A wood tone open wardrobe looks simple on a rendering: hanging rails, shelves, a warm timber-look carcass and no doors. That is exactly why quotes for it vary so widely. Two suppliers can describe the same elevation and deliver very different furniture, because most of the cost sits in details that never appear in a product name. Before you sign a purchase order, work through the checklist below line by line.
1. What the quote actually covers
Start with scope, not price. Ask the supplier to state plainly whether the figure is for a single wardrobe unit, a full wall of open storage, or a bedroom set that also includes floating TV units, niches and bedside joinery. Open wardrobes are frequently quoted as a "per linear metre" or "per module" rate, and accessories such as drawer banks, pull-out baskets, shoe shelves, rail lighting and dust decks are added later.
A usable quote lists every item separately with its own dimension, quantity and unit price. If one lump sum covers "bedroom storage", request an itemised breakdown before comparing it with anything else.
2. Substrate and surface, not just "wood effect"
"Wood tone" describes a colour direction, not a material. Ask which substrate carries the finish and which surface layer produces the grain:
- Melamine or laminate over an engineered board — the most common, cost-effective option for bedroom use.
- PVC or foil-wrapped panel — useful on routed and profiled edges.
- Wood veneer with lacquer or matte finish — real timber grain, with a different cost band and care requirement.
- Solid wood components — typically reserved for frames, trims and feature pieces.
Then confirm the board grade and thickness for carcass, shelves and back panel, and ask how edges are finished. On open wardrobes every edge is on display, so edge banding quality and colour match are visible in a way they never are behind doors. Our Wood Tone Open Wardrobes are made to measure with material and finish options selected per project, precisely so that the specified board, surface and edge treatment match what is drawn rather than what happens to be in stock.
3. Dimensions and how they were taken
Check whether quoted dimensions are factory sizes or site-verified sizes. Walls are rarely square, ceilings are rarely level, and skirting, architraves, light switches and air grilles all steal depth. Ask specifically how the supplier handles out-of-plumb walls and floor-to-ceiling heights, and whether a site survey or a dimensional sign-off is included in the price.
Confirm the load-bearing assumptions too: hanging rail span, shelf span under folded clothing and bedding, and the fixing method for any wall mounted open wardrobe section. Wall fixings into timber studs, masonry or a plasterboard substrate are different details, and the quote should say which one is assumed.
4. Hardware, fittings and integrated lighting
Hardware is where quiet substitutions happen. Ask for brands or at least performance classes for slides, hinges, soft-close mechanisms, rail supports and adjustable shelf pins. Drawer runners on an open wardrobe are seen every day, so specify full-extension runners with soft close rather than accepting "standard slides".
If the design includes lit niches or rail lighting, the quote must say what is included: the light source, driver or transformer, mounting channel, wiring route, access point for replacement, and switch or sensor control. Lighting quoted as "provision for LED" is not lighting.
5. Tolerance, sampling and finish approval
Timber-look surfaces shift in colour and sheen between batches. Ask the supplier to confirm a signed-off finish sample or approved drawing, and to state the acceptable tolerance for grain direction, joint gaps and panel alignment on delivery. For multi-bedroom projects, ask whether all panels come from one production batch.
A supplier offering custom built in kitchen cabinets and other made-to-measure joinery should be able to show you a prototype or a previous project reference for the same finish. Ask for it.
6. Packaging, freight and delivery terms
Open wardrobe panels are large, flat and easy to chip in transit. The quote should state packaging specification, panel protection, container loading plan and the Incoterms being priced. Confirm whether the price is ex-factory, FOB or delivered to site, and who carries customs clearance, duties, insurance and last-mile handling.
For projects abroad, ask how panels are labelled against the installation drawing, and whether spares for edge trim, shelf pins and hardware are shipped with the order. A short spare-parts allowance costs little and prevents a site stoppage.
7. Installation, snagging and after-sales
Clarify who installs: local trades from drawings, the supplier's own team, or supervision only. The quote should cover site protection, levelling and packing out, fixing to the substrate, alignment adjustment, snag rectification and handover documentation. Then read the warranty section for what is covered, for how long, on hardware as well as panels, and what voids it.
Ask how claims are raised and answered after delivery, and whether replacement panels can be re-produced to the same batch finish later in the project.
8. How to compare two quotes fairly
Lay both quotes against one table: substrate, surface, board thickness, edge treatment, hardware specification, dimensions and tolerance basis, lighting scope, packaging and delivery terms, installation responsibility, warranty and exclusions. A lower total that omits drawer banks, site survey, soft-close hardware and delivered-to-site terms is not cheaper — it is a different product.
Where a project needs wardrobes coordinated with cabinetry, wall panelling and other fixtures, one supplier carrying the whole joinery scope removes the argument over who owns a mismatch. That coordination, rather than the unit rate, is usually where the real saving sits.
Before you send the enquiry
Send the room elevation, floor plan, ceiling heights, your preferred finish reference and a list of what must be inside the wardrobe. The more precise the brief, the more directly the answers can be compared — and the fewer surprises arrive after the order is placed.
SANTERSON manufactures made-to-measure wardrobes, cabinetry and interior fixtures in China for villa, hospitality and office projects worldwide, with custom/OEM service, door-to-door logistics and installation support. Contact us with your drawings for an itemised quotation.