A glass-front media unit looks simple on a drawing: a cabinet, a sheet of glass, a television. On site it is the piece everyone notices first and the one that exposes every measurement error. When the order crosses a border, that margin shrinks again: a replacement panel or a corrected carcass means another container and another round of lead time, not a short trip from the workshop down the road. This guide walks through how to plan such an order end to end — measurement, specification, packing, freight and receiving — following the way SANTERSON handles project orders from design through door-to-door delivery, applied specifically to Santerson Glass Front Media Units. The planning below follows the way SANTERSON handles project orders from design through door-to-door delivery, applied specifically to Santerson Glass Front Media Units.
Why a glass-front media unit is a poor candidate for improvisation
These units are made to the space. Finish, layout and dimensions are specified per project, which means the carcass, the glass fronts, the shelving behind them and the wall they sit against all share the same set of numbers. Change one dimension on site and you usually change several parts.
Glass adds two more constraints. It is heavy, so the way a unit is supported and carried matters from the moment it leaves the packing line. And it is brittle in exactly the places where a crate takes the worst knocks: corners and edges. A unit that arrives with a chipped edge is not a cosmetic problem; the panel normally has to be remade, because tempering cannot be re-cut afterwards.
That is why the delivery conversation should start at specification stage rather than when the order is placed. The decisions you make about sizes, glazing and assembly are what determine whether the shipment arrives installable.
Step 1: Lock the measurements before anything else
For a project order that will be shipped internationally, take the dimensions from the built condition, not from architectural drawings alone. Wall flatness, floor level, skirting, door openings, the position of sockets and the path the unit has to travel from the street to the room all affect what can be manufactured and how it can be assembled.
- Record finished floor and finished ceiling levels at the installation wall, not just a nominal storey height.
- Mark the exact position of the TV bracket zone, cable runs and any socket that has to stay reachable behind or beside the unit.
- Check the route: doorway widths, lift dimensions, stair turns and corridor clearances decide whether the unit ships as one assembled box or in sections.
- Confirm the fixing substrate. A media wall fixed to studwork needs different hardware and a different build-up than one fixed to masonry or a framed batten wall.
Send those numbers with your project brief rather than after the quotation. Interior design services cover space layout planning, drawings and production coordination, which is where conflicting dimensions get resolved before they reach the factory floor.
Step 2: Specify the unit as a project order, not a catalogue item
The glass front media units listing is configurable: you choose the layout, the finish and the dimensions, then confirm the glass, storage and hardware selections for the specific project. Configurable listings carry limited technical detail on the page itself, so the specification sheet you agree back and forth becomes the controlling document.
For each unit in a multi-room order, set out:
- Overall width, height and depth, plus which elevations are glass-fronted and which are solid.
- Glass type and colour for the fronts, and whether handles, hinges or a push-open mechanism are required.
- Internal fit: shelf positions, drawer units, ventilation for equipment, and cable access points.
- Finish reference for the carcass and frames, matched to other joinery in the same project so the media unit does not sit as a separate colour.
Where a room needs lighting integrated into the same wall, that decision belongs with the specification too. The integrated LED media units in the same collection carry built-in lighting, and their electrical details need confirming for the selected design — driver location, switching and the local supply all have to match the destination market.
If part of the scheme works better as a loose piece rather than built-in joinery, freestanding TV cabinets are also made to measure with material and finish options. Mixing built-in and freestanding across a project is common, but it changes the packing plan, so decide before production.
Step 3: Agree how the order will be assembled and packed
This is the step most buyers skip, and it is the one that decides whether the container arrives useful. Ask for the packing plan in writing and check it against the site access you measured.
Where several units are consolidated into one container, ask for the load plan and keep it with the packing list. It tells you which crates come off first and which sit at the far end of the box — useful when the site can only receive part of a delivery on one day.
Mark each carton with the room it belongs to and the elevation drawing number. In a villa or apartment project with several identical-looking units going to different rooms, unlabelled crates turn a two-day install into a week of guessing.
Step 4: Choose the freight mode against the site programme, not against price alone
An international order has to clear two frontiers — the exporting one and the importing one — so the freight decision should be made against your site programme rather than on the quoted rate alone. Freight forwarding by sea, air and rail is arranged as part of the logistics service, along with customs paperwork, packing and container loading, shipment tracking and door-to-door delivery. Commercial invoices, packing lists, certificates of origin and import documentation are handled on the same coordination.
For a made-to-order joinery package, sea freight is usually the working assumption, and it should be planned backwards from your installation date:
- Confirm production completion dates before you commit to any site milestone for the joinery.
- Leave a buffer between port arrival and installation for customs release and the final leg to site.
- Decide the delivery terms and who is responsible at each handover — factory, forwarder, importer of record, site.
- Consider cargo insurance for a shipment containing glass, and check what the policy covers for breakage.
Import terms, duties, Incoterms, insurance cover, transit time and the exact scope of door-to-door delivery vary case by case. Confirm them for your own project instead of assuming figures from marketing material.
Step 5: Plan receiving and installation before the truck arrives
The delivery is only finished when the unit is level, fixed, glazed and signed off. A few practical points that save rework:
- Photograph crates while still on the vehicle, then again after opening, before signing anything off.
- Inspect glass edges and corners first; a hairline chip is a claim, not a detail to discover during fitting.
- Count packages against the packing list and match crate labels to rooms.
- Store crates flat, dry and upright inside — not outside on the pavement overnight.
Then confirm the site is ready: paint and flooring complete, wall fixings located, power and data pulled to the marked positions, and a level surface for the unit. Installation, inspection and snagging are part of the after-sales service; what varies by country is who performs it, so settle that arrangement before shipping rather than after the container lands.
Step 6: Keep one document trail for the whole order
The most reliable project orders have a single agreed set of drawings and a specification sheet that every later change is written against. The cooperation sequence on the design service side runs from project brief and design proposal, to quotation and detail confirmation, then production, shipment and follow-up. Keeping your dimension records, approved elevations, packing list and shipping documents in one place means a query can be answered with a document reference instead of an argument.
It also protects you on the two things that matter most with glass: proving the condition of goods on arrival, and identifying precisely which panel needs remaking if one does not survive the journey.
A short checklist to send with your enquiry
- Room-by-room list of media units, with widths, heights, depths and which faces are glazed.
- Site access measurements: doorways, lift, stairs, corridor widths, ceiling height at the install point.
- Fixing substrate and whether the wall needs a framed backing.
- Glass type, colour and hardware preference; lighting if integrated.
- Finish references from the rest of the joinery package.
- Destination port or site address, required on-site date, and who acts as importer of record.
Send that list with your enquiry and the specification conversation moves in one round instead of five. Logistics and door-to-door delivery are then arranged around dates you have already agreed, rather than chasing a programme that slipped during production.
Planning a project order of glass-front media units for a villa, apartment or hospitality development? Send your room list and site access measurements through the contact page, and the specification and delivery plan can be worked out together before production starts.