A swim spa is easy to specify and easy to forget. On a villa or resort package it usually arrives later than the furniture, sometimes after the paving, the pergola and the pool deck have already been fixed. The result is a last-minute scramble over crane access, electrical supply and drainage. This note walks through how we place the Outdoor Swim Spa WS-130BⅤ inside a complete materials schedule, so the shell, the water systems and the surrounding finishes all land on site in the right order.
Why the swim spa belongs in the main schedule, not in an addendum
Most project schedules are organised by trade: cabinetry, flooring, sanitary fixtures, lighting, outdoor furniture. Long-lead items sit at the top of that list, and a swim spa is one of them, because it is simultaneously a structure, a water appliance and an electrical load. When it is treated as an accessory bought after the main package is signed, three things go wrong at once. The slab or plinth gets poured to the wrong dimensions. The distribution board is sized for a smaller load. The paving line and the coping detail are set before anyone knows where the spa edge will sit.
We supply swim spas alongside the rest of the package, which means one coordination file covers the spa, the outdoor furniture around it, the shade structure overhead and the interior fixtures in the adjoining rooms. That single schedule is what keeps a project moving.
Start with the footprint, then work outward
The WS-130BⅤ is catalogued at 9950 × 3000 × 1430 mm. Treat that figure as the starting point for setting-out, and confirm the exact dimensions of the selected configuration against the drawing you issue to the site team. From that footprint you can fix:
- the clear opening needed for delivery, including turning space at the gate or side passage;
- the position of the plant and access panel, so maintenance is possible without lifting paving;
- the width of the surround, which determines whether loungers can pass each other;
- the relationship between the spa edge, the coping and any adjacent planter or step.
We list the swim spa range with dimensions on each product page so you can compare footprints against your layout before the specification is frozen. Where a plan calls for a different shape or footprint, we also produce customized-shape outdoor spas, which changes the setting-out drawing rather than the coordination method.
Log the services line items separately
The spa itself is one row. The equipment that makes it work should be listed as separate rows, each with its own owner and its own confirmation date. For the WS-130BⅤ, the catalogued specification covers a control system, a swim training system, a water pump, a filter pump, twenty jets and seven LED lights, with a total power figure of 10.85 kW. Read that as a checklist for your engineer, not as an order: options such as heat pumps, UV sterilisation, sand filtration, insulation and steps are configured per project, so the equipment list you sign off must match the configuration you buy.
| Schedule row | Who confirms it | Needed before |
|---|---|---|
| Spa shell and footprint | Supplier / architect | Slab and plinth setting-out |
| Electrical load and protection | Electrical engineer | Distribution board schedule |
| Drain, overflow and priming | Plumbing contractor | Underground works |
| Access panel and clearances | Supplier / site team | Paving layout |
| Delivery route and lifting | Logistics / site team | Boundary and gate works |
Sequence the delivery against the surrounding package
A spa that arrives before the deck is built sits on the lawn for three months. One that arrives after the paving is laid cannot get to the plinth. In our door-to-door deliveries we schedule the spa with the hard landscape and the poolside furniture in mind, so the shell goes onto its prepared base and the surrounding items follow behind it. The motorized louvered aluminum pergola is a good example of an item that must be coordinated with the spa rather than placed beside it: post bases, footing depths and the shade line all depend on where the spa edge ends up.
The same logic applies indoors. Where the spa adjoins a changing room or a bathroom wing, the sanitary ware, vanity lighting and wall finishes are drawn from the same schedule, so one late decision does not leave two trades standing around.
Specify once, procure once
Sourcing a spa from one supplier and everything around it from four others multiplies the number of drawings to reconcile. We have been manufacturing furniture and building materials since 2008, and our one-stop solution covers design consultation, material selection, production, project management and site coordination through to handover. For a swim spa package that means one set of shop drawings covering the shell, the finishes around it and the joinery in the rooms that open onto the deck.
Send us the drawing set early and we will mark up the spa footprint, the equipment rows and the delivery window against your existing schedule. That is usually where the savings are made — not on the unit price, but on the number of site variations after the slab is poured.
Talk to our project team about swim spa coordination for your package: contact SANTERSON.