An arched French door is one of the easiest specification items to get wrong on a villa or hospitality project. The arch reads as a single design gesture, yet it involves opening geometry, frame construction, glazing, ironmongery and site tolerances that are usually decided months before installation. If you are sourcing from SANTERSON, this is what we suggest you compare line by line before you place an order.
1. Start with the opening, not the door
Arched openings rarely match a standard module. The springing point of the arch, the clear width at floor level and the finished floor levels on either side all change what the frame has to do. Before you ask for a price, confirm three things in writing:
- the structural opening dimensions taken on site, plus the intended finished floor and finished wall levels;
- whether the arch is a true semicircle, a segmental curve or a decorative arched head above a rectangular leaf;
- which side the hinges and the active leaf fall on, and whether the door meets a floor finish, a threshold or another opening.
Our Santerson Arched French Doors are supplied as made-to-measure units, so these dimensions and the selected specification are confirmed for each project rather than chosen from a fixed size grid. That is also why we ask buyers to send drawings or site photographs early: it saves a re-manufacture cycle later.
2. Frame, sash and panel construction
The curved member is the part that separates one quotation from another. Ask what the arched head is made from, how the curve is formed, and how the joint between the arch and the vertical stiles is detailed. A mitred joint on a tight radius will open up over time; a properly formed and reinforced head will not.
Then check the panel arrangement. Our classic paneled door range — including Classic French Double Doors — covers raised, recessed and glazed panel layouts, and each one can be specified to the project rather than taken as-is. If your design calls for a slim sightline instead of a traditional moulded profile, compare it against our Santerson Modern Slim Frame French Doors so the arch detail stays consistent across the whole joinery package.
3. Glazing and the hardware schedule
Glazing in an arched leaf is usually bespoke: the top light follows a curve, so it cannot be cut from a standard sheet. Confirm the glass build (single, double or laminated unit), the sightline of the astragal bars, and whether the curved light is a true shaped unit or a shaped cover over a flat pane. These two look similar in a rendering and behave very differently on site.
Hardware deserves its own line item. An arched double door carries more weight per leaf than a flat one, so hinge loading, the type of lock keep, the handle or pull specification and any restrictor or hold-open need to be listed together rather than assumed. We recommend buyers request a single hardware schedule covering every door on the floor plan, so ironmongery finishes match across the interior joinery.
4. Finish system and how it travels
Colour samples on a screen are not a specification. Ask which substrate the finish is applied to, whether the doors are sprayed or wrapped, and whether the underside and edges are sealed — an unsealed edge is where moisture damage starts in bathrooms, laundries and external-facing walls.
If you are furnishing several rooms at once, order the arch together with the matching joinery. Our Arched Paneled Wardrobes and Arched Niche & Full House Custom Wall Cabinet Project use the same curve language, so doors, wardrobes and wall panelling can be produced in one batch with one finish reference. Our Santerson Decorative Interior Doors and Santerson Flush Interior Doors cover the straight runs in the same package.
For export orders, packaging is a real cost line. Ask how glazed leaves are crated, whether arch heads are individually supported, and how the consignment is consolidated. We handle this through Logistics & Door-to-Door Delivery, including container loading and customs paperwork, so doors arrive with the rest of the fit-out rather than in a separate shipment that no one has scheduled for.
5. Commercial terms worth comparing
- What is included in the unit price — frame, leaves, glazing, ironmongery, sealing, or only part of it.
- Approval drawings — whether you receive a shop drawing to sign off before production starts.
- Change control — what happens to price and lead time if an opening moves after the survey.
- Batch consistency — how touch-up and replacement units are matched to the original finish reference.
- Site support — installation guidance, snag inspection and spare parts, which we cover under Installation & After-sales Support.
As a China furniture and building materials manufacturer, we supply doors as part of a wider fit-out package rather than as an isolated item. Buyers who group doors, cabinetry, wardrobes and wall finishes with one supplier usually end up with fewer interface problems on site — and a single point of contact when something needs correcting.
Send us the opening details. Share your drawings, a marked-up floor plan or site photographs, and we will come back with a specification and quotation for the arched French doors and the matching joinery. Contact PHILLIP on +86-13928214007, email santerson@qq.com, or use the contact page. Enquiries are answered within 24 hours during business hours (Monday–Saturday, 8:00 AM–6:00 PM GMT+8).