A floor-to-ceiling shelving or media wall looks simple on a mood board and complicated on site. The difference is almost always the quality of the information handed to the factory before production starts. This guide walks through what we need from you to turn a design brief into a workable quotation for Santerson Floor to Ceiling Systems, and what you get back at each stage.
Start with the room, not the shelf
These are made-to-measure systems. Layout, dimensions, materials and finishes are specified per space rather than picked from a fixed catalogue size, so the enquiry has to describe the space as it will exist at handover. Before you list any shelving, send us:
- The room type and how it is used — living room, study, guest suite, lobby or office floor.
- Finished floor-to-ceiling heights, including any skirting, cornice, coving or ceiling shadow gap that the unit must meet.
- Wall construction and what sits in the wall: structural timber, steel, block, plasterboard, hidden pipework or existing electrical routes.
- Obstacles with dimensions — switches, sockets, radiators, downlights, beams, doors that swing into the run.
- The drawings you already have: floor plan, elevations of the relevant walls, and any interior design mood board or reference image.
If your brief is still at concept stage, send what exists. Our team works from sketches and reference photographs as well as detailed architectural drawings, and we will flag the gaps instead of guessing them.
What to specify in the enquiry
The table below is the practical checklist we use internally. You do not need to answer every line up front — an incomplete brief is normal — but each answered row removes one round of clarification from the quotation.
| Item | What to tell us |
|---|---|
| Wall run and heights | Overall width and finished height per elevation, plus whether the unit should be recessed into a niche or project from the wall face. |
| Layout split | Open shelving versus closed cabinets, drawer banks, display niches, integrated media zone, and where you want visual breaks in a long run. |
| Materials and finish | Board substrate preference, door and panel style, handle or handleless detail, and the colour or veneer reference. Send samples or a brand code if you have one. |
| Load and use | What the shelves carry: books, ceramics, audiovisual equipment, and whether the run sits near a wet area such as a basin or powder room. This drives shelf span and support detail. |
| Integrated lighting | Shelf, niche or cabinet lighting, plus where transformers and switching may sit. Electrical routes should be agreed before panels are cut. |
| Adjacent finishes | Flooring, wall panelling and ceiling detail the system has to meet, so edges and trims are resolved on paper rather than on site. |
| Quantity and locations | Number of rooms or units, project address, and floor level for delivery access. |
| Programme | Target installation month and any fixed dates, so production and shipping can be planned backwards from them. |
Where a comparable configuration already exists on our site, Santerson Floor to Ceiling Modular Systems shows the same made-to-measure approach for living spaces, and Santerson Floor to Ceiling Bookshelves covers book-heavy layouts with project-tailored shelving. Use them as reference points in your brief; the specification is still built around your drawings.
What happens after you send it
Enquiries follow the same route our villa and hospitality projects do, under Turnkey Solutions:
- Review and clarification. We read the drawings, confirm the scope in writing, and send back a short list of anything missing — usually heights, wall build-up or finish references.
- Specification and quotation. You receive an itemised breakdown by room or elevation: dimensions, materials, finishes, hardware, lighting and packaging. Options are priced separately so you can decide on budget rather than accept a single lump figure.
- Detail confirmation. Before cutting, we confirm the approved drawings with you, including edge details, shelf positions and electrical points. This is the stage where changes are cheap; after it, changes cost time and money.
- Production and quality checks. Panels, carcasses and doors are made to the confirmed specification, with our Custom & OEM Service covering bespoke finishes and prototyping where a project needs them.
- Logistics. Crating, container loading, export paperwork and delivery are arranged through our Logistics & Door-to-Door Delivery service. Tell us the delivery address and access constraints early — basement lifts, narrow stairwells and crane access all affect crating.
- Installation and support. On-site installation, inspection of snags and follow-up support are handled through our Installation & After-sales Support. Warranty terms, response times and local installer arrangements are confirmed for your specific project, since they vary by scope and destination.
Send the brief
Attach your drawings, photographs of the wall, and the notes above through our contact page, or reach us directly on WhatsApp at +86-13928214007 (PHILLIP) or by email at santerson@qq.com. If your project is in Australia, mention the city and stage of construction — our published project cases include villa work in Sydney, Melbourne, Perth, Willoughby and North Turramurra, and local access and delivery logistics shape the quotation.
SANTERSON — furniture and building materials manufacturer in Foshan, China, operating since 2008, with offices in Vietnam, Singapore and South Africa.