A custom hinged door corner wardrobe looks simple on a drawing: two runs of cabinetry meeting at an angle, a row of doors, some hanging space inside. In production it is one of the less forgiving pieces of built-in joinery, because the corner itself, the door swing and the wall conditions all have to agree before a single panel is cut. Most rework on these units comes from questions that were never asked at the specification stage. Below is what we ask our own project teams to lock down before a custom hinged door corner wardrobe goes into production.

1. The measured opening, not the drawn plan

Custom corner units are built to the room, and rooms are rarely square. Before production we need field measurements taken at the site itself: the two wall runs that form the corner, the actual angle between them, floor level along both runs, ceiling height at several points, and the position of skirting, cornices, power points, switches, air-conditioning grilles and light fittings. A 90° assumption on a wall that measures 88° or 92° will show up as an uneven reveal along the whole return run.

Please also tell us which surfaces will be finished at handover, and what tolerance is allowed behind and beside the carcase. That determines whether we scribe the unit to the wall, build in a filler panel, or leave a shadow gap. Our L shaped corner wardrobes are made to measure for exactly this reason — the return length and depth are set from your site dimensions rather than chosen from a fixed size range.

2. Door layout, swing direction and clearance

Hinged doors need room to open. For each door we confirm the opening direction, which hand the hinges sit on, the order of doors along the run, and whether any door meets the corner return. Then we check what sits in front of it: the bed, an en-suite entry, a dressing bench, a doorway arc, or a chest of drawers left in place during the fit-out.

Where the room is tight, we say so at quotation stage and suggest either re-balancing door widths, moving the corner post, or switching to sliding door corner wardrobes. We would rather change the layout on paper than find the clash on site. If a full-height door at the corner will be opened daily, we also confirm the handle or pull detail and whether an optional handleless front is acceptable there.

3. How the corner is used inside

The corner bay is where storage plans usually fail, so we need it specified before production, not after. Confirm the internal layout run by run: hanging heights for short and long garments, shelf spacing, drawer banks, a valet rod, shoe or bag shelving, and whether the deep corner zone should be reachable with pull-out fittings or simply kept for seasonal items.

Tell us what actually lives in the wardrobe. A guest-room unit in a villa project has different contents from an owner's suite, and a serviced-apartment unit has different contents again. Internal layout is tailored per project, so we work from your storage brief and the occupant profile rather than assuming one standard fit-out for every bedroom.

4. Materials, finish and edge detail

Material and finish options are specified per project, and each choice has a knock-on effect on production. We confirm the board substrate and construction for the carcase and doors; the surface system, whether that is a laminate, lacquer, veneer or solid timber front; the colour or grain reference with a physical sample number rather than a screen colour; and the edge treatment on visible returns and around the corner post.

For projects that repeat the same wardrobe across several rooms, we also confirm which elements are held constant — door profile, handle specification, interior fitting finish — so the units read as one family even where room sizes differ. If your project pairs a corner unit with other built-ins, send us the matching reference from custom minimalist bedroom wardrobes or another finish sample, and we will match panel profile and surface to it.

5. Hardware specification

Hinges, handles, slides and stays are usually the items that get value-engineered late, which is exactly when they cause problems. Before production we confirm hinge type and load rating for the door height and weight, whether soft close is required on doors and drawers, drawer slide type and extension, and the fixing method into the chosen substrate. Where a project specifies a hardware brand, we work to that; where it does not, we propose a specification you can approve in writing.

We also confirm what you want supplied versus sourced locally. Hardware availability differs by destination country, and shipping certain items is rarely worth the freight. Agreeing this early keeps the delivery package clean and avoids a half-fitted unit waiting on locally bought hinges.

6. Interface with walls, floor and services

A corner wardrobe touches more of the building than most furniture. We confirm the wall build-up so fixings are correct for the substrate, whether the unit is freestanding off the finished floor or built into a recess, how it meets tiled or plastered surfaces, and how it passes any skirting or architrave. If lighting is intended inside the unit, we need the driver location, switching arrangement and cable route agreed before panels are drilled.

For multi-unit projects this matters more, not less. Send us the room-by-room schedule with the relevant elevations, and we will flag every clash we can see — a door hitting a light switch, a drawer fighting a radiator, a return run blocking a threshold — while it is still a drawing change.

7. Manufacture, delivery and fit-out sequence

Before we release production we confirm the order structure: quantities per room type, how units are separated for shipping, packaging standard, destination and delivery address, and who receives the goods. Corner wardrobes ship as panels and sub-assemblies, so the packing list has to match the on-site sequence of work.

Then we confirm the site programme: when wet trades and floor finishes are complete, when the room is dry and secure, who provides access and storage, and whether our installation guidance applies or your own fitters take the units. Our logistics and door-to-door delivery service covers freight arrangements and documentation to the agreed destination, and installation and after-sales support is available where the project requires it. What we will not do is promise a lead time or an installer availability that has not been confirmed for your specific delivery.

8. Approvals before the first panel is cut

The last item on our list is the approval trail itself: who signs off the shop drawings, who approves the finish sample, and by when. We produce detailed drawings from your site dimensions for your review, and production starts once those drawings and the selected finishes are confirmed in writing. Any change after that point is treated as a variation, because it usually means panels already cut.

If you would like us to look at your bedroom elevations and tell you what is missing before you commit to a corner design, send the drawings and room dimensions through our contact page. As a one-stop furniture and building materials supplier, we can build the corner wardrobe to your opening and coordinate it with the rest of the joinery package in the same production run.