A linen cabinet looks simple on a floor plan: a tall box with shelves, standing in a hallway or beside the bathroom. It is often the item specified last and regretted most, because it has to hold bath linens, cleaning supplies, spare toilet paper and toiletries while staying aligned with the joinery around it. The checklist below follows the order we work through when linen cabinets are made to measure for villa and apartment projects, so each line can be ticked off before a drawing is released for production.

1. The measurements that decide the layout

Before choosing a style, record the shell dimensions in writing: clear width between finished wall faces, floor to ceiling height, and the depth available once skirting, door architraves and any pipework are accounted for. A cabinet ordered to a rough opening is the most common cause of site problems, because reveal gaps cannot be trimmed away on site without exposing the carcass edge.

Then note what obstructs the door swing: the bathroom door, a hallway turn, a vanity drawer that pulls out. A hinged door needs clearance in front of it; a sliding or pocket arrangement does not. Record which wall the cabinet sits on and whether the neighbouring finish is tile, plaster or panelling, because that determines how the unit is fixed and packed out.

2. What actually goes inside

List the inventory before you list the shelves. Bath towels in three sizes, hand towels, bath mats, spare bed linen, toilet paper stock, detergents, a laundry basket or hamper, hair tools, first-aid items, and anything that must be kept out of reach of children. That list converts directly into shelf heights and drawer positions.

  • Towels stack best on shelves spaced for folded stacks rather than one tall open zone.
  • Bulky items such as spare duvet covers want the upper zone, where reach does not matter.
  • Detergents and sprays are better in a lower cupboard, below counter height and away from linen.
  • Small items disappear unless there are drawers or shallow trays; deep shelves need boxes to stay usable.

Where the cabinet also carries laundry, pull out laundry hampers or a dedicated hamper column keep soiled linen out of an open hallway. If the unit is expected to house a washer or dryer, that decision changes the carcass, the services and the ventilation, and belongs in the first drawing rather than as a site variation.

3. Adjustable versus fixed shelving

Fixed shelves are cheaper to produce and look cleaner, but they lock you into one assumption about what you store. Adjustable shelving on pitch-drilled or hidden-bracket systems lets the layout change with the household or, in a hotel, with the housekeeping stock list. A practical compromise is a mix: fixed shelves where the contents are known and stable, adjustable in the middle zone where stock sizes vary.

Ask for the shelf pitch to be stated on the drawing, along with the load each shelf carries. A shelf holding folded towels all day behaves differently from one carrying a stack of ceramic or glass items, and the span between supports should reflect that rather than a default grid.

4. Materials and finish for a damp room

A linen cabinet in or beside a bathroom sees humidity, steam and occasional splashes. Specify the board, the edge treatment and the door face by name on the order, and confirm with the manufacturer which components are suitable for bathroom conditions; moisture performance should be stated for the configuration you select rather than assumed. Edge banding quality matters more than most buyers expect: unsealed edges at the bottom rail and side panels are where swelling starts.

Keep the finish consistent with adjacent joinery. Where a project already uses floating vanities or wardrobes in the same corridor, order the linen cabinet to the same door profile, handle type and surface so the three read as one set rather than separate purchases. If the cabinet is built into a wall system, full height storage walls give you a flush, ceiling-to-floor carcass that hides the packing out at the top.

5. Hardware and door type

Hardware is where budget cabinets fail first. Specify hinges with soft close if the door opens into a bedroom corridor, drawer slides rated for the intended load, and handles that suit the traffic — a handleless groove reads cleanly but needs enough finger clearance to work when the cabinet is full.

Choose the door type against the plan, not the brochure. Hinged doors give full access and need swing clearance. Sliding doors suit narrow hallways. Glass-front tall cabinets display stock and make a dark hallway feel lighter, but they show everything inside, so they work best where the contents are tidy by design — see glass front tall cabinets for that arrangement.

6. Ventilation, services and lighting

Linen stores damp towels on occasion. Ask whether the doors or plinth carry ventilation, and whether the room has extraction, so stored linen does not hold moisture. If the cabinet houses an appliance, confirm the appliance dimensions, clearances, ventilation route and electrical point before the carcass is made — integrated appliance tall cabinets are built around those numbers.

Interior lighting turns a deep cabinet into something usable at night. Specify the fitting, the switch or sensor type and where the transformer sits, since all of that has to be accessible for maintenance. Integrated cabinet lighting can be wired into the joinery design at drawing stage, which avoids the cost and patching of retrofitting surface fittings later.

7. Fixing, levelling and site interface

Record how the unit will be fixed to the wall, what packing is needed for out-of-plumb walls, and who prepares the floor and wall before installation. Tall units depend on a stable, level base; a cabinet packed unevenly at the plinth can bind its doors over time. Confirm whether the top is finished or trimmed on site, and how it meets the ceiling line.

Agree the interface trades too: who supplies and installs skirting removal, tile edge, architrave, paint touch-in and silicone. On a project this is usually the point where responsibility gets unclear, so put it in the order.

8. Documentation to request before ordering

  • A dimensioned elevation showing door swing, shelf positions and handle positions.
  • A materials schedule naming board, edge, door face and finish for each component.
  • Hardware schedule with hinge, slide and handle types stated.
  • Services drawing if lighting or an appliance is involved.
  • The confirmed final dimensions, signed off against the site survey rather than the drawing.

9. Delivery and after installation

For units shipped internationally, confirm packaging, carton marking and how panels are identified on site, plus what happens if a panel arrives damaged. Freight and door-to-door delivery are handled as part of project procurement, so the cabinet can arrive with the rest of the joinery rather than as a separate consignment that nobody expects.

Finally, keep the specification sheet. Shelf positions, hardware model numbers and finish codes matter when you add a matching unit years later or need a replacement door.

The short version

A complete linen cabinet checklist covers measured openings, an inventory-led interior, adjustable shelving where contents change, materials named for damp-room use, hardware and door type chosen from the plan, ventilation and services resolved before manufacture, a fixing method agreed with site trades, and a signed dimension sheet before production starts. Work through those nine items and the cabinet stops being an afterthought.

SANTERSON manufactures made-to-measure linen cabinets as part of the Tall Cabinets range, alongside open shelf tall cabinets and utility tall cabinets for bathroom and hallway storage in villa, apartment and hotel projects. Send over the dimensions and inventory list, and a layout, materials schedule and quotation can be prepared for review.

Dimensions, materials, finishes and hardware are specified per project; confirm the selected configuration and site measurements before ordering.