A mirror sliding door wardrobe rarely decides a commercial project on its own. It sits inside a much larger package of built-in joinery, and the problems it causes — a door that will not clear a skirting board, a mirrored panel that arrives in the wrong split, a finish that does not match the rest of the cabinetry — are almost always decided at proposal stage, not on site. If you are a developer, builder, interior consultant or procurement lead comparing quotations for apartment, serviced-apartment, hotel guest-room or villa schemes, this is what a serious proposal should answer before you sign it.

1. Does the proposal treat the wardrobe as made-to-measure joinery, or as a catalogue item?

Our Mirror Sliding Door Wardrobes are made-to-measure: sizing, material and finish options, and the internal layout are all specified to suit each space and project. That distinction matters commercially. A quotation that lists a wardrobe as a fixed SKU with a nominal width is telling you the tolerance for site deviation sits with you. A quotation that states overall height, width and depth per unit type, plus how those figures were taken, tells you the fabricator carries the fit.

Ask which of the two you are being quoted, and ask for the dimension sheet to be attached to the price rather than "confirmed later". Later confirmation is where variation orders are born.

2. Is the sliding system specified, or just the door face?

Mirror panels are heavy, and in a commercial setting the doors cycle far more often than in a private home — housekeeping, guests, turnover between tenancies. A proposal that names only the door finish has not described the product. It should state the track and hanger arrangement, how the panels are suspended, whether the bottom guide is recessed or surface-mounted, and what happens when one panel needs to come out for service. Where the wardrobe fronts onto a corridor, also confirm the overlap between panels so no gap opens at the closing stile.

If the same project uses sliding doors elsewhere — room dividers, bathroom entries, closet fronts in a Glass Sliding Doors application — request that the openings be quoted on one consistent track family. Mixed hardware across one building means mixed spare parts and mixed maintenance instructions for the operator.

3. How is the mirror specified and protected?

This is where most quotations go thin. A line item reading "mirror glass" cannot be compared against a competitor's. Push for the following to appear in writing:

  • Glass thickness and whether the mirror is applied to a substrate panel or used as a structural door leaf.
  • Safety treatment — laminated backing or a safety film — for any glazed element in a guest-occupied room. Confirm what the supplier can provide and let your certifier check it against the project's own requirements.
  • Edge finish and whether edges are polished, seamed or boxed, since an unprotected edge is where silvering first fails.
  • Panel split. Mirror panels that must travel on a track cannot always be delivered at full design width; the supplier should show you the joint positions on elevation drawings before production.

Where a mirrored look is wanted but a full mirror leaf is not appropriate for the traffic, ask about alternatives in the same collection. Glass Sliding Door Wardrobes cover bronze, smoked and frosted glass fronts with aluminium frames, and Mirrored Hinged Wardrobes solve rooms where a sliding track conflicts with the ceiling line or a bed headboard. A supplier who offers only one answer to your problem is not evaluating it.

4. Does the finish sit inside the project's wider joinery schedule?

On apartment and hospitality schemes, wardrobes are rarely alone. Kitchen cabinetry, vanities, media walls, tall storage units and door linings usually come from the same trade package, and a mirror wardrobe carcass that does not match the corridor joinery is visible for the life of the building. A proposal worth accepting states the carcass board, the door substrate, the surface material — melamine, lacquer, acrylic, veneer — and the edge treatment, and confirms those materials are available across the rest of the fit-out.

SANTERSON is a China-based furniture and building materials manufacturer supplying built-in furniture, interior fixtures and finishes as one package, which is why we can hold carcass and finish consistency across wardrobes, custom built-in kitchen cabinets and wall paneling rather than reconciling three unrelated factories.

5. What does the proposal say about sampling and approval?

Before bulk production, a commercial-grade proposal should include a sample or mock-up stage: a door corner or full panel showing glass tone, frame colour, handle detail and carcass edge, signed off against a drawing number. Ask how many approval rounds are included and what happens if the client changes a finish after sign-off. Written change-control terms are worth more than any verbal assurance.

6. Delivery, packaging and site sequence

Glazed and mirrored panels travel badly when they are packed like case goods. Ask specifically how mirror leaves are crated — vertical or horizontal racking, edge protection, glazing tape, and whether the crates are labelled by room number against your room schedule. For projects outside China, our logistics service covers freight forwarding by sea, air and rail, customs paperwork, container loading plans and door-to-door delivery; import terms, duties and Incoterms are agreed per project rather than assumed.

Also confirm the sequence: a wardrobe delivered before the floor finish is laid, or before the ceiling grid is set, becomes a storage problem on site for weeks. A supplier who has run multi-unit deliveries will ask about your programme unprompted.

7. Installation and after-handover support

Sliding doors need adjustment after the building moves — tracks settle, floors get grouted, carpets get laid. Check whether the proposal includes installation or on-site guidance, an inspection and snag list at handover, and how replacement panels, hangers or guides are ordered later. Mirror panels cannot be trimmed on site, so a clear spare-part route protects the operator for years.

A quick comparison sheet before you decide

Item to checkWeak proposalProposal you can award
DimensionsStandard widths, "site verify"Per-unit dimension sheet attached to price
Sliding hardwareNot namedTrack, hanger and guide specified; one family across the building
Mirror build-up"Mirror glass"Thickness, safety treatment, edge finish, panel split on elevation
FinishesPhoto reference onlyBoard, substrate, surface and edge stated; matches wider joinery
ApprovalColour chip by emailSample against a drawing number, with change-control terms
LogisticsFOB price, packing unspecifiedGlazing crates, room-number labelling, loading plan, agreed Incoterms
AftercareSilentSnag inspection and a stated spare-parts route
Working note: figures such as factory area, export share, response times and warranty terms appear inconsistently across some supplier websites, ours included. Do not accept them from marketing copy. Ask the supplier to confirm current numbers in the quotation itself, and have your own certifier check any glazing or fire requirement against the project's jurisdiction.

If you want a mirror sliding door wardrobe quotation assessed against these points — or a package covering wardrobes, cabinetry and interior fixtures for a single project — send us the room schedule and elevations and we will price it as made-to-measure joinery. Enquiries reach our team through the contact page, and we reply with a specification-led proposal rather than a catalogue price list.