A single wardrobe order rarely travels alone. On a villa or apartment project the joinery package usually carries wardrobes, vanity units, kitchen cabinets and sometimes doors and wall panelling in the same container run — which is exactly where an international delivery plan earns its keep. Below is how we sequence a made-to-measure order of Freestanding Open Wardrobes from our factory floor to the site, and what your team needs to have settled at each stage.

Start with the room, not the catalogue

Freestanding open wardrobes stand independently rather than being built into a recess, so nothing on site is holding them square for you. That freedom is also the reason dimensions have to be nailed down early: overall width, height, depth, bay count and internal layout are all specified per project rather than picked from a fixed size chart. Our Open Wardrobes line is made-to-measure, with material, finish and layout set against the drawings you approve.

Before anything goes into production we confirm three items in writing:

  • Dimensioned elevations for every wardrobe run, including skirting, cornice and any ceiling-level constraint
  • The finish sample you have signed off — veneer, lacquer, melamine or metal frame — matched to the rest of the joinery package
  • Internal configuration: hanging bays, shelves, drawers, mirror or glass inserts, and integrated lighting provisions where required

Where a project mixes open wardrobes with closed-front systems — Metal Frame Open Wardrobes in a dressing room, hinged or sliding-door units along a bedroom wall — we produce them together so the carcass construction, edge treatment and hardware batch stay consistent across the whole floor.

Consolidating joinery into one shipment

Wardrobes are heavy, bulky and awkward to top up in small quantities later. For that reason most of our residential clients consolidate their built-in furniture package — wardrobes, vanities, sideboards, kitchen cabinets — into a coordinated container plan instead of shipping each trade separately. One consolidated shipment means fewer handling operations where panels get damaged, matched finish batches across the joinery, and one delivery window for the trades on site rather than five.

StageWhat we handleWhat your team confirms
ProductionManufacturing to approved drawings, finish sign-off, pre-assembly checks and quality control before packingFinal shop drawings, finish codes, delivery sequence per room or unit
PackingPanel-level protection, corner guarding, labelled crates matched to the room schedule, container loading planCrate labelling convention your site team reads on arrival
FreightSea, air or rail forwarding, commercial invoice, packing list, certificate of origin and the customs paperwork for the destinationIncoterms, port of discharge, importer of record, any permit needed locally
DeliveryDoor-to-door delivery to site or to your storage facility, shipment tracking through the transitAccess for the truck, unloading labour and lifting equipment
InstallationOn-site installation support, snag inspection with your site team, spare parts and replacement supply afterwardsSite readiness: flooring, skirting and wall finishes complete before the wardrobes go in

We provide logistics and door-to-door delivery as part of the order, so your project manager deals with one coordinator from production through to handover rather than chasing a forwarder, a customs broker and three factories.

Sequencing the order against your site programme

The most expensive mistake on a joinery order is measuring too early. Wardrobes should be dimensioned after flooring, wall finishes and skirting are resolved, otherwise the openings you measured no longer exist by the time the panels arrive. Where the building is still in wet trade, we work from design-stage drawings for layout and finish approval, then hold final dimensional sign-off until the site is ready.

A practical order of work looks like this:

  • Design stage — layout, finish direction and internal configuration agreed; indicative quotation issued
  • Detail stage — shop drawings, hardware schedule and finish samples confirmed and signed
  • Production and QC — panels made, finished and checked against the approved drawings
  • Packing and freight — crates labelled to room, container plan fixed, documents issued with the shipment
  • Site delivery and installation — delivery booked into a clear window, installation and snag inspection completed
Transit time, duties and import requirements differ by destination and change with carrier schedules. We confirm Incoterms, insurance and the paperwork set for your specific port before production starts, so nothing sits in customs waiting on a document that could have been issued earlier.

Multi-unit projects: order by unit, deliver by floor

Apartment schemes and villa developments rarely hand over all units at once. We split a single wardrobe order into release batches — one crate set per unit type, staged for the floors your builder is finishing first — while keeping the whole order on one production run so colour and grain stay matched across every unit. For developers repeating a bedroom layout, we fix an approved reference specification and reproduce it unit by unit, with variation only where a plan changes.

If your project needs finishes beyond what we list — a specific veneer, a colour-matched lacquer, a private-label package for another brand — our custom and OEM service covers bespoke material, texture and branding work from prototyping through to production.

Send us the drawings for your wardrobe package and we will quote the whole joinery order as one shipment, with delivery planned into your site programme.

Contact PHILLIP · Phone / WhatsApp +86-13928214007 · Email santerson@qq.com · Contact page