A swim spa with a 7.5-metre shell has to be specified, not just selected. Before you put Outdoor Swim Spa WS-PC07ST-L on a purchase order, the practical question is what you are actually comparing: shell size, equipment set, options that sit outside the standard list, and the commercial terms around delivery and commissioning. This article sets out the comparison points we suggest buyers work through, using the catalogue data published for this model as the reference.
Start with the footprint, not the marketing name
The catalog lists WS-PC07ST-L at 7490 × 2400 × 1470 mm. That length is what separates it from the shorter versions in the same family — the standard WS-PC07ST and the WS-PC07ST-S are recorded at 7000 mm long, with the same 2400 mm width and 1470 mm depth. The difference of roughly half a metre sits inside the swim lane, so it changes what the unit is good for: a longer lane suits lap swimming and resistance training, while the shorter shell frees up deck space in a tight villa terrace or resort courtyard.
Two site measurements matter more than they look. Depth of 1470 mm sets water volume, which drives heat-up time and running cost, and width of 2400 mm determines whether the unit fits your access route and your foundation. Confirm both against your own drawings before you commit to a location. The catalog figures describe the shell; they do not include steps, plant space or clearance for servicing.
Read the standard equipment line by line
The specification block published for WS-PC07ST-L shows one control system, one swim training system, one filter pump, six water jets, four LED lights and a total power figure of 6.55 kW. The features shown are water jets, LED lighting, ozone and the swim training system.
That is a modest jet count, and it tells you something about the intended use: this configuration is built around swimming and training first, with hydrotherapy as a secondary function. If your buyers or residents expect a massage-heavy spa experience, compare a higher-jet model in the range instead of adding jets later — jet layout is fixed into the shell.
One line deserves particular attention: the captured specification for this model does not list a water pump. Other models in the same family do show one. Treat that as an open item on your quotation, and ask in writing whether the pump is included in the configuration you are being quoted, or priced as an option.
| Comparison point | What the catalog shows for WS-PC07ST-L |
|---|---|
| Shell size | 7490 × 2400 × 1470 mm |
| Swim training system | 1 set |
| Water jets | 6 pcs |
| Filter pump | 1 pc |
| Water pump | Not listed in the captured specification — confirm on the quotation |
| LED lights | 4 |
| Total power | 6.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Decide the options early, not at order confirmation
The catalog lists control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps as options across this range. Availability and compatibility vary by model, so an option that exists somewhere in the family is not automatically available for WS-PC07ST-L.
Two of these are worth deciding early rather than at order confirmation. A heat pump changes the electrical load well beyond the 6.55 kW shown for the standard configuration, and insulation determines whether the unit can be used economically through a cool season. Steps affect access as installed. If the swim spa is going into a project with an electrical engineer already on site, send the confirmed equipment schedule to them before they size the supply — not after.
Compare within the range before you compare suppliers
The Swimming Pools and Swim Spas category covers a wide spread of sizes and equipment levels, which is useful when you are still deciding what the product should do. Within the PC07 family, WS-PC07ST-L is the longer variant; WS-PC07ST-S adds an automatic cover option at the shorter length; and the wider PC07A-T is recorded at 7000 × 3000 × 1470 mm with a substantially larger jet package, water pump included and a total power figure of 11.55 kW.
That comparison is the honest one to make: you are choosing between a longer training lane on a moderate electrical load and a wider, jet-heavy configuration that asks considerably more from the supply. Neither is better in the abstract — it depends on site conditions and how the end user intends to use the water.
Price the delivery and commissioning scope, not just the shell
A swim spa is delivered as a module that has to reach the property, be lifted into position and sit on a prepared base before any plant is commissioned. If you are sourcing it as part of a wider fit-out, SANTERSON works as a one-stop furniture and building materials supplier, covering design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover. Freight by sea, air and rail, customs paperwork and door-to-door delivery are part of that scope, alongside installation support and after-sales service.
Ask for the quotation in writing with three things stated clearly: which equipment is included in your configuration, what site preparation you are responsible for, and how faults are handled under warranty. Import terms, duties and transit times vary by destination and should be confirmed case by case rather than assumed from marketing material.
A short checklist before you order
- Confirm shell dimensions against your own foundation and access drawings, including clearance for servicing.
- Ask whether the water pump is included in this configuration or quoted separately.
- Get the total power figure for the exact specification you are buying, heat pump included if required.
- Verify which options — UV sterilization, sand filtration, insulation, steps, cover — are available for this model.
- Agree delivery scope, site preparation responsibilities and after-sales terms before payment.
Specification sheets answer most questions. The remaining ones — pump inclusion, option compatibility, electrical load with a heat pump — are settled in conversation. Send your drawings and required configuration to our team, and we will confirm what WS-PC07ST-L includes for your project before you commit.