A white acrylic wardrobe looks simple on a drawing: a bright, flat-fronted box that reflects light and makes a bedroom or guest room feel larger. That simplicity is exactly where procurement goes wrong. Because the fronts read as one continuous surface, any shortage, mismatched batch or late door hardware shows immediately once the casework is installed. This guide covers how to count what you need for White Acrylic Wardrobes and how to coordinate the products around them so one order, one shipment and one installation window cover the whole job.

Start from elevations, not floor area

Wardrobe quantities are counted per linear metre of wall and per elevation, never per square metre of room. Before any enquiry goes out, mark up each bedroom elevation with the following:

  • Finished width and finished height of every run, including skirting, cornice and any recess you intend to scribe into.
  • Floor-to-ceiling variation along the run. Long villa walls are rarely level end to end, and a made-to-measure carcass only fits if the site survey reports the low point and the high point.
  • Obstructions: switch plates, air registers, curtain boxes, radiator tails, door architraves that swing across the front of the case.
  • Clearance in front of each opening type. Sliding doors need track depth and no furniture in their path; hinged doors need the arc kept clear; pocket and sliding panel systems need a wall cavity or an overlap face.
  • Which elevations are single-sided and which continue around a corner, because return runs change both the carcass sequence and the delivery order.

SANTERSON wardrobes in this family are made to measure, with layout, material and finish specified per project, so the drawing set is the order. Send the same marked-up elevations you would send a local joiner: room number, elevation letter, dimensions, and door type.

How to build the quantity list

Work in three layers so nothing is ordered twice or missed. First the casework itself: one line per wardrobe, keyed to a room number, with width, height, depth and door type. Second the internal configuration, listed per wardrobe rather than as one blanket instruction across the job. Third the coordination items that sit outside the wardrobe but must arrive with it.

LayerWhat you recordCommon error to avoid
CaseworkRoom reference, elevation, overall width / height / depth, door type (hinged, sliding, pocket, corner), number of carcass modules per runOrdering a nominal width instead of the surveyed opening, then scribing on site with material nobody supplied
Internal configurationHanging length versus shelf stack per wardrobe, drawer bank positions, tall-bay or corner fittings, lighting provision in deep baysApplying one interior template to every room when guest rooms and master bedrooms store differently
Coordination itemsMirror or glass fronted units in the same finish family, matching vanity or tall cabinet, wall panelling and doors that meet the case, flooring build-up levelsSpecifying fronts in one batch and the adjoining panels from another supplier with no shared finish reference

For a bedroom group, count wardrobe runs by type before you count rooms. A typical villa package mixes full-height hinged runs, sliding runs where the bed encroaches on the swing arc, and one corner or walk-in arrangement. Each type has its own module logic and its own hardware, so mixing them into one line item makes comparison impossible.

Keep the finish consistent across every piece you order

White is not one colour. The visible risk with a bright, flat-fronted built-in wardrobe is that fronts from different batches or different product families sit side by side under the same lighting and read as two shades. Control this at specification stage:

  • Name one finish reference per elevation, and keep it on every drawing, quotation and packing list for that elevation.
  • Order adjoining casework in the same run: wardrobe fronts together with any matching tall cabinet, mirror cabinet or acrylic cabinet that shares a sightline.
  • Decide the sheen before the colour. A high-gloss front and a matte front in the same white are different products; the Matte Acrylic Wardrobes range and the gloss ranges are specified separately for a reason.
  • Record which surfaces are seen at grazing light. Long flat fronts reveal wall imperfections, so note scribing, pack-out and shadow-gap details on the drawing rather than leaving them to the fitter.
  • If part of the elevation is glass rather than a solid front (clear, frosted or bronze-tinted glazed doors in an aluminium frame), specify glazing type and frame finish per opening, not as a general note.
Practical rule: one finish reference, one order batch, one shipment for every set of fronts that can be seen at the same time. Splitting a single bedroom elevation across two production batches is the most common cause of visible shading.

Coordinate the surrounding products in the same order

Wardrobes rarely fail on their own; they fail where they meet something else. Grouping related items into one purchase shortens the site programme and keeps details consistent.

  • Flooring first. Engineered wood or parquet build-up height determines where a wardrobe sits and whether the front clears the floor. Fix flooring levels before casework dimensions are frozen.
  • Wall finishes and panelling. Where a case meets panelling, niche panelling or a decorative wall system, agree which is installed first and who supplies the trim.
  • Doors in the same room. Hinged, sliding, pocket and flush doors share reveals and architrave details with the casework. Ordering them from the same source keeps reveal widths identical.
  • Bathroom joinery on the same floor. Vanities, mirror cabinets and tall bathroom cabinets in a matching finish family are usually specified at the same time as bedroom casework; keep their hardware and edge details aligned.
  • Lighting. Recessed or integrated lighting inside deep bays needs cable provision during manufacture, so decide it on the drawing rather than retro-fitting after installation.

Sequence delivery to match the installation order

Casework should arrive after the wet trades, flooring levels and first-fix electrical are complete. When ordering a whole-bedroom package for an overseas project, ask for packing lists keyed to room numbers so the crew on site can find each run without opening every crate, and confirm the unloading route and lift capacity for full-height panels. Santerson's stated scope covers design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then installation and handover, with freight by sea, air or rail plus customs paperwork and door-to-door delivery, so the delivery sequence is something to agree in writing rather than assume.

Before you confirm an order: every elevation dimensioned from a site survey, one finish reference per sightline, interiors listed room by room, adjoining flooring / wall / door items named, and packing keyed to room numbers. Those five checks remove most of the rework that appears after installation begins.

Send a complete enquiry

A quotation you can compare is built from the same information you used to plan quantities: marked-up elevations with surveyed dimensions, a room-by-room schedule of door types and internal configurations, the finish reference for each sightline, and the coordination items you want quoted in the same batch. Santerson has operated since 2008 as a China-based manufacturer and one-stop supplier of furniture and building materials, working on villa, hospitality and office projects with custom and OEM capability, so send the full package once and the returned quotation covers casework, finishes and adjoining products together.

Share your drawings and room schedule with our team to receive a specification and quotation for made-to-measure white acrylic wardrobes and the casework around them.