A quote for built-in storage is only as good as the detail behind it. Two suppliers can price the same Glass & Acrylic Combination Wardrobes scheme and produce figures that differ by a wide margin, because one has specified every panel, edge and hardware item while the other has quoted a rounded number per linear metre. Before you sign anything, work through the checks below so that the price on the page is the price you pay at handover.

What follows is a buyer-side checklist for wardrobe quotations on villa, apartment and hospitality projects: which line items must appear, which wording hides risk, and how to compare two quotes on an equal basis.

Start With the Scope Line, Not the Price Line

Every usable quotation opens with a scope statement. Read it before you look at any figure. It should say which rooms or zones are covered, whether the wardrobe is built-in or freestanding, and whether the quote includes scribing to uneven walls, skirting removal, cornice returns and any packing away of services that sit behind the run. On older villas and renovated apartments in particular, out-of-square walls are normal, and a quotation that assumes square walls will either exclude the scribing work or absorb it later as a variation.

Ask for the scope to be written per room. "Bedroom 1, three-metre run, floor to ceiling" is reviewable. "Master bedroom joinery" is not.

Confirm How the Wardrobe Is Measured and Priced

Combination glazed and acrylic fronts are usually quoted by linear metre of run, by square metre of elevation, or as a fixed sum per unit. Any of the three is acceptable, provided the quote states which one applies and shows the measured dimensions used. Check that heights are stated as finished floor level to ceiling soffit, and that the quote says whether corner returns, end panels and any overhead pelmet are inside the measurement or charged separately.

Pricing basisWhat must appear on the quote
Per linear metre of runLengths per room, which items are inside the rate (carcass, doors, shelves, hanging rail) and which are extras
Per square metre of elevationElevation drawings with dimensions, plus treatment of openings such as doors or niches
Fixed sum per unitA numbered item list per unit so substitutions can be priced against a named line

If two quotes use different bases, convert both to the same basis before comparing. A lower rate per metre means nothing if one supplier excludes end panels, internal fitout and hardware.

Check the Material Description Line by Line

A combination wardrobe mixes at least two front finishes, so the material schedule matters more than on a single-finish run. For each element the quote should name the substrate, the surface and the edge treatment.

  • Acrylic fronts: state whether the panel is high gloss or matte, and how the acrylic is bonded to the substrate. Ask what happens to a chipped edge panel and whether a replacement front can be ordered to match later batches.
  • Glass fronts: state the glass type, thickness, tint or treatment (clear, bronze, smoked, frosted or ribbed) and whether toughened safety glass is used on all glazed panels and doors. State which side of the panel is polished.
  • Carcass and internal panels: board type, thickness, decorative surface and colour reference. Colour names vary between suppliers, so a code or physical sample reference is worth insisting on.
  • Edges: edge banding material and thickness on visible carcass edges, and the finishing method on acrylic panel edges.

Where the quote says "as per standard range", request that standard in writing. Where a finish is bespoke, expect it to be priced as its own line rather than folded into a general rate.

Read the Hardware Schedule, Because That Is Where Quiet Substitutions Happen

Hinges, slides, lifts, handles, soft-close mechanisms and sliding-door tracks carry a wardrobe through years of daily use, and they are the items most often replaced with an equivalent when a price is trimmed. A complete quotation names each hardware item by brand and product reference, states load ratings for drawers and hanging rails, and identifies which items are included as standard versus upgraded.

  • Sliding runs: track type, hanger specification, whether soft close is included on every leaf or only one, and the maximum door size the track supports at the quoted height.
  • Hinged leaves: hinge type, adjustment method, and quantity per door based on door height and weight — a tall glazed door needs more than the standard pair.
  • Internal fitout: drawer slides and their load rating, pull-out rail or tray types, lighting provisions and how transformers or drivers are accessed after installation.

If the quote says "premium soft close throughout" with no reference, ask for the actual item. A substitution clause that allows "or equivalent" should name what counts as equivalent.

Verify Make-to-Measure Assumptions and Site Tolerances

Built-in wardrobes are made to measured openings, so the quotation should record who measured, when, and against which drawings. Confirm whether measurements were taken on site or taken from design drawings, and whether a re-measure before production is included. For a project being quoted offshore, this is also the moment to confirm who supplies the finished-floor levels, ceiling set-downs and any service locations that affect the run.

Ask how the design handles floor-to-ceiling variance. Floor-to-soffit heights across a single run commonly differ by several millimetres, and the answer is either a scribed pelmet, an adjustable levelling leg or a field-trimmed panel. Each has a different cost and finish consequence, and each should appear on the quote rather than be decided on site.

Practical note: our Glass & Acrylic Combination Wardrobes are made to project-specific dimensions, with material, finish and layout options selected per project. The quotation therefore lists sizing, finish selection and layout as confirmed items — ask for that confirmation sheet and check it against your drawings before production starts.

Compare Internal Layouts Before Comparing Prices

Two quotes at the same price can hold very different amounts of usable storage. Count hanging lengths, shelf counts, drawer counts and any tall or corner modules on each quote. Where one design favours shelving and another favours drawers, the difference in cost sits in the fitout, not the doors. If you are also weighing other configurations — Combination Modular Wardrobes, for example, or a walk-in layout such as L Shaped Walk in Wardrobes — put the layouts side by side on paper before you let price decide.

Check What the Quote Excludes, and How Variations Are Priced

The exclusion block is where a low headline price earns its keep. Common exclusions to look for: site preparation, electrical first fix for internal lighting, making good after installation, protective covering during other trades' work, and any second trip required because site conditions were not ready. Also check how variations are priced — an hourly rate plus material mark-up can turn a small change into a large invoice.

For wardrobes delivered from overseas manufacture, the exclusion block should also state which leg of transport sits with the supplier. A quotation that ends at the factory gate and one that ends at your site door are not comparable until freight, insurance, duties and on-site delivery are added to both.

Match Delivery, Packaging and Installation Terms to Your Programme

Ask for the production lead time measured from confirmed drawings and deposit, not from enquiry. Then check packaging specification — glazed fronts and high gloss acrylic panels need edge protection and separation suitable for the mode of transport, and packaging detail is worth asking about explicitly on multi-unit orders. Installation should be described in the quote: who installs, how long the run takes, what site conditions are assumed, and what inspection happens at handover.

For whole-project packages, wardrobe timing interacts with flooring, wall finishes and lighting. Coordinating those trades with one supplier's programme is a real advantage of sourcing built-in storage alongside other furniture and building materials on the same project, provided each trade's start conditions are still written into its own line item.

Ask About After-Sales Terms in Writing

Before awarding, get the after-sales position stated on the quotation: what is covered, for how long, who attends site, and how replacement fronts, panels or hardware are supplied. Spares matter more for combination wardrobes than for plain ones, because a future repair may need both an acrylic front in a matching finish and a glazed panel in a matching tint.

A Ten-Point Pre-Award Check

  • Scope written per room, with built-in or freestanding stated
  • Pricing basis declared, with measured dimensions shown
  • Acrylic finish, glass type and thickness, and carcass board all named with colour references
  • Toughened safety glass specified for all glazed panels and doors
  • Hardware listed by brand and reference, including soft close and load ratings
  • Who measured, when, and whether a pre-production re-measure is included
  • Floor-to-ceiling variance method stated (scribed pelmet, levelling leg or field trim)
  • Internal fitout quantities counted and compared across quotes
  • Exclusions block read in full, with variation pricing defined
  • Lead time, packaging standard, installation responsibility and spares terms on the page

A quote that survives those ten checks is usually worth more than a cheaper one that does not. If you want a comparison baseline for your own project, send drawings and room dimensions and ask each supplier to price against the same scope — the difference between suppliers then becomes visible in the line items rather than buried in the exclusions.

SANTERSON has manufactured furniture and building materials since 2008, with custom and OEM capability for villa, hospitality and office projects. Send your room dimensions and finish preferences for a line-item quotation you can compare on equal terms.