A shaker panel wardrobe looks simple on a drawing — a recessed centre panel inside a square frame, clean lines, nothing loud. That simplicity is exactly why the quotation stage decides whether the finished built-in fits the room and the budget. Get the request right at the start and you get one accurate price instead of three revisions. This guide walks through what to send, in what order, so the first number you receive is close to the final one.
What a shaker panel wardrobe actually is
The name comes from Shaker furniture making: a flat centre panel set into a four-piece frame, with the frame showing as a shallow shadow line. In cabinetry it reads as classic without being ornate, which is why it appears in both bedroom joinery and grey shaker cabinets for kitchens.
Our shaker panel wardrobe sits within the Classic Paneled Wardrobes collection, alongside raised panel wardrobes and recessed panel wardrobes. It is made to measure, so the size, layout and finish are set by your project rather than by a stock catalogue dimension. That is the single most important thing to understand before you ask for a price: you are buying a made-to-order item, and the quotation follows directly from what you specify.
Before you write: decide these four things
Most quote delays come back to four open questions. Answer them yourself first, then send them.
- The opening. Width and height of the wall, and whether the wardrobe runs floor to ceiling or stops below a cornice. Note skirting, architraves, radiators, air-conditioning returns and light switches in the path.
- The door type. Hinged or sliding. A hinged shaker front needs clearance to swing; a sliding arrangement saves that space but changes the carcass depth and the hardware.
- The interior layout. Long-hang sections, double hang for shirts, shelf runs, drawers, pull-out hampers, a lit display niche. Write down what you actually store — suits and coats behave differently from folded knitwear and bags.
- The finish. Painted, laminated, wood veneer or lacquered. If the wardrobe must match existing joinery, name that joinery and send a photo rather than a colour word.
If you are furnishing a whole villa or apartment at once, it is worth deciding the wardrobe door profile at the same time as the kitchen. A shaker front repeated across bedroom and kitchen makes the joinery read as one designed set, and it lets one supplier quote the full built-in package in a single pass.
The information to put in your enquiry
Send these items together. Each one removes a round of emails and tightens the price.
- Room drawings or a measured sketch. Even a hand drawing with dimensions is workable. A floor plan exported from your architect's set is better, because it shows wall thicknesses and door swings.
- Three rough photos. The wall itself, the opposite wall for context, and any junction the wardrobe has to meet — ceiling, window reveal or an adjacent run of cabinetry.
- Dimensions in one unit. Millimetres throughout. Mixed units cause more errors than any other item on this list.
- Quantities per room. Say how many wardrobes and where, so the whole bedroom set is quoted consistently rather than as separate one-off pieces.
- Finish reference. A paint code, a laminate name, or a photo of the joinery you want to match. If you have a physical sample, tell us before we quote, not after.
- Interior fittings preference. Drawer-focused, shelf-focused, or a mix of open and closed storage.
- Site location and delivery point. The villa or apartment address, or the port of discharge if you are arranging onward freight yourself. This is what lets us quote door-to-door delivery rather than leaving shipping as an unknown.
- Programme dates. When the joinery must be on site. This drives production sequencing, not just price.
For a residential project, that list is usually enough to start. For an apartment block or villa development, add the unit types and how many of each, so one wardrobe detail can be repeated across identical rooms instead of being redrawn every time.
How the quotation process runs
The workflow below is the one we follow on custom built-in furniture, from first message to handover.
- Consultation. You send drawings, dimensions and finish intent. We review what is specified and flag anything ambiguous — an unlabeled wall height, a door type not yet chosen.
- Design and planning. Layout proposals, elevations and material selection. This is where interior fittings are fixed and where awkward corners get resolved on paper instead of on site.
- Quotation and detail confirmation. A priced proposal against the confirmed drawings. Nothing gets produced until you sign off the elevations and the finish schedule.
- Production. Manufacturing with quality control at each stage, since a made-to-measure wardrobe cannot be swapped off a shelf if a dimension drifts.
- Logistics. Freight booking, packaging and container loading, export paperwork and shipment tracking through to the delivery point you named.
- Installation and after-sales. On-site fitting, inspection of the finished run, then support for any snag list and spare parts afterwards.
Questions buyers ask before requesting a quote
Can you make the wardrobe to non-standard ceiling heights?
Yes. Sizing is made to measure, including floor-to-ceiling runs under a sloped or stepped ceiling. Send the height at both ends of the wall for a sloped soffit, not just an average.
Can the shaker door match my existing kitchen cabinets?
In most cases yes, subject to the finish you specify. Send a photo plus the make and colour reference of the existing joinery, or a physical sample if one is available, and we confirm what can be matched before quoting.
Can I order wardrobes together with other built-in furniture?
Yes, and it usually simplifies the project. Wardrobes, vanity units, media walls and boutique style walk in wardrobes can be quoted and produced as one package under the same finish schedule, which keeps the timber, edging and paint consistent across rooms.
What if I do not have drawings yet?
Send photographs and measured dimensions. Interior design support covers space planning, layout proposals and 3D visualisations, so a measured site survey can be turned into production drawings before the quotation is issued.