A two-tone kitchen looks finished on the render and unfinished on site if the split between the two colours was never written down. Before a two tone European cabinet package enters production, procurement teams should record where each colour starts and stops, which finish sits on which panel, and how the same combination repeats across every unit in the building. The documentation below is the list we work from on villa, apartment and boutique hotel kitchens.
1. The split line, drawn on elevation
"Two tone" describes two door colours in one run of cabinetry — it does not say where they change. Send the factory an elevation for every wall that marks the transition in millimetres: which bay carries the darker doors, where the tall housing switches tone, whether upper cabinets repeat the lower colour or invert it. A written note such as "dark from the tall larder to the corner unit" is read differently by three different workshops. On a flat panel European cabinet run with no moulding to break the surface, an undocumented split shows up immediately once the doors are hung.
2. Finish and sheen for each colour, stated separately
Specify each of the two colours on its own line: panel material, surface finish, sheen and colour reference. A wood-grain door paired with a solid panel reads very differently in two tone veneer cabinets than in two tone matte cabinets, and both behave differently from a reflective surface, where light, fingerprints and the room's window wall all change what the colour looks like. When the same two colours appear across kitchens, wardrobes and vanities in one project, list them once in a finishes schedule and reference that schedule on every order so nobody re-specifies them by hand.
3. Hardware, edge and profile compatibility
Two-tone doors often mix profiles: a handleless drawer front against a rebated door, or an integrated handle channel on one colour only. Record the handle type, its position, the edge profile and the door thickness for each colour group, plus hinge and slide specifications where the site team will be installing them. Handleless European cabinets in particular depend on consistent rail and rebate dimensions — if only one colour group is documented, the other arrives with a different reveal.
4. Aperture, appliance and interface dimensions
Two-tone schemes usually frame built-in appliances, glass display cabinets and stone backsplashes. Document finished outer dimensions, carcass heights, toe-kick depth, the aperture for each built-in oven, refrigerator or wine cabinet, and where worktop and splashback meet the doors. These are the numbers that decide whether the colour blocks line up across a run. Made-to-measure sizing is what makes a project-specific package possible, but it only works when the recorded dimensions match the site survey taken after plaster and screed.
5. Repeating units and unit counts
For apartment blocks and hotel floors, state how many identical kitchens are required and which of them may vary. Note the approved variation range — a shorter run at the end of a corridor, one mirrored layout per floor — so the colour split does not have to be redrawn for each unit. A single signed prototype kitchen, checked against the finishes schedule, settles more questions than any drawing note.
6. Packaging, labelling and site handling
Record how doors are labelled — by elevation, bay and colour group — and which units ship in which delivery phase. Two-tone packages go wrong on site when doors from two elevations of the same colour are packed together. Note storage conditions before installation as well: doors should stay in their wrapping, on level supports, inside a closed and dry building.
7. The sign-off record
Keep one file per project holding the approved elevations, finishes schedule, dimension drawings, hardware list, prototype approval and any agreed change notes. When a variation arrives later — a colour swap on the tall housing, an added glass cabinet with interior lighting — it can be priced against that record instead of argued from memory. This is also the file you hand to the installation team.
How we supply these packages
Our kitchen cabinetry is built to the dimensions, panel materials, surface finishes and layout on your drawings, with matching hinges, drawer slides, support legs and brackets available for the same order. Send elevations, a finishes schedule and appliance schedules; we return shop drawings for your sign-off before production. Where a project needs bespoke colour matching or door profiles, our custom and OEM service covers prototyping and finish development — see custom built-in kitchen cabinets for the specification detail.
Working on a villa, apartment or hospitality kitchen package? Send us the elevations and finishes schedule at santerson.com/contact and we will quote against your documentation.