An outdoor swim spa only performs the way its specification promises once it is sitting on a prepared base, connected to the right supply and protected from the weather. That is why we treat the installation plan as part of the product, not as an afterthought. Below is the working checklist we apply to the Outdoor Swim Spa WS-PC08ST-L, a swim-and-hydrotherapy unit from our configurable range, so buyers, contractors and project managers can see exactly what has to be settled before the shell arrives on site.
1. The specifications that drive every other decision
Start with the published figures for this model, because they set the size of the slab, the length of the pipework and the capacity of the electrical supply. The catalog entry for WS-PC08ST-L records:
Catalog dimensions: 8490 × 2400 × 1470 mm
Control system: 1 set
Swim training system: 1 set
Filter pump: 1 pc
Jet total: 6 pcs
LED lights: 4
Total power: 6.55 kW
Features shown: water jets, LED lighting, ozone, swim training system
Two cautions before these numbers go into a drawing. First, the catalog lists total power for the model but does not state the supply phase, circuit rating or cable size; those have to be confirmed for the exact configuration ordered and checked against local wiring rules by a licensed electrician. Second, the water pump is not listed in this record, so it should be verified as included before anyone assumes it is on site with the shell.
2. Site selection and foundation
The unit is a long, narrow basin — roughly 8.5 m by 2.4 m in plan — so the base has to be laid out as a rectangle with working room around it, not just under the footprint.
- Load path. A full basin plus users is a heavy point load. Specify a reinforced concrete slab sized and reinforced by a local structural engineer for the site soil, drainage and loading conditions; we do not prescribe a slab thickness that ignores ground conditions.
- Level and square. Set out the slab level in both directions and square to the 8490 × 2400 mm footprint with clearances for access panels, steps and any cover mechanism.
- Clearance to plant. Leave accessible space at the equipment end so the filter pump, control system and ozone unit can be reached for routine service without draining anything.
- Drainage away from the shell. Grade the surrounding paving and provide a drain or soakaway so rainwater and splash-out run away from the base and never pond under the unit.
- Access route. Confirm that the delivery vehicle, crane or forklift can reach the final position, including gate widths, overhead wires and any pergola or roof structure above.
3. Electrical supply and bonding
With a total power figure of 6.55 kW for the model, the electrical plan needs to be settled during design, not on installation day:
- Confirm supply phase and circuit rating with us for the ordered configuration, then have the local electrician size the cable, protection device and any isolator accordingly.
- Provide a dedicated, weather-protected isolator within reach of the control system and within sight of the equipment compartment.
- Plan bonding and earthing for the shell, handrails, steps and any nearby metalwork in line with the wiring rules that apply at the project location. Requirements differ by country and state, so this is a local decision.
- Route cable in conduit below the slab or inside protected trunking, and leave spare capacity if lighting, a heat pump or automation may be added later.
4. Water, drainage and filling
- A fill point with a tap or quick connection near the unit, ideally frost-protected in cold climates.
- A discharge route for draining and backwashing that leads to an approved drainage point; check what site drainage the local authority permits for chemically treated water.
- Water treatment decisions — the model record shows ozone as a listed feature, and UV sterilisation appears in our catalog options — agreed before commissioning so dosing and testing have a defined routine.
5. Configuration options to fix before production
Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the option list is confirmed on the order rather than assumed. Each choice changes the installation plan:
- Heat pump adds a load, an outdoor unit position with airflow clearance, and a condensate path.
- Insulation affects how the base and side panels are enclosed and what ventilation the equipment compartment needs.
- Steps change the slab outline and the access approach, so they must be in the setting-out drawing.
- Sand filtration or UV adds plant space and pipework runs that have to be buried or boxed in neatly.
6. Surrounding landscape and structure
A swim spa of this length usually sits inside a wider outdoor scheme. Fix early who supplies and installs the paving, decking edge, pergola or louvered roof, glass balustrade, sun loungers and storage cabinetry around the basin, so tolerances meet at the boundary rather than on site. Where an overhead structure is planned, confirm that its posts do not block the equipment compartment or the crane lift path.
For villa and resort work we normally coordinate these adjacent items with the rest of the fit-out through our Turnkey Solutions, which cover villas, hospitality and office projects. Our Custom & OEM Service covers bespoke dimensions, finishes and material choices when a standard catalog size does not suit the plot.
7. Delivery sequence and responsibility split
Most installation disputes come from an unclear handover between supplier, freight forwarder, civil contractor and electrician. Put a simple table in the plan:
- Supplier: production, packaging, container loading, shipping documents, configuration confirmation.
- Freight and clearance: booking, import paperwork, duties, delivery window to site — see our Logistics & Door-to-Door Delivery page for the scope we handle.
- Civil contractor: excavation, slab, waterproofing, drainage, paving, setting-out to our dimensions.
- Local electrician and plumber: supply, bonding, isolator, fill and discharge connections, sign-off to local rules.
- Setting, connecting and commissioning: agreed in writing before the shell lands — our Installation & After-sales Support service covers on-site installation, inspection and snag lists, plus warranty coverage, spare parts and ongoing maintenance. Warranty terms, response times and installer availability should be confirmed for the project location in writing.
8. Commissioning and handover record
Close the plan with a documented sign-off so the owner knows what was actually installed:
- Level check of the set unit and visual inspection for transit damage before filling.
- Fill, then run the filter pump, swim training system and jets; confirm each of the six jet positions and all four LED lights operate.
- Verify the control system readings against the ordered configuration and record measured electrical values.
- Commission the ozone system and any UV option, then record the water chemistry baseline and the dosing routine agreed with the owner.
- Hand over as-built drawings, wiring schedule, warranty documents, spare-parts list and a maintenance calendar, plus a snag list with target dates.
Figures quoted above are the catalog values recorded for this model on our product page. Included equipment, electrical supply details and optional items should be confirmed for the specific configuration you order before any drawing is issued for construction.
Get an installation-ready quotation
Send us the site photos, a dimensioned plan and the option list you are considering. We will confirm which equipment is included in your configuration, flag what the local contractor must provide, and issue a quotation that matches the installation plan rather than the other way round. If the plot calls for a different footprint or treatment package, our Customizable Shape Outdoor Spa covers bespoke basin shapes and hydrotherapy configurations.