A bidet is one of the smallest items on a bathroom fixture schedule and one of the easiest to specify wrongly. On a villa or hotel package it usually appears as a single line under bathroom sanitary fixtures, ordered long after the vanity and tile have been approved, and installed by a plumbing subcontractor who was never given the drawing that shows what sits beside it. When the order is wrong, the correction lands on site: an outlet in the wrong wall, a fixture that no longer lines up with its companion WC, or a suite that reads as three different collections instead of one.

The Floor Standing Bidet 1038F is our freestanding ceramic bidet basin for bathroom hygiene, fixed to the wall through its back support rather than carried on a floor pedestal alone. Its curved body and glossy glaze are the easy part of the decision. The details that actually decide whether it installs cleanly are the ones listed below, and all of them should be settled before the fixture schedule is signed off.

1. What the bidet is being used for, and by whom

The first question is not technical. It is whether the bidet is a required fixture in every bathroom or an optional item in master suites only. In European-style villa work and in boutique hotel guest bathrooms, a bidet is normally treated as part of the standard suite alongside the WC and wash basin. In other markets it appears in one or two bathrooms per unit, which changes both quantity and the value of specifying a matched set.

That decision drives the rest of the schedule. A guest bathroom that only needs a wall-hung WC and a small basin does not need the same floor area allowance as a master bathroom planned around a full three-piece suite, and it does not need the same number of rough-in points on the wall.

2. Whether the room is being tiled and drained now or later

The 1038F stands on the floor and takes its load path through a back-to-wall fixing. That means the finished wall line, not the structural wall line, is what matters for setting out. Two numbers have to be frozen before the first piece of wall tiling: the distance from the finished wall face to the centre of the waste outlet, and the height of that outlet above the finished floor level.

If the wall build-up later changes — a thicker waterproofing layer in a wet area, a different adhesive bed, a service duct chased into the wall — the outlet moves with it, and the back panel of the bidet no longer sits tight against the tile. On renovation work this is the most common cause of an on-site problem: the existing waste was set out for the fixture that came out, not for the one going in.

Drainage route is the second half of the same question. Our ceramic bidets are offered in both floor-standing and wall-mounted forms, so the choice of mounting type has to agree with where the waste actually runs. The Wall Hung Bidet 1004F is fixed through a back panel and leaves the floor beneath it clear, which is why it tends to be specified where the wall cavity can carry the fixing and the waste, and where the client wants the floor kept unobstructed for mopping. Where the wall is a party wall, a stud wall without adequate noggins, or a finished surface that cannot be opened up, the freestanding 1038F is normally the simpler detail.

3. Which other fixtures share the wall

A bidet ordered on its own looks fine in a catalogue and looks wrong on a finished wall. Height of the rim, the radius of the bowl, the colour of the glaze and the profile of the front edge are all read against whatever stands next to them.

The 1038F is designed to pair with the same 1038 series toilet, so a project that specifies one normally keeps the other in the same collection. Where the wall-hung route has been chosen instead, the matching pairing is the Wall Hung Toilet 1038W, and the basin on the same wall can be taken from the Wall Hung Basin 1038WB. Where a two-piece WC is preferred — for example where access to the cistern for maintenance matters more than the floating look — the Two Piece Washdown Toilet 1038A sits on the floor in the same way as the bidet, and its outlet type has to be settled at the same time.

Keeping one series across a project also reduces the number of glaze samples that have to be approved. Ceramic glaze from different production lines can read differently under the same lamp, and a mismatch only becomes visible once both fixtures are installed and lit.

4. How many pieces are ordered, and in how many drops

Bidets are usually the lowest-count item on a sanitaryware order, which makes them easy to leave to a late variation. On a multi-unit project that is where problems start: the first batch is specified correctly, the second batch is ordered from a different series because the original line was not repeated in the revised drawing, and two visually similar but not identical fixtures end up installed in the same building.

Two practical habits prevent this. The bidet should appear on the fixture schedule with the same level of detail as the WC — model reference, mounting type, outlet position — rather than as a generic line item. And the order quantity should be set from the room-by-room schedule, not from a total, so that bathrooms which do not need a bidet are visibly excluded instead of being caught in a rounded-up figure.

For project work we handle these orders as bulk and customised runs through our custom and OEM service, which means the same specification can be repeated consistently across phases rather than re-selected each time.

5. Who cleans it, and how often

In a guest bathroom used once a week, surface maintenance is barely a consideration. In a serviced apartment or hotel room turned over daily, it is a specification point.

The 1038F carries a glossy ceramic glaze intended to resist dirt and limescale build-up, which keeps routine cleaning to a wipe-down rather than abrasive descaling. The gap between the fixture and the wall, and the shape of the base where it meets the floor tile, are the two places where cleaning effort is either saved or created — so the joint detail should be sealed on site and inspected in the snag list, not left to the tiler's judgement.

The same reasoning favours the wall-mounted 1004F in bathrooms where the floor has to be mopped daily: with nothing standing on the tile, there is no perimeter joint to work around.

6. What arrives together, and what does not

Bidet taps, pop-up waste, connectors and the fixing set are frequently supplied by different vendors on a project schedule, and each handover is a chance for something to be missed. Before the order is placed, confirm which items ship with the ceramic piece and which are procured locally, because the two decisions interact: tap hole position and spout reach depend on where the basin sits relative to the wall, and a tall vessel tap ordered for a bidet that was later moved will not clear the rim.

For projects where we supply more than ceramics, bathroom fixtures travel as part of the same procurement package as cabinetry, lighting and finishes under our turnkey solutions, with freight arranged through logistics and door-to-door delivery. Ceramic pieces are packed for export rather than for a single local drop, which matters when a container is opened on site and the fixtures have to survive being carried to upper floors.

A short pre-order checklist

  • Finished wall face line confirmed after tiling and waterproofing, not the structural line.
  • Waste outlet position and height recorded from the finished floor level.
  • Mounting type — freestanding or wall-hung — agreed against what the wall build-up can carry.
  • The companion WC and basin named by model on the same schedule line.
  • Glaze sample approved against the fixtures it will stand beside, under the room's actual lighting.
  • Tap, waste and fixing set allocated to a named supplier with a delivery date.
  • Quantities taken from a room-by-room schedule, with bathrooms that need no bidet shown as excluded.

Every item on that list can be settled from drawings. None of them can be settled cheaply once the tiles are on the wall. If you are assembling a bathroom fixture package for a villa or hospitality project, send us the room schedule and the outlet setting-out and we will confirm which ceramic series fits it — through the contact page.