A proposal for glass open wardrobes looks complete on paper: elevations, a finish schedule, a unit price. What it rarely tells you is how the piece will behave once it is delivered to site, fixed to a wall that is not perfectly plumb, and loaded with the clothes of a real household. Before you sign anything, work through the checks below in the order a project actually runs.
1. Confirm the scope line by line, not by headline
Start with what is included and what is quoted as an extra. Open-front wardrobe work is rarely one item; it is carcasses, shelving, hanging rails, drawers, glass partitions, framing, lighting and sometimes an island or a bench seat. Read the line items against your room drawings and mark anything you cannot find priced.
- Carcass depth, height and width for every bay, including how the unit meets the skirting, cornice and ceiling.
- Whether top panels, scribes and filler pieces are included, or billed on site as variations.
- Internal fittings: rail counts, tray depths, shelf spans, soft-close hardware brand and model.
- Glass type, thickness and edge treatment for any glazed dividers or end panels, plus whether toughened glass is specified.
- What is explicitly excluded: on-site making good, electrical connection, plinth or floor preparation.
A supplier that lists exclusions plainly is usually easier to work with than one whose quotation has no visible gaps. Ask for the exclusions in writing even if the answer is “none”.
2. Check how made-to-measure the proposal really is
Many catalogue proposals describe themselves as custom but are built from fixed modules with a filler panel at one end. For open wardrobes this matters, because an exposed module reveals every compromise: a rail that ends short of the bay, a shelf that does not line up with its neighbour, or a glass panel cut to fit around an out-of-square wall.
Ask three direct questions and record the answers:
- Are dimensions taken from your site survey, or entered into a standard module grid?
- Can the vertical divisions be positioned freely to match bed height, door swing and ceiling lines?
- If a wall measures 2,410 mm rather than 2,400 mm, does the drawing change, or does a scribe absorb the difference?
For apartment and villa work where several bedrooms share one design language, also ask whether the same detailing carries across to custom minimalist bedroom wardrobes elsewhere in the project. Consistent carcass depths, handleless edges and finish codes across rooms are what make a fit-out read as designed rather than assembled.
3. Read the material schedule for performance, not adjectives
Marketing copy says “premium” and “high quality”. A workable proposal states what the board is, what it is faced with, and how the edges are sealed. That is the information your site team needs when the units arrive.
| Item | What to look for in the proposal |
| Carcass board | Board type and thickness per component; moisture-resistant specification for any wardrobe against an external or wet wall. |
| Door and panel faces | Finish system (lacquer, laminate, veneer, acrylic), grain direction, and the reference code you will order future panels against. |
| Edges | Edge banding thickness and material on all visible edges; ABS or matching veneer rather than bare melamine on open shelving. |
| Glass | Toughened safety glass where within reach of occupants; tint, bronze, clear or frosted; frame profile and fixings. |
| Hardware | Hinge and runner make, load rating, soft-close option, and replacement part numbers for maintenance. |
| Internal lighting | Driver location, cable routing, and whether the profile is fixed to the carcass or supplied loose for the electrician. |
If a finish name appears in the price schedule but not in the specification table, treat it as unresolved until it does. This is the most common source of disputes at handover.
4. Test the proposal against how the wardrobe will be used
Open wardrobes show everything, so storage planning cannot be approximate. Compare the internal layout on the drawing with a realistic list of what has to live inside it.
- Long-hanging height for coats and dresses, measured against the rail height actually drawn.
- Drawer zones for folded clothing and personal items, where an open shelved bay offers no privacy or dust protection.
- Shelf spans that will not sag under stacked knitwear; check the span and the board thickness together.
- A clear route to the hanging rail without obstruction from a glazed divider or an adjacent return.
- Dust strategy: with no doors, decide whether fabric covers, glass screens or a closed section is specified.
For guest-facing work such as serviced apartments and villa rentals, weigh the visual openness against housekeeping effort. A proposal that offers both an open display bay and a closed wardrobe section, priced separately, gives the client a real choice instead of a single fixed answer.
5. Verify the delivery, finishing and fixing route
Wardrobe failures on site are usually coordination failures rather than manufacturing failures. Ask how the proposal moves from drawing to installed work.
- Survey and sign-off: who takes the final dimensions, and is a signed drawing issued before production starts?
- Packaging and packing list: are panels marked with bay and elevation references that match the drawings?
- Freight terms: what is included in the price — port, door-to-door delivery, or both quoted separately?
- Fixing method: cleat, bracket or concealed fixings, and what wall construction each assumes. Glass-fronted sections need their framing detail shown, not assumed.
- Sequence: does the joinery arrive before flooring, painting and electrical first-fix are complete?
- After handover: how replacement shelves, hinges or a damaged glass panel are ordered later.
A supplier handling wardrobe work alongside other fit-out trades — cabinetry, wall panelling, doors, flooring and lighting — can often coordinate these handovers in one programme. That is worth asking about when a project has several bedrooms or a whole-floor boutique style walk in wardrobes to deliver.
6. Compare proposals on the same basis
Take two or three quotations and lay them out side by side under identical headings: scope included, exclusions, board and finish specification, hardware, glass specification, delivery terms, fixing responsibility, and what happens if a panel is damaged in transit. Differences in price usually trace back to one of those rows rather than to margin.
Be cautious of a quotation that is materially lower than the others without an explanation in the specification table. Thinner board, unbranded runners, untoughened glass or omitted scribe panels all reduce cost on paper and raise it on site.
A short pre-contract list
- Scope read against room drawings, with exclusions confirmed in writing.
- Made-to-measure basis verified: site dimensions, free division positions, no hidden module grid.
- Material schedule complete, including glass specification and hardware part numbers.
- Internal layout checked against real storage needs and dust exposure.
- Delivery route, fixing method and trade sequence agreed before production starts.
- Signed drawing and finish codes on file for future replacements.
SANTERSON works on made-to-measure wardrobe and fit-out packages for villa, apartment and hospitality projects, with specification, production, logistics and installation handled as one programme. Send your room drawings and a target completion date, and the proposal comes back with dimensions, finishes and exclusions stated line by line so you can compare it against any other quotation on the same basis.