A quotation for two tone acrylic cabinets can come back at very different prices from two suppliers, and the buyer often cannot tell why. The gap is rarely the panel material alone. It is usually what sits behind the words "two tone" and "acrylic": which surfaces carry which finish, how the doors are engineered, which hardware set was assumed, and which dimensions were measured on site. Writing those items down before you request a quotation turns an opinion-based comparison into a line-by-line one.
The notes below use our Acrylic Kitchen Cabinet collection as the reference case. The same field list works for any made-to-measure cabinetry package, and the matching two tone acrylic wardrobes follow the identical structure, so one specification sheet can cover both joinery types on a single project.
Start with the two tones, not the colour
"Two tone" describes a distribution, not a shade. Before any colour code is exchanged, state which runs carry the darker surface and which carry the lighter one. In practice this means splitting the package into three groups on the drawing:
- Tall and wall runs — pantry, oven housing, wall units above the bench. Dark surfaces here read as built-in joinery; light surfaces keep a small kitchen from closing in.
- Base and drawer banks — the work zone, where finish choice is also a maintenance decision.
- Island and peninsula fronts — the visible face of an open-plan kitchen, and the one place where a reversed split changes the whole room.
Record the split on the elevation drawing itself, with a legend, rather than in a covering email. Two suppliers given the same email and different drawings will deliver different kitchens.
Name the finish family for each group
Within our acrylic range, the finish families behave differently under the same colour code, so specify the family per group instead of assuming one finish across the package:
- High gloss acrylic fronts reflect light back into the room, which is why they suit window-poor or single-aspect kitchens. They also show fingerprints and side-lighting scuffs along an island edge.
- Matte acrylic fronts soften the same colour and hide handling marks on the base run, but a matte surface in a busy cooking zone needs a cleaning regime agreed with the end user.
- Metallic acrylic fronts carry pigment that shifts with the light. Approve them from a physical sample placed on site, not from a screen.
- Solid colour acrylic fronts give the flat, uniform face that most two tone drawings assume for the lighter run.
Mixing families inside one package is a legitimate design decision — gloss on the tall run, matte on the base, for instance. What creates problems is discovering it at delivery because the specification said only "acrylic".
Write down what holds the door up
The visible surface sits on a substrate and an edge, and both belong in the specification. State the door construction and the edge treatment for each finish family, because full-height tall doors and wide island fronts flex differently from a standard base door. For handleless fronts, specify the profile — J-pull, channel or recessed pull — and confirm the reveal dimension against the appliance heights you intend to integrate.
Hardware is where an incomplete specification costs the most time. List the hinges, slides and lift systems by brand and series, then state the loading for drawer banks and the opening angle for bi-fold and pocket doors. If a lazy Susan, pull-out larder or integrated appliance is in the package, it belongs on the same sheet — those items drive cabinet depths, and a depth that arrives as "standard" rather than measured is the most common cause of a snag list.
Give dimensions as a schedule, not a sketch
Our cabinetry is made to measure, with material and finish options and a layout tailored to the project. That flexibility only pays off when the numbers are final. A usable dimension schedule records, for every run:
- Overall width, height and depth of each unit, plus the plinth and cornice treatment;
- Finished floor level and ceiling level at both ends of the run — older slabs and ceilings are rarely level across a long wall;
- Positions of soil stacks, flues, isolating valves, sockets and the switchboard, measured from a fixed corner;
- Benchtop material and thickness, because a stone top changes the drawer-box height above it;
- Appliance schedule with model numbers, so cut-outs are not left to site.
For apartment and villa packages, add the access route from the lift lobby or front door to the kitchen. Panel lengths that cannot pass a stairwell or a tight corridor get cut on site, and a cut edge is a finish failure no supplier can remedy after the fact.
Fix the approval sequence before production
A clear specification only becomes useful once someone signs it. Our cooperation steps run from project brief and design proposal, to quotation and detail confirmation, then production, shipment and follow-up — so the two tone split, finish family, hardware set and dimension schedule should all be closed out at the second step, not during production.
Before releasing an order we confirm dimensions and the selected specifications for each project. Ask for that confirmation in writing as a marked-up drawing pack: elevations with the finish legend, a door-and-front list keyed to each elevation, a hardware schedule, and physical finish samples for every colour used on the package. For multi-unit work, one signed sample board per colour beats an unlimited number of email attachments.
Close the package around the cabinets
Two tone acrylic fronts rarely fail on their own; they fail against the finishes next to them. If the same project includes kitchen cabinets and hotel appliances, wall panelling, flooring or lighting, put those items on one coordination sheet with the trades that install them. Tolerance conflicts between joinery, tiling and stone are found at the wall, not in the drawing.
As a practical test, send your specification to two suppliers without explaining it. If their quotations cover different door constructions, hardware sets and depths, the document — not the price — is what still needs work.
Ready to specify a package
Send us your elevation drawings, the two tone split you want, and the appliance schedule. We will confirm the finish families, hardware set and made-to-measure dimensions for your project and return a quotation built on the same fields listed above, so nothing has to be guessed at site.