A tall unit tucked into the corner of a bathroom, laundry or hallway looks simple on a drawing — one vertical element among twenty. The trouble starts when that same elevation has to carry storage, an appliance recess, a door swing and a finish that matches the vanity beside it. Here is what we need from your design brief in order to turn it into a workable quotation for Santerson Corner Tall Cabinets, part of our Tall Cabinets collection, and what comes back to you at each step.

Start with the corner, not the cabinet

Corner units go wrong for two reasons: the dimensions came off a finished plan rather than from site, or the elements next to the unit were never declared. Mark up the elevation with four things before you send anything.

  • The corner type. A square internal corner, an angled bay, or a return that runs into a doorway — each changes how the carcass is built and how the door opens.
  • Cleared height. Give floor-to-ceiling height and note any bulkhead, soffit, piped chase or light fitting cutting into the run.
  • Obstructions on both legs. Skirting, door handles, towel rails and switch plates decide whether a door can swing or has to slide.
  • The finish reference. Name the vanity, wardrobe or kitchen cabinet the unit must match, and give the panel colour or surface name rather than a photograph alone.

A 3D model or marked-up plan is ideal. Site measurements work just as well, provided they are taken after wall finishes are in place and at three heights per wall — older buildings are rarely plumb.

What the enquiry needs to answer

Our tall cabinets are made to measure, with material and finish options and a layout set to the project. That flexibility means an enquiry can be priced properly as soon as it covers the items below. You do not have to answer all of them at once; in practice, working down the list is enough for a first price.

ItemWhat to send
Location and quantityWhich room or apartment type, and how many identical units across the project.
Opening dimensionsWidth of each leg, depth and finished height, plus whether the unit sits recessed or proud of the wall.
Interior layoutAdjustable shelves, drawers, hanging rail, hamper, open niches, or an appliance bay with its ventilation gap.
Door and accessHinged, sliding or open; which side the hinge sits on; and whether the open door has to clear a handle or fitting.
Panel and finishBoard type, surface finish, edge treatment and hardware style, matched to adjoining joinery where relevant.
Delivery and install scopePort of destination or site address, and whether freight and on-site installation should be included.

Anything you can attach — a marked elevation, a room photo, the appliance datasheet — removes one round of questions from the quotation.

Pick the configuration before you ask for a price

A corner tall unit is rarely a single product. Most projects quote a combination, and that mix decides both cost and build sequence. Buyers usually start from these pages:

A common villa bathroom or laundry pairing puts the corner carcass on the junction, an appliance bay down one leg and utility storage down the other, finished with open niches at eye level. Across apartment repeats the same layout is drawn once and produced for every unit, which is where specifying it carefully the first time pays for itself.

What we send back, and in what order

Our cooperation steps are fixed: project brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. For a corner tall cabinet that runs like this.

  1. Brief review. We read your dimensions and layout against the room and flag anything that will not build or will not clear an obstruction.
  2. Design proposal. You get a marked elevation and interior layout showing shelf positions, door direction and any appliance recess, so errors surface on paper rather than on site.
  3. Quotation and detail confirmation. Price follows the confirmed configuration. Sign-off here covers dimensions, finish and hardware — the three items that cause rework if they move afterwards.
  4. Production and quality control. The unit is built to the signed drawings in our own factory, alongside the other joinery on the project.
  5. Logistics and delivery. Freight by sea, air or rail with customs paperwork handled, packaging set up for cabinet work, and door-to-door delivery where you have asked for it.
  6. Installation and after-sales. On-site installation and inspection, with spare parts and replacement support under the warranty terms we confirm in writing for your project.

Because we make furniture and building materials under one roof, the corner unit does not have to be specified in isolation. Where it sits against a vanity, a wardrobe run or kitchen cabinets, we draw them as a single elevation so panel lines, skirting returns and hardware actually line up. That is the practical difference between buying a cabinet and fitting out a room.

Six things that slow a quotation down

  • Measurements lifted from the architect's plan. Plan dimensions rarely account for plasterboard, tiles or screed. Send site figures.
  • An appliance chosen after the cabinet is drawn. Give us the model number and its clearance requirements with the brief.
  • A finish named only by photograph. Colour reads differently on every screen; send the panel name or a sample reference.
  • No decision on door direction. Left-hand and right-hand hinges change the carcass, not just the ironmongery.
  • Unstated site constraints. Lift sizes, stair widths and restricted delivery hours all affect how the unit is built and packed.
  • Waiting for a perfect drawing. Send what you have. A rough brief with real dimensions moves faster than a polished one without them.

Ready to send the brief?

Send the corner dimensions, the internal layout you want, and the finish the unit must match. We will come back with a marked elevation and a quotation against that configuration, and say plainly where a change would be cheaper or more practical on site. If your project needs the corner unit alongside vanities, wardrobes or kitchen cabinets, include those elevations as well and we will draw the whole run together.

Send your tall cabinet enquiry through our contact page, or look through the wider Built-in Furniture range first.