Drawer-focused modular wardrobes rarely fail because of the carcass. They fail because the people specifying it never had the project information they needed: which rooms the units belong to, what will actually be stored inside them, how the floor and wall finishes meet the cabinet, and who checks the opening line on site. Before a make-to-measure order is released, these are the project details that decide whether the layout keeps working for years or has to be re-made.

1. The room list, not just the wardrobe elevation

Send the supplier a room-by-room schedule rather than one attractive elevation. For each wardrobe in the project, note the room number or villa and hotel unit reference, the clear internal width, height and depth after floor finishes and skirting are accounted for, and whether the unit sits against a party wall, a tiled wall or a window reveal. Our Drawer Focused Modular Wardrobes are specified per project, with made-to-measure sizing and layout tailored to the space, so an incomplete schedule is the single most common reason for a re-survey.

For multi-unit work such as apartment floors, guest-room wings or villa clusters, mark which layouts repeat. Repeating modules are where consistency of drawer heights and handle alignment becomes visible across units, and where tolerances accumulate fastest if each room is measured separately by a different trade.

2. What the household or guest actually stores

Drawer pitch should follow the storage inventory, not habit. Count what goes in: folded knitwear and linens in shallow drawers; trousers and towels in medium drawers; heavier items such as denim stacks, bags or spare bedding in deeper ones. A compact bedroom usually needs more shallow and medium drawers than a walk-in of the same width, because hanging space is limited.

Where hanging is still required alongside deep drawer banks, a mixed layout is often easier to plan; see Combination Modular Wardrobes. Where bags, cases and out-of-season items live on high levels rather than in drawers, hanging-dominant layouts carry the rest of the room. Fix the storage inventory before fixing the drawer count.

3. Finishes, doors and how the unit reads in the room

Drawer fronts are large, repeated surfaces, so they set the tone of the whole joinery package. Specify the door style early, whether flat, handleless or paneled, and confirm which drawer fronts match the hanging cabinets and which are deliberately contrasted. Front material and finish are selected per project; laminate, lacquer, acrylic and veneer options are coordinated with the other cabinetry in the same building so that wardrobes, vanities and kitchen units do not read as three different suppliers.

Record the finish reference on the drawing, not just a colour name. Photographs of sample boards under site lighting are worth more than any written description when the fit-out is checked at handover.

4. Hardware, load and frequency of use

Hardware choice follows usage intensity. A private villa wardrobe may see a few openings a day; a guest-room or rental unit wardrobe sees many more, from users who do not know the mechanism. For high-frequency rooms, specify full-extension runners with soft close and confirm that the drawer sides and bottoms are rated for the loads you intend, because packed linens and books are heavy.

State which drawers are expected to carry weight daily, so those sit in the deeper, reinforced positions rather than at the top of the stack. Where a drawer front is very wide, ask how it is supported; an unsupported wide front sags over time and then binds.

5. Site conditions that decide installation

Three site details decide whether installation runs in a day or over two visits: floor level and straightness, the position of skirting and architraves, and the route the packed units travel to the room. Modular wardrobes are delivered as panels and modules, but they still need door widths, lifts and stair turns that allow the longest side panel through. Confirm this before the container or van is booked.

Agree in writing which trade prepares the opening: flooring, plastering, electrical or wardrobe installation, and at what stage. Scribe pieces solve uneven walls, but only if the installer is told to expect them.

6. Documentation that protects a multi-unit order

For more than one unit, ask for numbered layouts keyed to the room schedule, with each module tagged on the packaging to match. That single step prevents installers assembling the wrong drawer stack in the wrong bedroom and lets you sign off unit by unit instead of re-checking everything at the end.

Confirm dimensions and selected specifications for each project before production is released, and keep one approved reference drawing as the standard for every repeating layout. Our project services cover design coordination, production and site guidance through to installation, so the schedule you send at the start is what we work from.

A short pre-order checklist

  • Room-by-room schedule with clear dimensions measured over finished floor and wall surfaces
  • Storage inventory per room, translated into shallow, medium and deep drawer counts
  • Door style and finish reference, coordinated with the rest of the joinery package
  • Hardware specification matched to usage frequency and expected loads
  • Site notes on skirting, uneven walls and the delivery route to the room
  • Numbered layouts and matching packaging tags for every repeating module

Send us your room schedule, storage list and finish references, and we will return a drawer layout sized to the actual space. Enquire through our contact page to start the specification.