs smoothly or stalls on site.

What the WS-PC07ST delivers on a hospitality site

The WS-PC07ST is a plunge-style swim spa rather than a lap pool: it gives guests a current to swim against in a shallow footprint, plus jet stations for hydrotherapy. That combination is why hotel and villa-resort buyers shortlist this format — a full swimming pool needs far more plant room, water volume and maintenance labour, while a swim spa of this size can sit on a terrace, a podium deck or a garden setting next to the existing pool.

The catalog specification for this model lists overall dimensions of 7000 × 2400 × 1470 mm, one control system, one swim training system, one filter pump, six jets, four LED lights and a total power figure of 6.55 kW. The features shown on the product page are water jets, LED lighting, ozone sanitisation and the swim training system. Treat these as the catalog baseline: the equipment actually fitted depends on the configuration you confirm with us before order, and options such as a water pump, heat pump, UV sterilisation, sand filtration, additional insulation and access steps are listed separately in the catalogue.

Because the electrical load is published against a specific configuration, do not carry the power figure into your mechanical and electrical drawings until the final option list is signed off. A heat pump or an upgraded pump changes the connected load, and that change ripples through cable sizing, protection devices and, on a retrofit site, the available supply capacity.

Reading the specification sheet as a buyer

Product data sheets for swim spas look detailed but still leave gaps that only matter in a commercial context. Here is how to read each field when you are costing a project rather than a private residence.

Specification fieldWhat it controls on siteProcurement action
Overall dimensions 7000 × 2400 × 1470 mmDeck cut-out, structural bearing, crane or lift route, door and gate widths on the delivery pathSend your deck layout and access photos with the enquiry so we can confirm the delivery and positioning method
Jet total 6 pcsHydrotherapy capacity per session, seating layout inside the shell, pump dutyMatch jet count to expected guest use; confirm whether jets are shared with the swim station
Filter pump 1 pc, ozone systemWater turnover and sanitisation basis, chemical load, backwash arrangementConfirm filtration type for your local water quality and the maintenance schedule you can staff
LED lights 4Night-time presentation, ambience, safety lighting around the shellAgree control and colour settings with your lighting designer if the spa is part of a feature scheme
Total power 6.55 kW (as catalogued)Supply capacity, distribution board space, earthing and RCD arrangementRe-confirm the load after the option list is fixed; have your electrical engineer size the final circuit
Control system 1 setHow staff operate temperature, filtration cycles and lightingAsk for operating instructions in the language your maintenance team uses, plus a spare-parts list

One practical point: our catalogue lists several closely related shells in this range — variants with different lengths and equipment sets, such as the shorter Outdoor Swim Spa WS-PC06ST and the longer Outdoor Swim Spa WS-PC08ST. If your deck opening is fixed, compare those models against the available length before you commit to the 7 m shell. Where a project needs a longer hydrotherapy and relaxation pool with a separate swim zone, our Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool is a better starting point.

Site conditions to settle before the purchase order

Most swim spa delays on hospitality projects come from site work that was never assigned to a party. Settle these six items in writing with your contractor, then send us the confirmed answers.

  • Structural support. A filled shell of this size is a heavy point load. The deck slab, pedestal system or ground pad must be designed for the wet weight, not just the dry weight of the cabinet.
  • Drainage and overflow. Confirm where backwash water, overflow and any drainage from the plant compartment discharge, and whether an oil or debris interceptor is required by your local authority.
  • Electrical supply. Route and isolate the supply per your engineer's design, with the correct protection and bonding for a wet environment. Do not assume the catalogued power figure covers your chosen options.
  • Access and lifting. Measure gates, lifts, corridors and any crane pick. On podium decks and rooftop terraces the delivery method often drives cost more than the unit itself.
  • Ventilation and plant space. Keep service access to the pump, filter and control components clear; sealed enclosures that look tidy can make routine maintenance impossible.
  • Operating regime. Decide target water temperature, filtration run hours and whether guests or staff control the system. This determines insulation level and heating option more reliably than any generic rule of thumb.
Local regulations differ on public and semi-public pools — barriers, water-quality monitoring, signage and plant-room separation are common requirements. Confirm with your local authority or building surveyor what applies to a swim spa in your setting before the design is frozen. We supply and configure the unit; approval of the installation arrangement remains with your project team.

How a swim spa moves through our project process

SANTERSON has operated as a China-based manufacturer and one-stop supplier of furniture and building materials since 2008, and swim spas are supplied within the same project workflow we use for cabinetry, outdoor furniture and interior fixtures. For a hospitality buyer that means the spa does not have to be managed as an isolated import.

  • Specification and quotation. Send drawings or photographs with your required dimensions and options. We confirm the configuration, included equipment and electrical requirements, then issue a quotation against that fixed specification.
  • Production. The shell, cabinet, water system and options are built to the confirmed list. Where a project needs a bespoke finish or dimension, our Custom & OEM Service covers material and finish choices for surrounding elements such as cladding, steps and decking surrounds.
  • Consolidated shipping. The spa can travel with the rest of your package — outdoor lounge settings, poolside and swim spa products, bathroom ceramics, lighting and cabinetry — under one coordination plan. Our Logistics & Door-to-Door Delivery service covers freight forwarding, packaging and container loading, customs paperwork and shipment tracking. Freight terms, duties and transit times are quoted per destination and should be confirmed for your port of entry.
  • Installation support and after-sales. We provide installation guidance, inspection support against a snag list, warranty coverage on the supplied unit and spare parts for wear components. Details are set out on our Installation & After-sales Support page; confirm the applicable terms for your project before order.
  • Whole-project coordination. If the spa is one element of a wider fit-out, our Hospitality Project Furnishing service coordinates design, product specification, production, logistics and site handover across all packages.

A pre-order checklist for the procurement file

Before raising the purchase order, make sure these documents sit in your file. Missing any of them is what typically turns a straightforward supply into a stalled site programme.

  • Signed specification sheet listing model, dimensions, jets, filtration, sanitisation, lighting, heating and insulation as configured — not the catalogue default.
  • Confirmed electrical load and supply requirement for that configuration, countersigned by your electrical engineer.
  • Structural sign-off for the wet weight at the chosen location, with the lift and access route agreed.
  • Delivery terms, named destination, and a clear split of responsibility for unloading, positioning and connection.
  • Commissioning and handover plan, including water-treatment start-up, staff training material and the spare-parts list.
  • Warranty scope in writing: what is covered, on which components, for how long, and what your maintenance obligations are.

Cost drivers to expect when you compare quotations

Two identical-looking swim spas can quote very differently. The differences usually sit in the options rather than the shell: heating method and its efficiency, filtration type, insulation package, the control system, the delivery route to an elevated or restricted site, and whether the supplier coordinates the unit with the rest of your order. When you compare bids, line up the configuration list first and the price second — a lower headline price that omits insulation or a heat pump simply moves the cost into energy use and site works.

If you are specifying more than one unit across guest villas or a spa terrace, say so in the enquiry. Grouping units into one shipment and one coordination plan is normally where the practical saving appears, and it keeps commissioning on a single schedule rather than a series of separate visits.

Next step

Send us the model reference, your deck or ground layout, the access route to the installation point and your target operating regime, and we will confirm the WS-PC07ST configuration, included equipment, electrical requirement and a quotation against that specification. For buyers still weighing formats, our Swimming Pools and Swim Spas category lists the full range of sizes and configurations available for hospitality and villa projects.

SANTERSON — furniture and building materials manufacturer and one-stop project supplier, headquartered in Foshan, China, with offices in Vietnam, Singapore and South Africa. Speak to PHILLIP about your swim spa package and the rest of your project order.