A solid colour acrylic kitchen looks effortless on site and unforgiving in a quotation. Because the doors carry no grain, no moulding and no hardware break lines to hide behind, every difference in sheen, edge line or panel alignment shows up under kitchen lighting. If your checklist stops at door thickness and price per linear metre, you will discover the gaps after installation, when correcting them costs the most.
The list below follows the order in which decisions actually lock in on a project: specification first, then the sample stage, then pricing structure, then logistics and site. It is written for buyers ordering Solid Color Acrylic Cabinets from an overseas manufacturer, whether for a single villa or a repeat apartment type.
1. A specification that states the door build, not just the colour name
Colour names are not comparable between factories. "Matte grey" from one supplier and another can differ in depth, warmth and light reflection. Ask for what sits underneath the coloured face, in writing:
- The substrate used for the door core, and how both faces are balanced so a large flat door stays flat over time.
- How the coloured surface is applied to the edges, and whether the edge line will read as a visible seam against the face colour.
- Which direction the sheet was cut and faced for each door, because it changes how light rolls across a run of doors.
- The substrate and finish used for carcass panels, shelves and any open or exposed panels, which rarely match the door specification by default.
Where you want a handleless look or an integrated handle profile, have the profile drawn rather than described. Two suppliers can both quote "handleless" and deliver completely different finger reveals.
2. A physical sample board approved before the order is placed
Do not approve a solid colour from a photograph, a render or a screen. Request a sample of the actual door construction: face, edge and a short length of the profile you intend to use. Then judge it under three conditions — daylight, warm downlight, and the LED strip you plan to fit inside glass cabinets and beneath wall units.
For high-sheen surfaces, check the sample at an angle for orange-peel texture and for how visible fingerprints and cleaning marks are. For low-sheen surfaces, check whether the finish feels consistent across the face and the edge. If you are also considering other finishes in the same collection — Matte Acrylic Cabinets for bedrooms or laundry, Two Tone Acrylic Cabinets where you want a lighter upper band — sample each finish separately. Different surface types behave differently to the same light.
3. Drawings that carry site dimensions, not catalogue sizes
Made-to-measure only helps if the measurements behind it are current. Before drawings are signed off, confirm:
- Cabinet heights and widths against finished floor levels and finished wall faces, including any tiling or plaster thickness still to come.
- How the run resolves at ceilings that are not level, and who decides the scribe or filler sizes on site.
- Cut-out details for appliances, sinks, taps, sockets and switch plates, with the appliance model numbers stated.
- Interior layout per cabinet: shelf heights, drawer stacks, pull-outs, waste bins, spice and bottle units, and where power is needed inside a cabinet.
- Appliance doors and panels that must match the kitchen doors, plus any panels for pantry, laundry or bathroom vanities in the same colour.
Ask for elevation drawings with dimensions, and have your site contact sign them. A production order released from unsigned drawings is the most common cause of on-site rework on a custom kitchen.
4. A quotation you can compare line by line
Two quotations for the same kitchen are only comparable if both carry the same inclusions. Your checklist should require each of these to be itemised:
| Line item | What to confirm |
|---|---|
| Doors, carcasses, plinths, fillers | Which are included and which are charged as extras; how offcuts and scribes are priced. |
| Worktop | Whether it is supplied, who templates it, and whether cut-outs and edge profile are in the price. |
| Sinks, taps, appliances | Supply only, or supply and install; brand and model stated. |
| Hardware | Hinge and runner brand and grade, soft-close specification, and what is covered if hardware needs replacing later. |
| Lighting | Cabinet lighting, transformers, drivers and the wiring provision each party is responsible for. |
| Packaging | Panel-by-panel packing method, corner protection, moisture barrier and crate type for ocean freight. |
| Freight and duties | The delivery term on the quotation, what it covers, and which costs sit with you as importer. |
| Payment terms | Deposit, milestone before shipment, and what triggers each payment. |
Also check how variations are priced. A change to one door size after drawings are signed is a small number on paper and a large one when it reopens a whole production batch.
5. Production, inspection and shipment terms agreed in advance
Fix the checkpoints before manufacturing starts, not after problems appear:
- A stated production window from signed drawings to ready-to-ship, and what resets that clock.
- Whether you can request a pre-shipment inspection, and who arranges it if you have no agent in the country of manufacture.
- Photographic records before packing: doors laid out to show colour consistency across the run, plus edge and hardware detail.
- Marking scheme on each carton matched to the drawing numbers, so an installer can find panel 14 without opening everything.
- Spare parts policy: spare doors, spare panels, extra hinges and runners, and how a replacement door is ordered years later in the same colour.
Ask what happens if a panel arrives damaged. The practical answer is usually a partial re-production and a place in the next container, so it helps to know the lead time for replacements and who pays the freight on them.
6. Site readiness and installation responsibility
Acrylic-faced doors are installed last in a sequence of trades that must already be finished. Before the containers move, confirm on your side:
- Floors, wall finishes, tiling and paint complete in the kitchen area, with levels fixed.
- Plumbing rough-in, appliance positions and electrical points verified against the signed drawings.
- A clear, dry storage area at the property large enough for the delivery, since panels should stay crated until fitting.
- Who installs: your own cabinet maker, or the supplier's installation service. If it is the supplier, confirm whether installers travel to the site and what site preparation they expect.
- A snag list process at handover, with an agreed route for reporting and closing items out.
If one party is coordinating cabinetry together with other fit-out items — wardrobes, vanities, doors, flooring, lighting — say so in the enquiry early. Coordinated orders share site measurements, delivery windows and inspection visits, which removes duplicated work.
7. The paperwork that clears customs without delays
- Commercial invoice and packing list with values and carton marks that match what physically arrives.
- Documents on the shipment that your broker requires for import, confirmed with the broker before goods leave.
- Freight booking details: vessel or flight, consolidation arrangements, and who tracks the shipment and reports to you.
- Insurance cover for the value being carried, and who claims if cargo is damaged in transit.
Ask your customs broker what they need in your destination market rather than accepting a generic document set. Import requirements vary by product type and country, and a missing certificate can hold a container at the port long after production was finished.
A short pre-order test
Before signing, try to answer these from the documents in front of you. If any answer is missing, it belongs in a written question, not an assumption:
- Which construction and edge detail sits behind my colour name?
- Have I approved a physical sample under my own lighting?
- Are the drawings signed against finished site levels?
- Does the quotation itemise worktop, hardware, lighting, packaging and freight terms?
- Is there an inspection checkpoint before goods are packed?
- Who installs, who inspects, and who resolves snags after handover?
SANTERSON manufactures cabinetry alongside other furniture and building materials for residential and hospitality projects, with made-to-measure sizing, material and finish selection arranged per project. Send your drawings and required finish list to request a quotation that itemises each of the lines above.