A submittal package is where a swim spa specification stops being a brochure line and becomes something a consultant, contractor and client can all sign off on. For the Outdoor Swim Spa WS-S06, that means going well beyond a model number and a photograph. Below is the checklist we work to when a villa, resort or private residence project asks us for a submittal on this model, so you can compare it against whatever you receive from any supplier.
1. The exact model variant, not just the series name
The S06 family covers several variants — WS-S06, WS-S06B, WS-S06C, WS-S06CT, WS-S06M and more — and they are not interchangeable. The catalog entry for WS-S06 lists a shell of 5820 × 2220 × 1110 mm; the WS-S06B is recorded at 5800 × 2200 × 1250 mm, which changes both the footprint and the water depth. A submittal that names only "S06 series" cannot be checked against a foundation drawing or a pool-deck layout. Insist that the document states the full model code and the dimensions for that specific code.
2. Equipment schedule with quantities
A useful submittal lists what is actually in the cabinet and the shell, item by item, with counts rather than adjectives. For WS-S06 as catalogued, that reads: one control system, two water pumps, one filter pump, 56 jets in total, two LED lights plus 18 small LED lights, and a listed total power of 6.35 kW. Features shown for this configuration are water jets, LED lighting, ozone, a waterfall and four water columns.
Two cautions apply. First, the specification is not repeated across the family: WS-S06B shows three water pumps, 48 jets and 13.35 kW with a waterfall but no water columns; WS-S06C drops to 33 jets at 9.95 kW and adds a temperature setting instead; WS-S06CT lists a swim training system where WS-S06 does not. Second, if your programme assumes counter-current swimming, that has to be settled in writing for the exact code before order placement, not discovered on site.
3. Electrical and utility interface information
This is the section most often missing from thin submittals. Total power alone does not let an electrical contractor design the circuit. Ask for supply voltage and phase, the recommended protective device and residual-current arrangement, cable entry location, and how the control system is to be isolated. On the water side, confirm drainage provision, the fill arrangement and where the filter pump sits relative to the plant access point. The catalog note on this range is explicit: included equipment and electrical requirements must be confirmed for the selected configuration.
4. Site, access and installation data
A swim spa arrives as a large fabricated shell, so the submittal should cover what the site team has to do before it lands: the bearing surface and slab arrangement, clear access route and lifting or crane requirements, working space for future pump and filter servicing, and steps or entry detail. Steps are one of the catalog-listed options for this range, alongside insulation, heat pumps, UV sterilisation, sand filtration and additional water pumps — but availability and compatibility vary by model, so each option you want should appear as a named line in the submittal with a confirmation that it applies to the chosen code.
5. Options and their effect on the base specification
Adding a heat pump changes the electrical load; adding sand filtration changes the plant footprint and the servicing envelope; UV sterilisation adds its own supply point. A submittal that lists options as a menu without restating the revised totals leaves the engineer to guess. Ask for the specification after options, not before.
6. Commercial scope, packaging and after-sales terms
The remaining pages of a complete package are commercial: what is included in the price and what is not, packing and container-loading detail, freight mode and delivery point, spare-parts availability, warranty wording with its exclusions, and who carries out installation and commissioning. As a one-stop furniture and building materials supplier, we handle swim spas inside the same workflow we use for the rest of a project — design consultation, production and quality control, logistics to the delivery point, then installation support and after-sales — so the submittal doubles as the coordination document for the wider package.
7. Drawings and visual references
Attach dimensioned drawings showing plan, section and the position of pumps, jets, water columns and the waterfall; the standard product photography; and, where the project involves several villas or a resort block, a schedule listing each unit by model code and location. These are the items reviewers mark up in red if they are absent.
How we prepare this package
Send us the model code you are specifying, the site condition (terrace, garden, pool deck or indoors) and your target delivery point, and we will return a submittal covering the points above for that configuration. If you are still weighing models, the swimming pool category lists the full outdoor swim spa range with catalogued dimensions, so you can shortlist on footprint first.
For a submittal on WS-S06 or any other model in the range, contact SANTERSON — enquiries are handled by PHILLIP at santerson@qq.com or by phone/WhatsApp on +86-13928214007.